Loading...
Art3_Twentynine_Palms_2026 Active Project StatusFrom:Lisa Chou To:"Georgy Herrarte" Cc:Abigail Hernandez; Richard Pedersen; Christina Benton; Dirk Lovett; Ginger Koblasz Subject:RE: TDA Article 3 Annual Report - Twentynine Palms Date:Wednesday, July 1, 2026 11:18:00 AM Attachments:2026 TDA Article 3 Annual Report - Twentynine Palms.pdf image001.png Hi Georgy, Thank you for providing the detailed progress report. I hope everyone has a happy 4th of July weekend! Thank you, Lisa Chou, AICP San Bernardino County Transportation Authority Contract Planner 1170 West Third Street, 2nd Floor San Bernardino, CA 92410 Office: 626.204.9801 Cell: 626.630.6127 From: Georgy Herrarte <georgyherrarte@caa.inc> Sent: Tuesday, June 30, 2026 5:30 PM To: Lisa Chou <lchou@gosbcta.com> Cc: Abigail Hernandez <AHernandez@29palms.org>; Richard Pedersen <richardpedersen@caa.inc>; Christina Benton <cbenton@29palms.org>; Dirk Lovett <dirklovett@caa.inc> Subject: TDA Article 3 Annual Report - Twentynine Palms CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Good Evening Lisa, Please see the attached Annual Report for the City of Twentynine Palms. Thank you, Georgy Herrarte Associate Engineer City of Twentynine Palms - Engineering Department 6136 Adobe Rd Twentynine Palms, CA 92277 georgyherrarte@caa.org CITY OFFICES: 6136 ADOBE ROAD TWENTYNINE PALMS, CA 92277 (760) 367-6799 Fax (760)367-4890 www.29palms.org COUNCILMEMBERS Daniel L. Mintz Sr, Mayor Octavious Scott, Mayor Pro Tem Steven Bilderain April Ramirez McArthur Wright CITY MANAGER Kevin Cole June 30, 2026 Lisa Chou Transmitted via email to: lchou@gosbcta.com Re: 2026 TDA Article 3 Annual Report – Twentynine Palms Dear Lisa Chou, The following is an annual proof of progress report for the Channel Trail Class I project in the City of Twentynine Palms. Over the past year, the Sherwood Engineering team completed all foundational engineering tasks necessary to support the 30% design milestone. This included the Geotechnical Investigation, which provided subsurface information for structural and drainage design, and the development of the Base Terrain Model and Existing Conditions Model, establishing accurate topographic and environmental baselines. The team also completed Proposed Conditions Model Iterations, refining the preliminary alignment and grading concepts for the trail corridor. Environmental work has begun, with Environmental Compliance activities underway, including initiation of CEQA review and preparation of technical studies. Although environmental clearance is not yet complete, substantial progress has been made toward meeting regulatory requirements. The team also prepared initial Permitting Documentation to support future agency coordination. Design progressed through the 30% milestone, including preparation of 30% plans, specifications, and a cost estimate, followed by a formal 30% Design Review. This milestone establishes the project’s preliminary geometry, cross-sections, drainage approach, and key design features. The project is now positioned to advance into 65% design once environmental clearance is further developed. At this time, we estimate 35% - 40% of this project is completed with an estimated $240,000 spent. At this time, no extension is required. Sincerely, Georgy Herrarte Associate Engineer City of Twentynine Palms