Loading...
Art3_MBTA_FY13_Transit_MorongoBasinStops_AppBRD1303a2-ss ATTACHMENT 2 TRANSPORTATION DEVELOPMENT ACT ARTICLE 3 BIENNIAL CALL FOR PROJECTS FOR TRANSIT STOP ACCESS IMPROVEMENTS Issued: March 6, 2013 BRD1303a2-ss Biennial Article 3 20% Fund Call for Projects Application Form FY 2012/2013 - FY 2013/2014 1. Priority #: ________ 2. Project Title: Morongo Basin Bus Stop Area Improvements 3. Project Description (attach photos and more thorough description as appropriate): See Attached . 4. Location: See Attachment ____X____ Existing Bus Stop _________ New Bus Stop ________ Existing ROW _________ Easement Required 5. Project Cost Estimate: $ 86,490 6. Non-TDA Article 3 Project Matching Funds: $ 17,298 (20%) Source of Matching Funds: Capital funding FY 2014 MBTA budget 7. Requested Article 3 TDA Call for Project Funds: $ 69,192 8. Location Characteristics: See attached See Attached Bus Routes Serving Location See Attached Number of Daily Buses Serving Location See Attached Daily Boardings and Alightings N/A Anticipated ADA Cost Savings 9. Relationship to 2011 Non-Motorized Transportation Plan projects, if any: N/A . 10. Listing of Activity Generators and Attractors Served: See Attached . Article 3 Funding Application 2013 Project Descriptions Location 1 Location: Hwy 62 at Park Blvd – Eastbound, Joshua Tree Description: Construction of new sidewalk and retrofitting existing curb ramp to serve existing bus stop. Details: Construct approximately 60 feet of new sidewalk from existing bus pad to existing curb ramp located at the southwest corner of Hwy 62 and Park Blvd. and retrofit existing curb ramp by removing and replacing ramp concrete to eliminate existing grooves and to install detectable warning surface. Currently is a dirt path between the bus pad and the curb ramp and the ramp does not meet current ADA standards. Activity: Joshua Tree National Park Visitors Center, Joshua Tree Commercial Center businesses Routes: Route 1a and Route 1b (YV-29 Palms), 157 daily boardings. 15 Buses daily Location 2 Location: Hwy 62 at Park Blvd – Westbound, Joshua Tree Description: Construction of new sidewalk and retrofitting existing drive approach to serve existing bus stop. Details: Construct approximately 50 feet of new sidewalk from existing bus pad to existing drive approach located to the west, by removing and replacing drive approach concrete to provide accessibility across the drive approach. Currently is a dirt path between the bus pad and the drive approach and the approach does not meet current ADA standards. Activity: Joshua Tree National Park Visitors Center, Joshua Tree Commercial Center businesses Routes: Route 1a and Route 1b (YV-29 Palms), 160 daily boardings. 15 Buses daily Location 3 Location: Hwy 62 at Hallee Road – Eastbound, Joshua Tree Description: Construction of new bus pad and new sidewalk to serve existing bus stop. Details: Construct new bus pad and approximately 60 feet of new sidewalk from existing bus stop easterly to an existing curb ramp at a crosswalk. Currently the bus stop is in a dirt area and a dirt path exists between the bus stop and the curb ramp. Activity: Joshua Tree National Park Visitors Center, Joshua Tree Commercial Center businesses, Community grocery and pharmacy, post office Routes: Route 1a and Route 1b (YV-29 Palms), 25 daily boardings. 15 Buses daily Location 4 Location: High Desert Water District (55439 Twentynine Palms Hwy, Yucca Valley, CA 92284) Description: Construction of new bud pad to serve existing bus stop. Details: Relocate existing landscape and irrigation and construct new bus pad adjacent to existing sidewalk. Currently the bus stop is in a dirt area not meeting ADA standards. Activity: Water District Offices, MB Mental Health Services, Assisted Living Center, Dollar General Stores Routes: Route 1a and Route 1b (YV-29 Palms), Route 7a 17 daily boardings 15 Buses daily Location 5 Location: California Welcome Center (Hwy 62 at Trojan Way - Eastbound, Yucca Valley) Description: Construction of new bus pad and new sidewalk and retrofitting existing drive approach to serve existing bus stop. Details: Construct new bus pad and approximately 10 feet of new sidewalk from existing bus stop to existing drive approach located to the west, by removing and replacing drive approach concrete to provide accessibility across the drive approach. Currently the bus stop is in a dirt area and a dirt path exists between the bus stop and the drive approach, and the approach does not meet current ADA standards. Activity: High Desert Pregnancy Center, YV High School, Big Lots/Denny’s shopping center Routes: Route 1a and Route 1b (YV-29 Palms), Route 7a, 6 daily boardings 11 Buses daily Location 6 Location: Hwy 62 at Bonair Road – Eastbound, Joshua Tree Description: Construction of new bus pad and new sidewalk from existing bus stop to intersection to serve existing bus stop. Details: Construct new bus pad and approximately 30 feet of new sidewalk from existing bus stop to the southwest corner of the Hwy 62 and Bonair intersection. Currently the bus stop is in a dirt area with no bus pad and sidewalk. Activity: Joshua Tree National Park motels, MBTA Operations Center, Sunburst Sports Park, various multiple unit complexes Routes: Route 1a and Route 1b (YV-29 Palms), 18 daily boardings 15 Buses daily Item Description Quantity Unit Unit Cost Item Total 1 Sidewalk 360 SF 8.00 2,880.00 2 Retrofit existing curb ramp 1 EA 3,200.00 3,200.00 3 Detectable warning surface 1 EA 500.00 500.00 1 Sidewalk 300 SF 8.00 2,400.00 2 Retrofit drive approach 384 SF 16.00 6,144.00 1 Sidewalk 360 SF 8.00 2,880.00 2 Bus pad 160 SF 15.00 2,400.00 1 Bus pad 160 SF 15.00 2,400.00 2 Relocate landscape and irrigation 1 LS 3,000.00 3,000.00 1 Bus pad 160 SF 15.00 2,400.00 2 Sidewalk 90 SF 8.00 720.00 3 Retrofit drive approach 384 SF 16.00 6,144.00 1 Grading 520 SF 6.00 3,120.00 2 Bus pad 160 SF 15.00 2,400.00 3 Sidewalk 180 SF 8.00 1,440.00 1 Caltrans coordination & permit 1 LS 3,000.00 3,000.00 2 Traffic control 1 LS 8,000.00 8,000.00 3 Construction staking 1 LS 2,000.00 2,000.00 55,028.00 1,600.00 12,000.00 2,000.00 8,000.00 7,862.80 $86,490.80Project total: Article 3 Funding Application 2013 Preliminary Cost Estimate Caltrans permit: All locations: Total (all locations): Land surveying: Preliminary engineering: Construction engineering: Contingencies: Location 1: Hwy 62 at Park Blvd ‐ Eastbound, Joshua Tree Location 2: Hwy 62 at Park Blvd ‐ Westbound, Joshua Tree Location 3: Hwy 62 at Hallee Road ‐ Eastbound, Joshua Tree Location 4: Hi‐Desert Water District, Yucca Valley Location 5: CA Welcome Center (Hwy 62 at Trojan Way, Yucca Valley) Location 6: Hwy 62 at Bonair Road ‐ Eastbound, Joshua Tree