Biennial Article 3 20% Fund
Call for Projects Application Form
FY 2012/2013 - FY 2013/2014
1. Priority #: ________
2. Project Title: Morongo Basin Bus Stop Area Improvements
3. Project Description (attach photos and more thorough description as appropriate):
See Attached .
4. Location: See Attachment
____X____ Existing Bus Stop _________ New Bus Stop
________ Existing ROW _________ Easement Required
5. Project Cost Estimate: $ 86,490
6. Non-TDA Article 3 Project Matching Funds: $ 17,298 (20%)
Source of Matching Funds: Capital funding FY 2014 MBTA budget
7. Requested Article 3 TDA Call for Project Funds: $ 69,192
8. Location Characteristics: See attached
See Attached Bus Routes Serving Location
See Attached Number of Daily Buses Serving Location
See Attached Daily Boardings and Alightings
N/A Anticipated ADA Cost Savings
9. Relationship to 2011 Non-Motorized Transportation Plan projects, if any:
N/A .
10. Listing of Activity Generators and Attractors Served:
See Attached .
Article 3 Funding Application 2013
Project Descriptions
Location 1
Location: Hwy 62 at Park Blvd – Eastbound, Joshua Tree
Description: Construction of new sidewalk and retrofitting existing curb ramp to serve
existing bus stop.
Details: Construct approximately 60 feet of new sidewalk from existing bus pad to
existing curb ramp located at the southwest corner of Hwy 62 and Park
Blvd. and retrofit existing curb ramp by removing and replacing ramp
concrete to eliminate existing grooves and to install detectable warning
surface. Currently is a dirt path between the bus pad and the curb ramp
and the ramp does not meet current ADA standards.
Activity: Joshua Tree National Park Visitors Center, Joshua Tree Commercial
Center businesses
Routes: Route 1a and Route 1b (YV-29 Palms), 157 daily boardings.
15 Buses daily
Location 2
Location: Hwy 62 at Park Blvd – Westbound, Joshua Tree
Description: Construction of new sidewalk and retrofitting existing drive approach to
serve existing bus stop.
Details: Construct approximately 50 feet of new sidewalk from existing bus pad to
existing drive approach located to the west, by removing and replacing
drive approach concrete to provide accessibility across the drive approach.
Currently is a dirt path between the bus pad and the drive approach and the
approach does not meet current ADA standards.
Activity: Joshua Tree National Park Visitors Center, Joshua Tree Commercial
Center businesses
Routes: Route 1a and Route 1b (YV-29 Palms), 160 daily boardings.
15 Buses daily
Location 3
Location: Hwy 62 at Hallee Road – Eastbound, Joshua Tree
Description: Construction of new bus pad and new sidewalk to serve existing bus stop.
Details: Construct new bus pad and approximately 60 feet of new sidewalk from
existing bus stop easterly to an existing curb ramp at a crosswalk.
Currently the bus stop is in a dirt area and a dirt path exists between the
bus stop and the curb ramp.
Activity: Joshua Tree National Park Visitors Center, Joshua Tree Commercial
Center businesses, Community grocery and pharmacy, post office
Routes: Route 1a and Route 1b (YV-29 Palms), 25 daily boardings.
15 Buses daily
Location 4
Location: High Desert Water District (55439 Twentynine Palms Hwy, Yucca
Valley, CA 92284)
Description: Construction of new bud pad to serve existing bus stop.
Details: Relocate existing landscape and irrigation and construct new bus pad
adjacent to existing sidewalk. Currently the bus stop is in a dirt area not
meeting ADA standards.
Activity: Water District Offices, MB Mental Health Services, Assisted Living
Center, Dollar General Stores
Routes: Route 1a and Route 1b (YV-29 Palms), Route 7a 17 daily boardings
15 Buses daily
Location 5
Location: California Welcome Center (Hwy 62 at Trojan Way - Eastbound, Yucca
Valley)
Description: Construction of new bus pad and new sidewalk and retrofitting existing
drive approach to serve existing bus stop.
Details: Construct new bus pad and approximately 10 feet of new sidewalk from
existing bus stop to existing drive approach located to the west, by
removing and replacing drive approach concrete to provide accessibility
across the drive approach. Currently the bus stop is in a dirt area and a dirt
path exists between the bus stop and the drive approach, and the approach
does not meet current ADA standards.
Activity: High Desert Pregnancy Center, YV High School, Big Lots/Denny’s
shopping center
Routes: Route 1a and Route 1b (YV-29 Palms), Route 7a, 6 daily boardings
11 Buses daily
Location 6
Location: Hwy 62 at Bonair Road – Eastbound, Joshua Tree
Description: Construction of new bus pad and new sidewalk from existing bus stop to
intersection to serve existing bus stop.
Details: Construct new bus pad and approximately 30 feet of new sidewalk from
existing bus stop to the southwest corner of the Hwy 62 and Bonair
intersection. Currently the bus stop is in a dirt area with no bus pad and
sidewalk.
Activity: Joshua Tree National Park motels, MBTA Operations Center, Sunburst
Sports Park, various multiple unit complexes
Routes: Route 1a and Route 1b (YV-29 Palms), 18 daily boardings
15 Buses daily
Item Description Quantity Unit Unit Cost Item Total
1 Sidewalk 360 SF 8.00 2,880.00
2 Retrofit existing curb ramp 1 EA 3,200.00 3,200.00
3 Detectable warning surface 1 EA 500.00 500.00
1 Sidewalk 300 SF 8.00 2,400.00
2 Retrofit drive approach 384 SF 16.00 6,144.00
1 Sidewalk 360 SF 8.00 2,880.00
2 Bus pad 160 SF 15.00 2,400.00
1 Bus pad 160 SF 15.00 2,400.00
2 Relocate landscape and irrigation 1 LS 3,000.00 3,000.00
1 Bus pad 160 SF 15.00 2,400.00
2 Sidewalk 90 SF 8.00 720.00
3 Retrofit drive approach 384 SF 16.00 6,144.00
1 Grading 520 SF 6.00 3,120.00
2 Bus pad 160 SF 15.00 2,400.00
3 Sidewalk 180 SF 8.00 1,440.00
1 Caltrans coordination & permit 1 LS 3,000.00 3,000.00
2 Traffic control 1 LS 8,000.00 8,000.00
3 Construction staking 1 LS 2,000.00 2,000.00
55,028.00
1,600.00
12,000.00
2,000.00
8,000.00
7,862.80
$86,490.80Project total:
Article 3 Funding Application 2013
Preliminary Cost Estimate
Caltrans permit:
All locations:
Total (all locations):
Land surveying:
Preliminary engineering:
Construction engineering:
Contingencies:
Location 1: Hwy 62 at Park Blvd ‐ Eastbound, Joshua Tree
Location 2: Hwy 62 at Park Blvd ‐ Westbound, Joshua Tree
Location 3: Hwy 62 at Hallee Road ‐ Eastbound, Joshua Tree
Location 4: Hi‐Desert Water District, Yucca Valley
Location 5: CA Welcome Center (Hwy 62 at Trojan Way, Yucca Valley)
Location 6: Hwy 62 at Bonair Road ‐ Eastbound, Joshua Tree