Loading...
Art3_RanchoCucamonga_FY17_Transit_AppCITY OF RANCHO CUCAMONGA SUMMARY Bus Stop Street Side Location Total Cost TDA Funds (80%)Local Funds (20%) 1 Lemon Ave.North East of Filkins Ave.$8,608 $6,886 $1,722 2 Milliken Ave.West South of Victoria Park Lane $10,891 $8,713 $2,178 3 Milliken Ave.East North of Central Park $5,880 $4,704 $1,176 4 Aspen St.North West of Red Oak St.$21,721 $17,377 $4,344 5 Etiwanda Ave.East North of Base Line Rd.$7,160 $5,728 $1,432 Total $54,259 $43,407 $10,852 Biennial Article 3 20% Fund Call for Projects Application Form FY 2016/2017 - FY 2017/2018 1. Bus Stop No.: 1 2. Project Title: Lemon Ave. Bus Pad, East of Filkins Ave. 3. Project Description (attach photos and more thorough description as appropriate): Install concrete bus pad between the curb and sidewalk. This project will provide transit riders easier access to local businesses. It will improve access for disabled riders by providing connection from the bus stop to the existing sidewalk. The project will be constructed within the existing right of way. 4. Location: North side of Lemon Ave, East of Filkins Ave. X Existing Bus Stop _________ New Bus Stop X Existing ROW _________ Easement Required 5. Project Cost Estimate: $ 8,608 6. Non-TDA Article 3 Project Matching Funds: $ 1,722 Source of Matching Funds: Local Funds 7. Requested Article 3 TDA Call for Project Funds: $ 6,886 8. Location Characteristics: 67 Bus Routes Serving Location 15 Number of Daily Buses Serving Location 1 Daily Boardings and Alightings 9. Relationship to 2011 Non-Motorized Transportation Plan projects, if any: N/A 10. Listing of Activity Generators and Attractors Served: The stop is surrounded by single family residentials. Route 67 provides service to or stops within the proximity of: Alta loma High School, Rancho Cucamonga High School, Etiwanda High School, Chaffey College and Chaffey Transit Center. North side of Lemon Ave., East of Filkins Ave., looking east. North side of Lemon Ave., East of Filkins Ave., looking west. Bus Stop 1 Lemon Ave. (N/S & West Bound), East of Filkins Ave. Item No.Item Quantity Unit Unit Cost Total 1 AC Pad & Sidewalk 0 TON $180 $0 2 PCC Pad & Sidewalk 418 SF $12 $5,016 3 PCC Access Ramp 0 SF $14 $0 4 PCC Retaining Curb 0 LF $32 $0 5 Install Cobblestone 0 SF $26 $0 6 Remove and Restore Landscaping and Irrigation 1 LS $500 $500 7 Adjust Pull Box to grade 0 EA $125 $0 8 Relocate Sign 1 EA $400 $400 9 Relocate Bench 0 EA $300 $0 10 Traffic Control 1 LS $1,000 $1,000 Subtotal $6,916 10%Contigency $692 Total $7,608 Design and inspection Fees $1,000 PROJECT TOTAL COST $8,608 TDA FUNDS (80%)$6,886 LOCAL FUNDS (20%) MATCH $1,722 Biennial Article 3 20% Fund Call for Projects Application Form FY 2016/2017 - FY 2017/2018 1. Bus Stop No.: 2 2. Project Title: Milliken Ave. Bus Pad, South of Victoria Park Lane 3. Project Description (attach photos and more thorough description as appropriate): Install concrete bus pad between the curb and sidewalk. This project will provide transit riders easier access to local businesses. It will improve access for disabled riders by providing connection from the bus stop to the existing sidewalk. The project will be constructed within the existing right of way. 4. Location: West side of Milliken Ave., South of Victoria Park Lane X Existing Bus Stop _________ New Bus Stop X Existing ROW _________ Easement Required 5. Project Cost Estimate: $ 10,891 6. Non-TDA Article 3 Project Matching Funds: $ 2,178 Source of Matching Funds: Local Funds 7. Requested Article 3 TDA Call for Project Funds: $ 8,713 8. Location Characteristics: 85 Bus Routes Serving Location 34 Number of Daily Buses Serving Location 4 Daily Boardings and Alightings 9. Relationship to 2011 Non-Motorized Transportation Plan projects, if any: Milliken Ave. from SR-210 to Fairmont Way (Table 5.71) 10. Listing of Activity Generators and Attractors Served: The stop is surrounded by single family residentials. Route 85 provides service to or stops within the proximity of: Montclair High School, Montrclair Transit Center, San Antonio Hospital, San Bernardino County Offices, Kaiser Clinic, Rancho Cucamonga Metrolink Station, Rancho Cucamonga Central Park, Los Osos High School, Chaffey College and Chaffey Transit Center. West side of Milliken Ave., South of Victoria Park Lane., looking north. West side of Milliken Ave., South of Victoria Park Lane., looking south. Bus Stop 2 Milliken Ave. (W/S & South Bound), South of Victoria Park Lane Item No.Item Quantity Unit Unit Cost Total 1 AC Pad & Sidewalk 0 TON $180 $0 2 PCC Pad & Sidewalk 591 SF $12 $7,092 3 PCC Access Ramp 0 SF $14 $0 4 PCC Retaining Curb 0 LF $32 $0 5 Install Cobblestone 0 SF $26 $0 6 Remove and Restore Landscaping and Irrigation 1 LS $500 $500 7 Adjust Pull Box to grade 0 EA $125 $0 8 Relocate Sign 1 EA $400 $400 9 Relocate Bench 0 EA $300 $0 10 Traffic Control 1 LS $1,000 $1,000 Subtotal $8,992 10%Contigency $899 Total $9,891 Design and inspection Fees $1,000 PROJECT TOTAL COST $10,891 TDA FUNDS (80%)$8,713 LOCAL FUNDS (20%) MATCH $2,178 Biennial Article 3 20% Fund Call for Projects Application Form FY 2016/2017 - FY 2017/2018 1. Bus Stop No.: 3 2. Project Title: Milliken Ave. Bus Pad, North of Central Park 3. Project Description (attach photos and more thorough description as appropriate): Install concrete bus pad between the curb and sidewalk. This project will provide transit riders easier access to local businesses. It will improve access for disabled riders by providing connection from the bus stop to the existing sidewalk. The project will be constructed within the existing right of way. 4. Location: East side of Milliken Ave., North of Central Park X Existing Bus Stop _________ New Bus Stop X Existing ROW _________ Easement Required 5. Project Cost Estimate: $ 5,880 6. Non-TDA Article 3 Project Matching Funds: $ 1,176 Source of Matching Funds: Local Funds 7. Requested Article 3 TDA Call for Project Funds: $ 4,704 8. Location Characteristics: 85 Bus Routes Serving Location 29 Number of Daily Buses Serving Location 6 Daily Boardings and Alightings 9. Relationship to 2011 Non-Motorized Transportation Plan projects, if any: Milliken Ave. from SR-210 to Fairmont Way (Table 5.71) 10. Listing of Activity Generators and Attractors Served: The stop is surrounded by single family residentials. Route 85 provides service to or stops within the proximity of: Montclair High School, Montrclair Transit Center, San Antonio Hospital, San Bernardino County Offices, Kaiser Clinic, Rancho Cucamonga Metrolink Station, Rancho Cucamonga Central Park, Los Osos High School, Chaffey College and Chaffey Transit Center. East side of Milliken Ave., North of Central Park, looking north. East side of Milliken Ave., north of Central Park, looking south. Bus Stop 3 Milliken Ave. (E/S & North Bound), North of Central Park Item No.Item Quantity Unit Unit Cost Total 1 AC Pad & Sidewalk 0 TON $180 $0 2 PCC Pad & Sidewalk 160 SF $12 $1,920 3 PCC Access Ramp 0 SF $14 $0 4 PCC Retaining Curb 0 LF $32 $0 5 Install Cobblestone 16 SF $26 $416 6 Remove and Restore Landscaping and Irrigation 1 LS $500 $500 7 Adjust Pull Box to grade 0 EA $125 $0 8 Relocate Sign 0 EA $400 $0 9 Relocate Boulders 3 EA $200 $600 10 Traffic Control 1 LS $1,000 $1,000 Subtotal $4,436 10%Contigency $444 Total $4,880 Design and inspection Fees $1,000 PROJECT TOTAL COST $5,880 TDA FUNDS (80%)$4,704 LOCAL FUNDS (20%) MATCH $1,176 Biennial Article 3 20% Fund Call for Projects Application Form FY 2016/2017 - FY 2017/2018 1. Bus Stop No.: 4 2. Project Title: Aspen St. Bus Pad, West of Red Oak St. 3. Project Description (attach photos and more thorough description as appropriate): Install concrete bus pad between the curb and sidewalk. This project will provide transit riders easier access to local businesses. It will improve access for disabled riders by providing connection from the bus stop to the existing sidewalk. The project will be constructed within the existing right of way. 4. Location: North side of Aspen St., West of Red Oak St. X Existing Bus Stop _________ New Bus Stop X Existing ROW _________ Easement Required 5. Project Cost Estimate: $ 21,721 6. Non-TDA Article 3 Project Matching Funds: $ 4,344 Source of Matching Funds: Local Funds 7. Requested Article 3 TDA Call for Project Funds: $ 17,377 8. Location Characteristics: 85 Bus Routes Serving Location 34 Number of Daily Buses Serving Location 1 Daily Boardings and Alightings 9. Relationship to 2011 Non-Motorized Transportation Plan projects, if any: N/A 10. Listing of Activity Generators and Attractors Served: The stop is surrounded by a church and office professional complexes. Route 85 provides service to or stops within the proximity of: Montclair High School, Montrclair Transit Center, San Antonio Hospital, San Bernardino County Offices, Kaiser Clinic, Rancho Cucamonga Metrolink Station, Rancho Cucamonga Central Park, Los Osos High School, Chaffey College and Chaffey Transit Center. North side of Aspen St., West of Red Oak St., looking west. North side of Aspen St., West of Red Oak St., looking east. Bus Stop 4 Aspen St. (N/S & West Bound), West of Red Oak St. Item No.Item Quantity Unit Unit Cost Total 1 AC Pad & Sidewalk 0 TON $180 $0 2 PCC Pad & Sidewalk 576 SF $12 $6,912 3 PCC Access Ramp 340 SF $14 $4,760 4 PCC Retaining Curb 145 LF $32 $4,640 5 Install Cobblestone 0 SF $26 $0 6 Remove and Restore Landscaping and Irrigation 1 LS $1,000 $1,000 7 Adjust Pull Box to grade 1 EA $125 $125 8 Relocate Sign 1 EA $400 $400 9 Relocate Bench 0 EA $300 $0 10 Traffic Control 1 LS $1,000 $1,000 Subtotal $18,837 10%Contigency $1,884 Total $20,721 Design and inspection Fees $1,000 PROJECT TOTAL COST $21,721 TDA FUNDS (80%)$17,377 LOCAL FUNDS (20%) MATCH $4,344 Biennial Article 3 20% Fund Call for Projects Application Form FY 2016/2017 - FY 2017/2018 1. Bus Stop No.: 5 2. Project Title: Etiwanda Ave. Bus Pad, North of Base Line Rd. 3. Project Description (attach photos and more thorough description as appropriate): Install concrete bus pad between the curb and sidewalk. This project will provide transit riders easier access to local businesses. It will improve access for disabled riders by providing connection from the bus stop to the existing sidewalk. The project will be constructed within the existing right of way. 4. Location: East side of Etiwanda Ave, North of Base Line Rd. X Existing Bus Stop _________ New Bus Stop X Existing ROW _________ Easement Required 5. Project Cost Estimate: $ 7,160 6. Non-TDA Article 3 Project Matching Funds: $ 1,432 Source of Matching Funds: Local Funds 7. Requested Article 3 TDA Call for Project Funds: $ 5,728 8. Location Characteristics: 67 Bus Routes Serving Location 15 Number of Daily Buses Serving Location 6 Daily Boardings and Alightings 9. Relationship to 2011 Non-Motorized Transportation Plan projects, if any: Etiwanda Ave. from Wilson Ave. to Base Line Rd. (Table 5.71) 10. Listing of Activity Generators and Attractors Served: The stop is surrounded by single family residentials. Route 67 provides service to or stops within the proximity of: Alta loma High School, Rancho Cucamonga High School, Etiwanda High School, Chaffey College and Chaffey Transit Center. East side of Etiwanda Ave., North of Base line Rd., looking north. East side of Etiwanda Ave., North of Base line Rd., looking south. Bus Stop 5 Etiwanda Ave. (E/S & North Bound), North of Base Line Rd. Item No.Item Quantity Unit Unit Cost Total 1 AC Pad & Sidewalk 10 TON $180 $1,800 2 PCC Pad & Sidewalk 0 SF $12 $0 3 PCC Access Ramp 0 SF $14 $0 4 PCC Retaining Curb 0 LF $32 $0 5 Install Cobblestone 0 SF $26 $0 6 Remove and Restore Landscaping and Irrigation 0 LS $500 $0 7 Adjust Pull Box to grade 0 EA $125 $0 8 Relocate Sign 1 EA $400 $400 9 Install 2"X4" Header 120 LF $20 $2,400 10 Traffic Control & Striping 1 LS $1,000 $1,000 Subtotal $5,600 10%Contigency $560 Total $6,160 Design and inspection Fees $1,000 PROJECT TOTAL COST $7,160 TDA FUNDS (80%)$5,728 LOCAL FUNDS (20%) MATCH $1,432 Date Action May 1, 2018 Begin Design June 28, 2018 Complete Design July 11, 2018 Seek Pemission to Advertise for Bids August 7, 2018 Open Bids September 5, 2018 Award project to qualified bidder September 24, 2018 Begin construction October 18, 2018 Complete Construction Bienneial Article 3 20% Fund - FY 2016/2017 & FY 2017/2018 Project Schedule