Art3_Redlands_FY17_BikePed_Citrus_App4/15/2020 1 of 1 Date: C83534 Item No. F, D or M Quantity Units Unit Cost Total Item Cost %$%$%$ 1 1 LS $10,000.00 $10,000 100%$10,000 2 1 LS $10,000.00 $10,000 100%$10,000 3 1 LS $2,000.00 $2,000 100%$2,000 4 100% 5 100% 6 1600 SF $8.00 $12,800 100%$12,800 7 140 LF $50.00 $7,000 100%$7,000 8 3 EA $7,000.00 $21,000 100%$21,000 9 100 LF $1.50 $150 100%$150 10 120 LF $3.00 $360 100%$360 11 1 LS $10,000.00 $10,000 100%$10,000 12 15000 SF $0.50 $7,500 100%$7,500 13 2 EA $500.00 $1,000 100%$1,000 14 1 LS $5,000.00 $5,000 100%$5,000 15 1 LS $3,000.00 $3,000 100%$3,000 16 17 100% 18 1600 SF $8.00 $12,800 100%$12,800 19 140 LF $50.00 $7,000 100%$7,000 20 3 EA $7,000.00 $21,000 100%$21,000 21 100 LF $1.50 $150 100%$150 22 120 LF $3.00 $360 100%$360 23 1 LS $10,000.00 $10,000 100%$10,000 24 15000 SF $0.50 $7,500 100%$7,500 25 2 EA $500.00 $1,000 100%$1,000 26 1 LS $5,000.00 $5,000 100%$5,000 27 1 LS $3,000.00 $3,000 100%$3,000 28 100% 29 100% 30 1600 SF $8.00 $12,800 100%$12,800 31 140 LF $50.00 $7,000 100%$7,000 32 3 EA $7,000.00 $21,000 100%$21,000 33 100 LF $1.50 $150 100%$150 34 120 LF $3.00 $360 100%$360 35 1 LS $10,000.00 $10,000 100%$10,000 36 15000 SF $0.50 $7,500 100%$7,500 37 2 EA $500.00 $1,000 100%$1,000 38 1 LS $5,000.00 $5,000 100%$5,000 39 1 LS $3,000.00 $3,000 100%$3,000 40 100% $225,430 $225,430 $11,272 <= 5% of eligible CON costs (max. decorative, if applicable) 25.00%$56,358 $56,358 $281,788 $281,788 Non-participating Costs $281,788 Signage Pavement Repair 12" Crosswalk Striping 24" Crosswalk Striping Demolition Slurry Seal Project Description:Citrus Avenue Pedestrian Safety Improvements Citrus Avenue from 7th to 9th Licensed Engineer in responsible charge of preparing or reviewing this PSR-Equivalent Cost Estimate:Jason Montgomery License #: Project Location: General Overhead-Related Construction Items Erosion Control Plan Traffic Control General Construction Items (non-decorative only) Engineer's Estimate and Cost Breakdown: Engineer's Estimate (for Construction Items Only) Cost Breakdown Eligible Costs/Items Ineligible Costs/Items Corps/CCC to construct Mobilization Citrus & 7th Item Demolition Subtotal of Construction Items: Decorative & Landscaping-related Items (Label items as "F" for Functional, "D" for Decorative, or "M" for a mix of Decorative and Functional) Citrus & 8th Signage Slurry Seal Construction Item Contingencies (% of Construction Items): Total (Construction Items & Contingencies) cost: 8" Curb & Gutter 4" Concrete 4" Concrete Pavement Repair Curb Ramp 12" Crosswalk Striping 24" Crosswalk Striping Demolition Slurry Seal Citrus & 9th Detailed Engineer's Estimate and Total Project Costs Important: Read the Instructions in the first sheet (tab) before entering data. Do not enter data in shaded fields (with formulas). Project Information: Agency:7/7/2017City of Redlands 12" Crosswalk Striping 24" Crosswalk Striping Total Project Cost:$281,788 4" Concrete 8" Curb & Gutter Curb Ramp Utility Adjustment Curb Ramp 8" Curb & Gutter Utility Adjustment Pavement Repair Utility Adjustment Signage 10 CITY OF REDLANDS MUNICIPAL UTILITIES AND ENGINEERING DEPARTMENT CITRUS AVENUE PEDESTRIAN SAFETY IMPROVEMENTS LOCATION MAP VICINITY MAP NTS NNNNNNNNN BRO O K SI D E A V E N U E OLIV E A V E N U E OLIV E A V E N U E FER N A V E N U E CYP R E S S A V E N U E CYP R E S S A V E N U E CENTER STREETCAJON STREETREDLANDS BOULEVARD REDLANDS BOULEVARD I-10 FREEWAY I -10 FREEWAY CITRUS AVENUE COLTON AVENUE TEXAS STREETCHURCH STREETUNIVERSITY STREET CITY OF REDLANDS MUNICIPAL UTILITIES AND ENGINEERING DEPARTMENTSEE SHEET 2 FOR WESTERLY LOCATIONSCITRUS AVENUE CITRUS AVENUE7TH STREET8TH STREET9TH STREET6TH STREET6 T H S T R E E T OLIVE A V E N U E NNNNNNNNN CITRUS AVENUE PEDESTRIAN SAFETY IMPROVEMENTS LOCATION MAP CITY OF REDLANDS MUNICIPAL UTILITIES AND ENGINEERING DEPARTMENT NNNNNNNNN OLIVE A V E N U E CITRUS AVENUE CITRUS AVENUE7TH STREET8TH STREET9TH STREETCITRUS AVENUE PEDESTRIAN SAFETY IMPROVEMENTS IMPROVEMENT PLAN