Art3_Fontana_FY25_BikePed_RandallPepper_AppTDA3 Bike Ped Application Project Title: Randall Pepper (O’Day Short) Elementary SRTS Sidewalk Gap Closure Submitted Time: August 6, 2025 5:00 PM Section A: Project Description (5 points total) 1.Project Title: Randall Pepper (O’Day Short) Elementary SRTS Sidewalk Gap Closure 2.Project Cost Preconstruction (including right-of-way): 135,317.48 Construction: 498,342.93 Total Project Cost: 633,660.41 3.Applicant Information Agency: City of Fontana Contact Name: Jeffrey Kim Contact Email: jkim@fontanaca.gov Contact Phone: 909-350-6724 4.Priority if Submitting Multiple Applications: 1 5.Project Category: "Small" ($250,000 or less) - $2,689,650 available 6.Clear Project Scope of Work The City of Fontana will install new sidewalks, ADA curb ramps and ADA driveways that will close existing gaps along the north side of Filbert St. and the east side of Lemon St. as “suggested routes” for students attending at least 3 different schools, Randall Pepper (O’Day Short) Elem., Citrus Elem. and Fontana High School. Randall Pepper is now O’Day Short Elementary as of Aug. 5, 2025. 7.Which type of project is being proposed? Pedestrian Improvement, Safe Routes to School 8.Unless you are applying to create a Plan (in which case, skip to Question 10), the proposed project MUST be included in SBCTA's Countywide Active Transportation Plan (CATP). Select the CATP project in the map that best represents the proposed project. 9.Verified project from CATP Bike Path: Sidewalk Path: 4TH ST Point of Interest: School: 10. Optional: Enter any comments you wish to add. In early 2025, the City completed the ATP Fontana SRTS Gap Closure Project that installed missing sidewalk, ADA curb ramps, high-visibility crosswalks, lighting and Class II & III bikeways near four public schools. The proposed project will complement the newly installed improvements. Section B: Project Need & Purpose (30 points total) 11.A. List the destinations served. (5 points) The sidewalk proposed will make active transportation feasible, enhance safety and convenience for students and residents traveling to and from their respective schools (Exhibit D). Schools. As a SRTS Project, the proposed project will create designated pedestrian routes to at least 2 schools, Randall Pepper Elem. School and Fontana High School. Randall Pepper Elem. is County ranked #7 and City Ranked #3 and Fontana High is County Ranked #39 and City Ranked #9 in the priority list (Exhibit B1, B2, F). Parks. As shown on Exhibit B1, B2, G & H, the project location is within SBCTA’S POI Pedestrian Plan which includes the Jack Bulik Park as County Ranked #73 and City Ranked #4. Government Properties. Fontana Unified School District (USD) Office, Fontana USD Facilities, Maintenance & Operations and Transportation Site, and Fontana Unified School Police Department are all within a mile radius adjacent to a continuous bicycle path from the proposed project (Exhibit B2, D). 11.B. Upload a map showing destinations served. 12. Provide data to support future use of the proposed project. (5 points) Per “(Safe Routes Partnership)”, we can assume that an increase of an average of 18% of school aged children will walk to school with new infrastructure improvements. This will generate roughly 538 more users. Per “Census,2023”, the population increased from 6,021 to 6,123 in 2023. Per “CalEnviroScreen Data”, this area has an 80% CalEnviroScreen Percentile indicating the census tract experiences a greater burden of pollution and vulnerabilities. Per “Randall Pepper Elem. 2023-24 SARC”, there were 480 students and 93.50% were socioeconomically disadvantaged, 16% with disabilities & 1.70% homeless, 94.40% Hispanic, 3.30% Black, 1.90% White, and 0.40% mix race. Per “Fontana High 2023-24 SARC”, there were 2,455 students and 95.30% of were socioeconomically disadvantaged, 12.70% with disabilities and 0.50% homeless, 95.20% Hispanic, 1.80% Black, 1.70% White, 0.60% Asian, 0.20 Filipino, 0.10% Native Hawaiian or Pacific Islander and 0.40% mix race. 13. Enter "City Rank" according to SBCTA's Active Transportation Prioritization. (5 points) 3 See Attachment A Autofill score to be verified by SBCTA staff: 3 14.A. Describe how the project will improve student, cyclists, and/or pedestrian safety. (5 points) The City has received repeated emails from residents urging the closure of the sidewalk gaps within the proposed project area. They expressed concerns that the absence of sidewalks prevents students, or those with mobility challenges, from safely walking to and from the schools. Due to the sidewalk gap, pedestrians must walk in the street or cross the street to get to the existing sidewalk. To minimize the potential for future pedestrian collisions, closing the sidewalk gaps at the proposed project locations will provide a designated path of travel for students and residents rather than sharing the roadway with vehicular traffic. From the “TIMS - Transportation Injury Mapping System”, a 5- year (2020-2024) collision data (Exhibit I) report was retrieved. The exhibit shows a few pedestrian collisions surrounding the proposed project areas. The availability of accessible sidewalk pathways around schools and parks could possibility be why there are very few accidents. 14.B. Upload 5-years' worth of the most recent collision data available from the UC Berkeley's Transportation Injury Mapping System. 15. Explain the multimodal or transit system connectivity provided by this project. (5 points) The proposed project will provide a continuous and accessible connection to OMNI Transit services through sidewalks and bicycle lanes. Pedestrians will be able to reach two different bus routes from multiple directions (Exhibit D&E). Omnitrans Rte 82: travels through the Cities of Rancho Cucamonga, Ontario & Fontana. Omnitrans Rte 61: travels through the Cities of Fontana, Ontario & Pomona. Transit/Transfer Centers (TC): Pomona TC, Ontario Mills Mall, South Fontana TC & Fontana Metrolink TC 16. Attach other supporting documentation in a single .pdf. (5 points) See Attachment B See Attachment C Sectoin C: Project Schedule/Readiness (15 points total) 17. Describe project readiness. (5 points) The proposed project is in preliminary design phase. Exhibit K provides a schedule to complete the project. A Notice of Exemption will be filed for CEQA and a WQMP is not warranted. Residents have reached out to the city regarding sidewalk gaps within the project area and the City has prioritized their concerns. Moreover, the proposed project will close all the missing sidewalk gaps within a 1/4 mile radius of the indicated and recognized SBCTA Portal (SRTS) & SBCTA CATP (2025) (Exhibit B1&F). 18. Has the agency delivered past projects on schedule as originally scoped? (5 points) The City of Fontana has been successful in the delivery of past TDA grants received. TDA grants received in 2021 were completed within a year before the deadline. TDA grants received in 2023 are scheduled to finish within a year before the deadline. The City has assembled a project team of highly qualified Project Managers that can manage, facilitate, and deliver a successful project. The same process and method will be used for this project. 19. What provisions does the agency have in place to ensure the facility will be properly maintained? (5 points) City of Fontana’s Public Works Department is responsible for the maintenance of the City’s streets and sidewalks. The City also monitors the City’s “Fontana 311” online application increasing response times to concerns and requests. Section D: Cost Effectiveness (15 points total) Total Units: 0.18 Units Used (ex. miles): Miles Cost per Unit: 3,520,335.61 Total Cost: 633,660 Section E: Match (25 points total) Match $ Entry Required: 383,660.41 Total Cost: 633,660 Match %: 60.5 Points: 25 Section F: Historical Program Compliance (10 points total) Total Compliance Score: 8 Attachment A: Project Location Map City of Fontana Randall Pepper (O’Day Short) Elementary School SRTS Sidewalk Gap Closure Attachment A Exhibit B1. Mile Radius within Project Locations This map indicates mile radiuses of ¼ mile for pedestrians and ½ mile for bicyclist. LEGEND Project Site & Mile Radius Project Site & Mile Radius Parks School Campus Existing Bike Lanes installed early 2025 from an ATP Project Traffic Signal Intersection Stop Intersection Government/ Public Buildings Exhibit B2. Mile Radius within Project Locations This map indicates mile radiuses of ¼ mile for pedestrians and 1 mile for bicyclist. LEGEND Project Site & Mile Radius Project Site & Mile Radius Parks School Campus Existing Bike Lanes installed early 2025 from an ATP Project Traffic Signal Intersection Stop Intersection Government/ Public Buildings Exhibit C. City GIS Database for Existing Sidewalk Surrounding Project Locations LEGEND Project Site Existing Sidewalk Exhibit D. SBCTA Active San Bernardino Open Data Take A Walk Project Site Suggested 1/4 Mile Pedestrian Route from Project Site This map is intended to encourage adults and students to consider walking or biking to and from project site. Adults are responsible for choosing the most appropriate route based of the area and skill level of their children. How to use this map: School Location Exhibit I. SWITRA GIS Map 5-Year Collision Data Attachment B Project Location Exhibit E. SBCTA Active San Bernardino Open Data Take A Transit This map is intended to encourage adults and students to consider walking or biking from project site to any transit stops. Adults are responsible for choosing the most appropriate route based of the area and skill level of their children. How to use this map: Omnitrans Route 82: At the Lemon St. project location, pedestrians will have a full paved sidewalk connection walking westbound, within a quarter mile, to the bus stop located at Citrus Ave. and Randall Ave. For the Filbert St. project location, pedestrians will have a designated bike path to this bus stop. They will be able to travel westbound on Filbert St. towards northbound Cypress Ave. onto Randall Ave. going westbound to reach Citrus Ave. It also has eight (8) transfer points: Day Creek Route 66, Rancho Cucamonga Route 85, Rancho Cucamonga Metrolink, Ontario Mills Mall, Fontana Metrolink Transit Station, Omnitrans Route 312, Omnitrans Route 14, and Omnitrans Route 10. It has several points of interests which include Victoria Gardens, Toyota Arena, Social Security Administration, Amazon, and five (5) different schools. Omnitrans Route 61: At the project location at Lemon St., there is a designated bike path of connectivity, within a mile, to Route 61. Bicyclists will be able to bike westbound on Randall Ave. and then head southbound on Citrus Ave. to arrive at the westbound bus stop located on Citrus Ave. and San Bernardino Ave. From this location, they can also bike eastbound on Randall Ave. and then head southbound on Oleander Ave. to arrive at the bus stop on San Bernardino Ave. and Oleander Ave. At the Filbert St. project location, bicyclists will have another designated bike path connection to this bus route. Heading westbound on Filbert St. and then head southbound on Cypress Ave. to arrive at the San Bernardino Ave. and Cypress Ave. It has four (4) different. It also has 11 different points of interest: Indian Hill Mall, Ontario Civic Center, Department of Human Services, Ontario Convention Center, Ontario International Airport, Toyota Arena, Ontario Mills Mall, Kaiser Hospital, W.V. Detention Center, and Fontana High School. This route also includes nine (9) different Transfer Points to routes 88, 85, 84, 83, 87, 380, 81, 82 and 19. Attachment C Exhibit F. SBCTA ATP Safe Routes to School ATP Priority List Exhibit G. SBCTA Point of Interest Pedestrian Plan Exhibit H. SBCTA ATP Point of Interest Pedestrian Plan ATP Priority List Exhibit J.1 Project Location Existing Photos (Filbert St.) Exhibit J.2 Project Location Existing Photos (Filbert St.) Exhibit J.3 Project Location Existing Photos (Filbert St.) Exhibit J.4 Project Location Existing Photos (Lemon St.) Duration (Days)Date -8/6/2025 -11/24/2025 *Assumed date for Grant Award Notice 60 1/23/2026 30 2/22/2026 0 11/24/2025 Environmental 30 12/24/2025 0 12/24/2025 *Assumes CEQA Only PS&E 14 1/7/2026 5 1/12/2026 28 2/9/2026 21 3/2/2026 7 3/9/2026 21 3/30/2026 21 4/20/2026 240 12/16/2026 Utility Coordinations 0 12/16/2026 0 12/16/2026 R/W (Acquisitions Not Required) 0 1/7/2026 0 1/7/2026 0 1/7/2026 0 1/7/2026 0 1/7/2026 0 1/7/2026 0 1/7/2026 0 1/7/2026 0 1/7/2026 0 1/7/2026 0 1/7/2026 Construction 35 1/20/2027 30 2/19/2027 45 4/5/2027 30 5/5/2027 14 5/19/2027 14 6/2/2027 50 7/22/2027 30 8/21/2027 60 10/20/2027 Exhibit K. Project Schedule City Council Acceptance Project & Grant Close Out Award Construction Contract Review Project Submittals Hold Pre-Construction Meeting Issue NTP Begin Construction End Construction Award Contract/Execute Contract Hold Kick-Off Meeting/Issue NTP Conduct ROW Negotiations or Acquire Permits to Enter/Construct (PTEC) Submit RFA/Right of Way Cert to Caltrans Federal Review/Approval (R/W Clearance Date) Advertise for Construction RFA ROW Approved Prepare RFP ROW Consultant Services Issue RFP Advertise RFP Receive/Distribute/Review/Rank Proposals Negotiate Contract Receive/Distribute/Review/Rank Proposals Contract Negotiations (if necessary) Award Contract/Execute Contract Hold Kick-Off Meeting/Issue NTP Prepare/Complete PS&E PS&E Ready to List Begin PS&E Process Prepare/ Record CEQA (CE) Environmental Complete Prepare RFP PS&E Issue RFP on PlanetBids Advertise RFP Claim Form/Authorizing Resolution Master Agreement/City Council Award Grant Application Deadline Grant Award/ SBCTA Adoption Construction Costs Item Description of Items Est. Qty. Unit Unit Price Bid Amount Participating Costs Non-Participating Costs 1 MOBILIZATION/DEMOBILIZATION 1 LS 25,000.00$ $ 25,000.00 $ 25,000.00 2 CLEARING, GRUBBING, MISCELLANEOUS REMOVALS 1 LS 10,000.00$ $ 10,000.00 $ 10,000.00 3 BEST MANAGEMENT PRACTICE WPCP AND NPDES REQUIREMENTS PER BID DOCUMENT 1 LS 12,000.00$ $ 12,000.00 $ 12,000.00 5 REMOVE EXISTING PCC SIDEWALK AND CURB RAMP 156 SF 8.00$ $ 1,248.00 $ 1,248.00 6 REMOVE EXISTING TREE AND ROOTS 5 EA 3,500.00$ $ 17,500.00 $ 17,500.00 7 CONSTRUCT 4" PCC SIDEWALK OVER 12" MINIMUM 90% COMPACTED NATIVE SUBGRADE PER CITY OF FONTANA STD. PLAN NO. 1006. 2943.52 SF 18.00$ $ 52,983.36 $ 52,983.36 8 REMOVE EXISTING AND RECONSTRUCT 6" PCC RESIDENTIAL DRIVEWAY RAMP OVER 12" MINIMUM 95% COMPACTED NATIVE SUBGRADE PER CITY OF FONTANA STD. PLAN NO. 1001. 324 SF 30.00$ $ 9,720.00 $ 9,720.00 9 REMOVE EXISTING AND CONSTRUCT NEW 6" PCC DRIVEWAY TRANSITION OVER 12" MINIMUM 95% COMPACTED NATIVE SUBGRADE. 1545 SF 25.00$ $ 38,625.00 $ - $ 38,625.00 10 REMOVE EXISTING AND RECONSTRUCT 6" COLORED PCC DRIVEWAY TRANSITION IN KIND OVER 12" MINIMUM 95% COMPACTED NATIVE SUBGRADE. 260 SF 40.00$ $ 10,400.00 $ - $ 10,400.00 11 SAWCUT AND REMOVE EXISTING AC PAVEMENT AS REQUIRED FOR IMPROVEMENTS 1,993 SF 3.00$ $ 5,977.50 $ - $ 5,977.50 12 CONSTRUCT 4.5" A.C. PAVEMENT OVER 12" MINIMUM 95% COMPACTED NATIVE SUBGRADE PER CITY OF FONTANA STD. PLAN NO. 1008. 55 TONS 230.00$ $ 12,650.00 $ - $ 12,650.00 13 GRIND EXISTING A.C. PAVEMENT 2" MINIMUM.1852.75 SF 2.50$ $ 4,631.88 $ - $ 4,631.88 14 CONSTRUCT 2" A.C. OVERLAY.27 TONS 220.00$ $ 5,940.00 $ - $ 5,940.00 15 REMOVE/MODIFY EXISTING HARDSCAPE/LANDSCAPE AND IRRIGATION AS NEEDED (MATCH EXISTING)1 LS 6,000.00$ $ 6,000.00 $ 6,000.00 16 REMOVE AND RECONSTRUCT EXISTING 6" CURB AND GUTTER OVER 12" MINIMUM 95% COMPACTED NATIVE SUBGRADE PER CITY OF FONTANA STD. PLAN NO. 1000. 68.25 LF 50.00$ $ 3,412.50 $ 3,412.50 17 REMOVE AND RECONSTRUCT EXISTING 6" CURB OVER 12" MINIMUM 95% COMPACTED NATIVE SUBGRADE PER CITY OF FONTANA STD. PLAN NO. 1000. 31.9 LF 35.00$ $ 1,116.50 $ 1,116.50 18 CONSTRUCT NEW CURB RAMP OVER 12" MINIMUM 95% COMPACTED NATIVE SUBGRADE PER CITY OF FONTANA STD. NO. 1003. 4 EA 8,000.00$ $ 32,000.00 $ 32,000.00 19 CONSTRUCT NEW CURB RAMP OVER 12" MINIMUM 95% COMPACTED NATIVE SUBGRADE PER CITY OF FONTANA STD. NO. 1003. 1 EA 8,250.00$ $ 8,250.00 $ 8,250.00 20 ADJUST EXISTING WATER METER AND PULLBOX TO GRADE.3 EA 800.00$ $ 2,400.00 $ 2,400.00 21 REMOVE AND REPLACE EXISTING MAILBOX AND POST WITH NEW ONE.1 EA 500.00$ $ 500.00 $ 500.00 22 REMOVE AND RELOCATE EXISTING CMU WALL AND PILASTERS 76 LF 500.00$ $ 38,000.00 $ 38,000.00 23 REMOVE AND RELOCATE EXISTING FACILITY 4 EA 800.00$ $ 3,200.00 $ 3,200.00 24 Temporary Traffic Control 1 LS 12,500.00$ $ 12,500.00 $ 12,500.00 SUBTOTAL=314,054.74$ 235,830.36$ 78,224.38$ 10% CONTINGENCY=31,405.47$ 23,583.04$ 7,822.44$ TOTAL=345,460.21$ 259,413.40$ 86,046.81$ Construction Engineering City Staff 118,336.70$ 118,336.70$ Geotechnical Services 17,273.01$ 17,273.01$ -$ Surveying Services 17,273.01$ 17,273.01$ -$ TOTAL (CE)=152,882.72$ 152,882.72$ -$ TOTAL CONSTRUCTION COSTS=498,342.93$ 412,296.12$ 86,046.81$ PS & E (Design & Environmental) Design City Staff 60,119.04$ 60,119.04$ Design Services 69,092.04$ 69,092.04$ -$ Total Design Cost=129,211.08$ 129,211.08$ -$ Environmental City Staff 6,056.40$ 6,056.40$ Environemental (NOE) Services 50.00$ 50.00$ -$ Total Environmental Cost=6,106.40$ 6,106.40$ -$ Total PS&E Design & Environmental)=135,317.48$ 135,317.48$ -$ Right of Way/ Utility Coord City Staff -$ -$ -$ Pole Relocation -$ -$ -$ Property Acquisiton Costs ($10/SF)-$ -$ -$ Consultant Services (R/W Acquisiton)-$ -$ -$ TOTAL RIGHT OF WAY COSTS=-$ -$ -$ TOTAL PROJECT COST (W/ R/W and Utility Coord)=-$ -$ -$ Right of Way Consultant Services -$ -$ -$ ROW Acquisition Costs -$ -$ -$ Easement Deed Preparation (Legals and Platts)=-$ -$ -$ Total Right of Way Cost=-$ -$ -$ TOTAL PROJECT COST=633,660.41$ 547,613.60$ 86,046.81$ Total Participating Non-Participating =$383,660.41 Request Grant Amount=$250,000.00 Exhibit L. Randall Pepper(O'Day Short) Elementary School Sidewalk Gap Closure Project Budget Estimate Civil - Street Local Match( MA T C H L I N E - S E E M A T C H A - A 0 SCALE 1:10 10 20 N FILBERT ST PE P P E R C T FILBERT ST W/O JUNIPER AVE SIDEWALK PROJECT PRELIMINARY ENGINEERING DRAWING SIGN POST POWER POLE POWER POLE POWER POLE FENCE FIRE HYDRANT FENCE 5 ' 5 ' 6 ' 4 ' 0 SCALE 1:10 10 20 N FILBERT ST SE W E L L C T MA T C H L I N E - S E E M A T C H A - A FILBERT ST W/O JUNIPER AVE SIDEWALK PROJECT PRELIMINARY ENGINEERING DRAWING MAILBOX POWER POLE POWER POLE POWER POLE FIRE HYDRANT WATER VALVE 5 ' 6 ' 5 ' 4 ' 4 ' MA T C H L I N E - S E E B O T T O M R I G H T 0 SCALE 1:10 10 20 N LEMON ST RA N D A L L A V E LEMON ST S/O RANDALL AVE SIDEWALK PROJECT PRELIMINARY ENGINEERING DRAWING MAILBOX WATER VALVE WATER VALVE WATER VALVE MAILBOX MAILBOX SIGN POST 5 ' 4 ' 4 ' 4 ' MA T C H L I N E - S E E T O P L E F T LEMON ST