August 15, 2019
Cameron Brown
Senior Planner
San Bernardino County Transportation Authority
1170 W. 3rd Street, 2"d Floor
San Bernardino, CA 92410
City of Redlands Orange Blossom Trail: TDA Article 3 Grant Time Extension Request
Mr. Brown,
As you are aware, the Orange Blossom Trail Phase III Project (Project) design is currently near
completion. As part of the project, approximately 1 mile of trail, both asphalt concrete and
decomposed granite, from Bryn Mawr Avenue to California Street and Alabama Street to
Tennessee Street, will be constructed within San Bernardino Flood Control (Flood Control) right
of way in Redlands (City).
Currently, 100% drawings have been submitted to Flood Control for review and approval.
However, during production of the Water Quality Management Plan it was discovered that
infiltration is not allowed along the project footprint due to an existing contaminated plume. As
such, additional drainage retention and grading design is needed to meet this requirement.
Revised design is anticipated to be completed in early Spring 2020. Upon design completion, City
will work with Flood Control to receive an encroachment permit for trail placement within their
right-of-way and advertise the project for construction.
In the award letter for the grant, dated July 11, 2013 with an ancitipated completion date of June
30, 2016. The city is appreciative of the subsequent time extension requests granted and is, once
again, formally requesting another time extension to December 31, 2020 to complete the project.
Thank you for your understanding and should you have any questions, please contact me at 909-
798-7584 ext. 4233.
Sincer ly, 4
Savat Khamphou
Engineering Manager