Art3_Rialto_FY25_BikePed_SRTS_AppTDA3 Bike Ped Application
Project Title: City of Rialto Safe Routes to School Improvements Project
Submitted Time: August 6, 2025 8:10 AM
Section A: Project Description (5 points total)
1.Project Title: City of Rialto Safe Routes to School Improvements Project
2.Project Cost
Preconstruction (including right-of-way): 891,000
Construction: 7,205,000
Total Project Cost: 8,096,000
3.Applicant Information
Agency: City of Rialto
Contact Name: Amparo Corona
Contact Email: acorona@rialtoca.gov
Contact Phone: 9094217244
4.Priority if Submitting Multiple Applications: 1
5.Project Category: "Large" (over $250,000) - $2,689,650 available
6.Clear Project Scope of Work
The project will install approximately 23,910 Linear Feet of new sidewalk, 150
ADA curb ramps, 6 RRFB installations, and 40 enhanced school zone signs. This
project directly implements recommendations from Rialto's Safe Routes to
School Plan (SRTS 2019).
7.Which type of project is being proposed? Safe Routes to School
8.Unless you are applying to create a Plan (in which case, skip to Question 10),
the proposed project MUST be included in SBCTA's Countywide Active
Transportation Plan (CATP). Select the CATP project in the map that best
represents the proposed project.
9.Verified project from CATP
Bike Path: Etiwanda Ave
Sidewalk Path: ETIWANDA AVE
Point of Interest:
School:
10. Optional: Enter any comments you wish to add.
Our project proposes improvements near seven schools in the surrounding
communities of west-central and north-central Rialto. The selected CATP project
shown on the map only represents one segment of the proposed project
locations.
Section B: Project Need & Purpose (30 points total)
11.A. List the destinations served. (5 points)
The proposed SRTS improvements serve nine schools including Werner
Elementary and Rialto Middle (adjacent locations), Preston Elementary and
Eisenhower High along Willow Avenue, Curtis Elementary connecting to Merrill
Avenue network, Boyd Elementary, Rialto High (highest walking percentage at
32%), and Dunn/Dollahan Elementary on Etiwanda Avenue. Major retail
destinations include Walmart plaza with restaurants across from Eisenhower
High, Superior Grocers and CVS on Baseline Road, and El Super plaza with
Planet Fitness near Curtis Elementary. Healthcare facilities including dental and
urgent care serve vulnerable communities. Transit connections via Omnitrans
Routes 10 and 15 provide citywide access. The warehousing complex offers
employment opportunities, while connections to Pacific Electric Trail Extension
and Cactus Avenue bike lanes enhance network connectivity.
11.B. Upload a map showing destinations served.
12. Provide data to support future use of the proposed project. (5 points)
The project will serve a diverse and substantial population with documented
need for enhanced pedestrian and bicycle infrastructure. Rialto maintains a
current population of approximately 103,391 to 104,026 residents according to
2023-2024 (Census, 2023), with an average age of 31 years, indicating a
younger demographic that benefits significantly from active transportation
infrastructure improvements. The project's primary service area encompasses
the Rialto Unified School District, which serves 25,454 students across 29
schools, with approximately 24,132 students in grades K-12 who will directly
benefit from the proposed improvements. (RUSD, 2025)
13. Enter "City Rank" according to SBCTA's Active Transportation Prioritization. (5
points)
0
Autofill score to be verified by SBCTA staff: 0
14.A. Describe how the project will improve student, cyclists, and/or pedestrian
safety. (5 points)
To improve student safety, the project includes new sidewalks at Dunn
Elementary to eliminate students walking in travel lanes, high-visibility
crosswalks at all schools, and a midblock crosswalk with RRFBs at Preston
Elementary addressing a documented jaywalking collision. ADA-compliant
signal modifications will enhance accessibility for disabled students. Cyclist
safety improvements include Class II bike lanes on Rialto Avenue addressing 3
See Attachment A
of 8 bicycle collisions in the project area, red curb markings to prevent parking
conflicts, and protected facilities separating cyclists from traffic. Pedestrian
safety features include speed feedback signs, enhanced school zone signage,
advanced yield lines at crosswalks, and ADA-compliant signal modifications at
key intersections.
14.B. Upload 5-years' worth of the most recent collision data available from the UC
Berkeley's Transportation Injury Mapping System.
15. Explain the multimodal or transit system connectivity provided by this project.
(5 points)
The project connects to Omnitrans Routes 10 (Baseline Road) and 15 (Merrill
Avenue), providing first-last mile transit access. New Class II bike lanes link to
Pacific Electric Trail Extension and Cactus Avenue facilities, creating continuous
multimodal corridors. ADA improvements ensure universal access. Connections
serve schools, employment centers, retail destinations, and residential
communities, benefiting transit-dependent populations including seniors and
students.
16. Attach other supporting documentation in a single .pdf. (5 points)
Sectoin C: Project Schedule/Readiness (15 points total)
17. Describe project readiness. (5 points)
The project demonstrates exceptional readiness with secured funding through
the ATP Cycle 7 grant award. With design phase initiation scheduled for
December 2025 and construction commencement by January 2027, the project
timeline reflects thorough preliminary planning and stakeholder coordination.
This accelerated schedule ensures timely delivery of critical safety
improvements for students and the surrounding community.
See Attachment B
See Attachment C
18. Has the agency delivered past projects on schedule as originally scoped? (5
points)
The City recently completed two SRTS projects funded by TDA Article 3 grants
by the June 30, 2025, deadline, and is making progress on two others ahead of
schedule. This track record shows extensive familiarity with TDA Article 3
requirements and strong agency relationships, ensuring consistent milestone
achievement and grant compliance.
19. What provisions does the agency have in place to ensure the facility will be
properly maintained? (5 points)
The City of Rialto's Public Works Department maintains streets, sidewalks,
traffic signals, and striping through proactive programs. The City invests
approximately $3.0 million annually in infrastructure maintenance, ensuring
long-term facility functionality and safe conditions for all users.
Section D: Cost Effectiveness (15 points total)
Total Units: 23,910
Units Used (ex. miles): Linear Feet
Cost per Unit: 338.6
Total Cost: 8,096,000
Section E: Match (25 points total)
Match $ Entry Required: 7,096,000
Total Cost: 8,096,000
Match %: 87.6
Points: 25
Section F: Historical Program Compliance (10 points total)
Total Compliance Score: 7