Loading...
Art3_Highland_FY17_Transit_AppEXHIBIT "A" ID No. Transit Stop # Transit Stop Location Number of Daily Buses serving location Daily Boarding s Daily Alightings Bus Route No. 1 6008 North Side Base Line west of Cole Avenue 59 7 7 3/4 2 6009 North Side Base Line east of Central Avenue 59 16 16 3/4 3 6010 North Side Base Line west of Vine Street 59 8 7 3/4 4 6011 North Side Base Line west of Victoria Avenue 59 13 10 3/4 5 6014 North Side Base Line at Guthrie Street 59 5 6 3/4 6 6015 North Side Base Line west of Sterling Avenue 59 41 23 3/4 7 8141 North Side Base Line west of Osbun Road 59 22 13 3/4 8 304 Street 32 14 3 15 9 305 Street 32 5 11 15 10 449 Boulder Ave northbound north of Baseline St 60 65 38 3 11 6006 southbound 56 9 21 4 12 6269 midblock 60 2 2 3 13 6268 Boulder Ave at Pacific southbound midblock 56 3 2 4 14 5709 Boulder Ave at Pacific northbound farside 60 2 2 3 15 6003 Boulder Ave at Pacific southbound farside 56 1 2 4 16 5710 Boulder Ave at Atlantic northbound farside 60 2 3 3 17 6002 Boulder Ave at Atlantic southbound farside 56 0 0 4 18 6001 Boulder Ave at Highland southbound farside 56 64 77 4 Totals: 279 243 Combined Total:522 OMNITRANS TRANSIT STOP SURVEY EXHIBIT “B” EXHIBIT “C1” PROPOSED CROSSWALK WITH IN-ROADWAY WARNING LIGHTS ON CENTRAL AVENUE AT HIBISCUS STREET BUS ROUTE No. 15 Central Avenue Speed Limit: 25mph 2030 Projected Traffic Volume on Central Avenue: 6,800vpd Pedestrian Generators within 300’ of proposed crosswalk on Central Avenue Cypress Elementary School Athletic Center YMCA Library Environmental Learning Center Community Park Cypress Elementary School Library/YMCA/ Environmental Learning Center/ Central Park Transit Stop #0305 Transit Stop #0304 Cypress Street Central Avenue 375’ Bus Route #15 Bus Route #15 Proposed New High-Visibility Crosswalk with In-Roadway Warning Lights N EXHIBIT “C2” PROPOSED CROSSWALK WITH IN-ROADWAY WARNING LIGHTS ON CENTRAL AVENUE AT HIBISCUS STREET BUS ROUTE No. 15 Transit Stop No. 0305 Transit Stop No. 0304 Construct Ramp Existing Ramp Proposed New Lighted Crosswalk CYPRESS E.S. LIBRARY, YMCA/ENVIRONMENTAL LEARNING CENTER CENTRAL AVE HIBISCUS ST N EXHIBIT “C3” This project will construct concrete transit stop landing area on the west side of Central Avenue south of Hibiscus Street at Transit Stop No. 0305 on Bus Route No. 15. Existing Sidewalk Existing Curb Construct Concrete Typical Obstruction Clearance This project will widen sidewalk around obstructions to provide minimum 4’ clearance for improved transit stop access along Bus Route Nos. 3, 4 and 15. Existing fence will be relocated as needed. EXHIBIT “C4” PROPOSED WIDENINGS AROUND SIDEWALK OBSTRUCTIONS Indicates Location of Sidewalk Widening to provide ADA clearance Around Obstruction Indicates Relocate Fence Transit Stop #6011 Sterling Ave Transit Stop #6010 Transit Stop #6009 Transit Stop #6008 Transit Stop #8141 Transit Stop #6015 Transit Stop No# Relocate Fence Rogers Ln Elm St Guthrie St Central Ave Cole Ave Vine St Victoria Ave BASE LINE – Bus Route No’s 3 and 4 BASE LINE – Bus Route No’s 3 and 4 N EXHIBIT “D” PROPOSED ACCESS IMPROVEMENTS ON BOULDER AVENUE BUS ROUTE No. 4 Indicates Location of Curb Ramp Modification Indicates Location of Bus Stop Indicates Bus Route Atlantic Ave Pacific St Guthrie St Boulder Avenue – Bus Route No 4 Beaver Medical Center Albertsons Shopping Center Base Line – Bus Route No. 15 Highland Avenue- Bus Route No. 4 EXHIBIT "E" Agency: Project Name: Project Location: Date of Estimate: Prepared by: Item No.Description Quantity Units Unit Cost Total 1 Install High-Visibility Crosswalk Markings on Central Ave Route #15 at Hibiscus St 1 EA 1,000$ $1,000 2 Install In-Roadway Warning Lights on Central Ave Route #15 at Hibiscus St 1 LS 45,000 $45,000 3 Construct New Curb Ramp at Central Ave/Hibiscus St 1 EA 3,500 $3,500 4 Construct New Concrete Landing at Transit Stop #0305 on west side Central Avenue near Hibiscus St 400 SF 10 $4,000 5 Construct Sidewalk Widening Around Obstructions (Route No's 3, 4 and 15)7 EA 1,000 $7,000 6 Relocate Fence on Sterling to make way for sidewalk widenings between Route No's 3, 4 and 15 600 LF 35 $21,000 7 Ramp Modifications for improved ADA access on Boulder Ave (Route #4)10 EA 3,000 $30,000 8 Install truncated domes for improved ADA access on existing Ramps on Boulder Avenue (Route #4)18 EA 600 $10,800 Subtotal:$122,300 Contingencies:$18,345 Mobilization:$6,000 SWPPP:$3,500 Traffic Control:$6,000 Construction Subtotal:$156,145 Construction Engineering:$23,422 Construction:$179,567 PS&E:$39,036 Total:$218,603 David Kinzle Detailed Engineer's Estimate For Construction Items Only City of Highland Transit Access Improvements along Bus Route Nos. 3, 4 and 15 Base Line, Boulder Avenue and Central Avenue in the City of Highland June 28, 2017 EXHIBIT “F” SURVEY AREA for obstructions in pedestrian paths