Art3_Redlands_FY13_BikePed_OBTIII_ExtRqst5_200929_CLOSED City of REDLANDS Incorporated 1888 Municipal Utilities & Engineering Department 35 Cajon Street, Suite 15A Redlands, CA 92373 909-798-7698 September 29, 2020 Josh Lee San Bernardino County Transportation Authority 1170 W. 3rd Street, 2nd Floor San Bernardino, CA 92410 City of Redlands Orange Blossom Trail: Transportation Development Act Grant Time Extension Dear Mr. Lee, As you are aware, the Orange Blossom Trail Phase III Project (Project) design is currently near completion. As part of the project, an asphalt concrete trail from Bryn Mawr Avenue to California Street and Alabama Street to Tennessee Street, will be constructed within San Bernardino Flood Control (Flood Control) right of way in Redlands (City). Previously, the design drawings were submitted to Flood Control to receive an encroachment permit. However, during production of the Water Quality Management Plan it was discover ed that infiltration is not allowed along the project footprint due to an existing contaminated plume. Additional drainage retention and grading design was needed to meet this requirement. The revised design was completed and submitted to Flood Control. The design included portions of the Orange Blossom Trail from Bryn Mawr Ave. to California St. and Alabama St. to Tennessee St. Currently, the City has submitted revised design drawings to Flood Control which includes an additional reach from Bryn Mawr Ave. to the I-10 Freeway and additional drainage design. The additional drainage design adds a trench drain, catch basin, and culvert in order to address a drainage issue found when revising the Water Quality Management Plan. These additions to the project will require an amendment to the Common Use Agreement made with Flood Control and additional hydrology and hydraulic calculations. Also, the new drainage design has triggered the need for Storm Water Construction General Permit and Water Board Certification. In the award letter for the grant, dated July 11, 2013, the anticipated completion date was June 30, 2016. The City is appreciative of the subsequent time extension requests granted and is, once again, formally requesting another time extension to December 31, 2021. To complete the project. Should you have any questions regarding the City’s time extension request, please contact me at (909) 798- 7584 ext. 4. Thank you, GERARD NEPOMUCENO Associate Engineer ROSS WITTMAN Municipal Utilities and Engineering