Loading...
Art3_MBTA_FY19_Transit_AdobeIndian_App_CLOSEDITEM DESCRIPTION Qty Unit Unit Cost Total Cost 1 Sawcut and remove existing AC pavement 186 SF 10.00 1,860.00 2 Sawcut and remove existing AC drainage swale 1 LS 500.00 500.00 3 Grading 1 LS 5,000.00 5,000.00 4 8" thick Class II aggregate base 828 SF 3.00 2,484.00 5 4" thick AC 828 SF 10.00 8,280.00 6 4" thick AC sidewalk 120 SF 10.00 1,200.00 7 6" AC curb 100 LF 20.00 2,000.00 8 Install MBTA furnished bench and bus stop sign 1 EA 700.00 700.00 9 Construction staking 1 LS 2,000.00 2,000.00 Total construction: 24,024.00 City plan check and permit fees: 4,500.00 Adobe Rd and Indian Tr Bus Turnout Budget Estimate Engineer's Estimate Construction: Others: Imagery ©2019 Google, Map data ©2019 Google 100 ft Adobe Rd & Indian Trail