Loading...
Art3_Fontana_FY21_BikePed_KathyBinksSRTS_AppAttachment A:  Project Location MapCity of Fontana: Kathy Binks Elementary Safe Routes to School (SRTS)Proposed Project Sections:  Sidewalks, Curbs, Gutters, and ADA‐Accessible RampsBaseline Ave (ADT 10,700)Cypress Ave (ADT 3,200)Juniper Ave (ADT 6,300)AB Miller High SchoolKathy BinksElementary SchoolWayne Ruble Middle School Photo 1 – Cypress Avenue sidewalk gap. Attachment B: Project Site Photos City of Fontana: Kathy Binks Elementary Safe Routes to School (SRTS) Cypress Photo 1 Attachment B: Project Site Photos City of Fontana: Kathy Binks Elementary Safe Routes to School (SRTS) Cypress Photos 2-4 Photo 2 – The sidewalk on Cypress abruptly ends just north of Baseline. Photo 3 – Another short segment of paved sidewalk continues north of the gap. Note the motor home blocking through travel and the uneven surface of the first gap segment. Photo 4 – The paved portion ends again abruptly, forcing pedestrians to navigate around trees and bushes to continue north on Cypress. Attachment B: Project Site Photos City of Fontana: Kathy Binks Elementary Safe Routes to School (SRTS) Cypress Photos 5-7 Photo 5 – Landscaping, uneven curbs and parked cars make pedestrian passageway difficult for the majority of the segment on Cypress. Photo 6 – At some points, it is virtually impossible to continue through pedestrian travel, even for those without mobility issues. In addition, during rainy weather, walking on the side of Cypress becomes even more difficult. Photo 7 – At the far north end of the sidewalk gap, pedestrians must either walk in the dirt or on the property owners grass. Attachment B: Project Site Photos City of Fontana: Kathy Binks Elementary Safe Routes to School (SRTS) Cypress Photos 8-10 Photo 8 – The sidewalk begins again, just prior to Albany Way, although utilities provide new obstacles along this final segment. Photo 9 – Continued passage north on Cypress connects students to AB Miller High School and Wayne Ruble Middle School. Photo 10 – Continued passage south on Cypress connects pedestrians to the Omnitrans Route 82 and Kathy Binks Elementary. Attachment B: Project Site Photos City of Fontana: Kathy Binks Elementary Safe Routes to School (SRTS) Juniper Photo 1 Photo 1 – Juniper Avenue sidewalk gap. Attachment B: Project Site Photos City of Fontana: Kathy Binks Elementary Safe Routes to School (SRTS) Juniper Photos 2-4 Photo 2 – Just like on Cypress, the side walk ends abruptly, just north of Baseline Avenue. Photo 3 – During inclement weather, pedestrian passageway is particularly difficult, as unpaved areas become muddy or pooled with water. Photo 10 – The segment is routinely blocked by numerous vehicles, forcing pedestrians into the roadway, which is also a primarily vehicular traffic route for the nearby elementary, middle and high schools. Attachment B: Project Site Photos City of Fontana: Kathy Binks Elementary Safe Routes to School (SRTS) Juniper Photos 5-6 Photo 5 – Where cars are not the obstacle to pedestrian traffic, shrub, curbs and rocks instead impeded access. Photo 6 – The sidewalk begins again just south of San Simeon Way and continues north to connect students to Wayne Ruble Middle school. Attachment C: Safe Routes To School (Binks) Project Locations Attachment C: Safe Routes To School (Miller) Project Locations Attachment C: Safe Routes To School (Ruble) Project Locations nmnm nmnm nm nm nm nm nm nm nm nm nm nm nm nm nm nm nm nm nm nm nm nm nm nm nm nm nm SIERRA AVECITRUS AVECHERRY AVESLOVER AVE JURUPA AVE VALLEY BLVD FOOTHILL BLVD ILL BLVD SANTA ANA AVE BASELINE AVE MERRILL AVEJUNIPER AVERANDALL AVE MANGO AVESAN BERNARDINO AVEETIWANDA AVECEDAR AVEPALMETTO AVEAVEWHITTRAM AVE ALDER AVES HIGHLAND AVE W HIGHLAND AVE L Y T L E CR E E K RDKNOX AVEPOPLAR AVEBANANA AVEALMERIA AVEELM AVELOCUST AVEWALNUT AVE LIVE OAK AVEMERRILL AVE RANDALL AVE WALNUT ST SIERRA LAKES PK Y FOOTHILL BLVD BEECH AVEW BASE LINE RD HEMLOCK AVELIME AVECYPRESS AVEMAPLE AVEMILLER AVE OLEANDER AVEALMOND AVEREDWOOD AVEE JURUPA ST CALABASH AVEARROW BLVD SUMMIT AVE W WALNUT ST TAMARIND AVES ETIWANDA AVEN ETIWANDA AVEDUNCAN CANYON RD LAUREL AVEHIGH L A N D A V E LOCUST AVEETIWANDA AVEBEECH AVEARROW BLVD HEMLOCK AVELINDEN AVELIME AVELIVE OAK AVESUMMIT AVEPOPLAR AVESIERRA AVEMILLER AVE BEECH ELEMK-6 DATE ELEMTK-5 MANGO ELEMK-5 CITRUS ELEMK-6 MAPLE ELEMTK-5 TOKAY ELEMTK-5 LOCUST ELEMK-6 ALMOND ELEMTK-6 POPLAR ELEMTK-6 CYPRESS ELEMK-5 REDWOOD ELEMK-6 PALMETTO ELEMK-5 PRIMROSE ELEMK-5 HEMLOCK ELEMTK-5 CHAPARRAL ELEM OAK PARK ELEMTK-5 LIVE OAK ELEMTK-6 OLEANDER ELEMTK-5 KATHY BINKS ELEMK-5 TED PORTER ELEMTK-5 SIERRA LAKES ELEMK-5 CANYON CREST ELEMK-5 DOROTHY GRANT ELEMK-5 WEST RANDALL ELEMTK-6 RANDALL-PEPPER ELEMK-5 NORTH TAMARIND ELEMK-6 SOUTH TAMARIND ELEMTK-5 DOLORES HUERTA INT. ACADEMYK-6 FONTANAUNIFIED SCHOOL DISTRICT ELEMENTARY ATTENDANCE AREAS Dolores Huerta - no attendance boundary 2019-2020Elementary SchoolAttendance Areas Primrose Cypress Juniper Live Oak Maple North Tamarind Oleander Palmetto Poplar Randall-Pepper Redwood South Tamarind West Randall Locust Tokay Chaparral Shadow Hills Oak Park Dolores Huerta Canyon Crest Hemlock Ted J. Porter Beech Avenue Mango Kathy Binks Citrus ES Dorothy Grant Date Almond Sierra Lakes n ElementarySchools Streets RR Highways 0 0.75 1.5 2.25 30.375 Miles BOUNDARIES APPROVED APRIL 2018 6/6/2019 JM JUNIPER ELEMK-5 §¨¦15 §¨¦10 §¨¦210 SHADOW HILLS ELEMK-5nm K-5 CHERRY AVEAttachment D: Attendance Boundaries (Elementary) Project Locations n n n n n nm nm RUBLE MIDDLE6-8 ALDER MIDDLE6-8 TRUMAN MIDDLE6-8 nFONTANA MIDDLE 6-8 SEQUOIA MIDDLE7-8 ALMERIA MIDDLE6-8 SOUTHRIDGE MIDDLE6-8 SUMMIT HIGH FONTANA HIGH JURUPA HILLS HIGH HENRY J KAISER HIGH SIERRA AVECITRUS AVECHERRY AVESLOVER AVE JURUPA AVE VALLEY BLVD FOOTHILL BLVD SANTA ANA AVE BASELINE AVE MERRILL AVE JUNIPER AVERANDALL AVE MANGO AVESAN BERNARDINO AVE PALMETTO AVELINDEN AVEWHITTRAM AVE L Y T L E CR E E K R D KNOX AVEALDER AVEFONTANA AVEPOPLAR AVEBANANA AVEALMERIA AVEELM AVEMARLAY AVE WALNUT AVE LIVE OAK AVEMERRILL AVE RANDALL AVE SIERRA LAKES PKY FOOTHILL BLVD BEECH AVEHEMLOCK AVELIME AVECYPRESS AVEOLEANDER AVEALMOND AVEREDWOOD AVECALABASH AVEMAPLE AVECEDAR AVEARROW BLVD S LINDEN AVESUMMIT AVE WALNUT ST S LARCH AVETAMARIND AVEPALMETTO AVEDUNCAN CANYON RD FUTURE CYPRESS AVELAUREL AVEVALLEY BLVD HIGHLAND AVE CATAWBA AVETAMARIND AVEMILLER AVE HEMLOCK AVELAUREL AVECALABASH AVEBANANA AVEJUNIPER AVEARROW BLVD CYPRESS AVECYPRESS AVEHIGHLAND AVE CALABASH AVEALMOND AVEBEECH AVEJURUPA AVE LYTLE CREEK RDALDER AVEOLEANDER AVEBASELINE AVE LIME AVES I ERR A A V E ETIWANDA AVELIVE OAK AVELIME AVEHEMLOCK AVEMAPLE AVEBANANA AVEMAPLE AVEELM AVEREDWOOD AVEALMOND AVEREDWOOD AVEMILLER AVEMMIT AVECATAWBA AVEPOPLAR AVELAUREL AVEBEECH AVELIVE OAK AVECATAWBA AVELIVE OAK AVEHEMLOCK AVECALABASH AVELIME AVEBEECH AVETAMARIND AVEMILLER AVE FONTANAUNIFIED SCHOOL DISTRICT HIGH SCHOOL ATTENDANCE AREAS 2019-2020High SchoolAttendance Areas Streets RR Highways 0 0.75 1.5 2.25 30.375 Miles BOUNDARIES APPROVED APRIL 2018 8/28/2018 JM µ High Schoolsn n nm Continuation High Middle Schools Fontana HS U(Henry J.) Kaiser HS Jurupa Hills HS Summit HS 15 210 10 SIERRA AVESIERRA AVECASA GRANDE AVE (Fontana A.B.) Miller HS n n n BIRCH CONT. HS n n MILLER HInnGH CITRUS CONT. HS RUBLE MIDDLE 6-8 Attachment D: Attendance Boundaries (High) Project Locations nmnm nmnm nm nm nm nm nm nm nm nm nm nm nm nm nm nm nm nm nm nm nm nm nm nm nm nm nm nm n n n n n n n DATE ELEMK-5 BEECH ELEMK-6 MAPLE ELEMK-5 TOKAY ELEMK-5 MANGO ELEMK-5 ALMOND ELEMK-6 CITRUS ELEMK-6 POPLAR ELEMK-6 LOCUST ELEMK-6 CYPRESS ELEMK-5 REDWOOD ELEMK-6 HEMLOCK ELEMK-5 JUNIPER ELEMK-5 OAK PARK ELEMK-5 LIVE OAK ELEMK-6 PALMETTO ELEMK-5 OLEANDER ELEMK-5 PRIMROSE ELEMK-5 CHAPARRAL ELEMK-5 TED PORTER ELEMK-5 KATHY BINKS ELEMK-5 SIERRA LAKES ELEMK-5 CANYON CREST ELEMK-5 SHADOW HILLS ELEM K-5 DOROTHY GRANT ELEMK-5 SOUTH TAMARIND ELEMK-5 NORTH TAMARIND ELEMK-6 DOLORES HUERTA INT. ACADEMYK-5 RUBLE MIDDLE6-8 ALDER MIDDLE6-8 TRUMAN MIDDLE6-8 FONTANA MIDDLE6-8 SEQUOIA MIDDLE7-8 ALMERIA MIDDLE6-8 SOUTHRIDGE MIDDLE6-8 SIERRA AVECITRUS AVECHERRY AVESLOVER AVE JURUPA AVE VALLEY BLVD FOOTHILL BLVD SANTA ANA AVE BASELINE AVE MERRILL AVE JUNIPER AVERANDALL AVEMANGO AVESAN BERNARDINO AVE PALMETTO AVE LINDEN AVEWHITTRAM AVE ALDER AVEHIGHLAND AVE L Y T L E CR E E K R D KNOX AVEFONTANA AVEPOPLAR AVEBANANA AVEALMERIA AVEELM AVEMARLAY AVE LOCUST AVEWALNUT AVE LIVE OAK AVEMERRILL AVE RANDALL AVE WALNUT ST SIERRA LAKES PKY FOOTHILL BLVD BEECH AVEHEMLOCK AVELIME AVECYPRESS AVEMILLER AVE OLEANDER AVEALMOND AVEREDWOOD AVECALABASH AVE CEDAR AVEARROW BLVD SUMMIT AVE WALNUT ST LARCH AVE ETIWANDA AVE PALMETTO AVEDUNCAN CANYON RD FUTURE CYPRESS AVELAUREL AVEVALLEY BLVD HIGHLAND AVE CATAWBA AVESIERRA AVEMILLER AVE BEECH AVEJUNIPER AVECATAWBA AVELOCUST AVECYPRESS AVECALABASH AVEBANANA AVELYTLE CREEK RDBANANA AVEHEMLOCK AVEREDWOOD AVEETIWANDA AVECALABASH AVELIVE OAK AVELIME AVEARROW BLVD S I ERR A A V E CHERRY AVEALDER AVEALMOND AVEMILLER AVE POPLAR AVEOLEANDER AVEALMOND AVETAMARIND AVEBEECH AVELIVE OAK AVECATAWBA AVELIME AVEBEECH AVELAUREL AVELINDEN AVESIERRA AVECYPRESS AVEELM AVESUMMIT AVETAMARIND AVEI 15 FWY NFONTANAUNIFIED SCHOOL DISTRICT MIDDLE SCHOOL ATTENDANCE AREAS 2019-2020Middle SchoolAttendance Areas Streets RR Highways 0 0.75 1.5 2.25 30.375 Miles BOUNDARIES APPROVED APRIL 2018 8/28/2018 JM SHADOW HILLS µ n Middle Schools ALDER FONTANA MS SEQUOIA ALMERIA (HARRY S.) TRUMAN (WAYNE) RUBLE SOUTHRIDGE CASA GRANDE RD 10 15 210 Attachment D: Attendance Boundaries (Middle) Project Locations Attachment E: Active San Bernardino “Take a Walk” Map City of Fontana: Kathy Binks Elementary Safe Routes to School (SRTS) Project Location Attachment F: Points of Interest Pedestrian Plan Located near Project Locations Attachment G:  Destinations and Connections MapCity of Fontana: Kathy Binks Elementary Safe Routes to School (SRTS)Baseline AvenueCypress AvenueJuniper AvenueBusiness Center (including Amazon Fulfillment Center)SchoolParksPlace of WorshipOmintrans Bus StopProposed Project Sections½ mile to Downtown, City Hall, PE Bike trail and Metrolink StationMiller AvenueFoothill BoulevardSierra AvenueCitrus Avenue Attachment H: Collision DataSettings:Date Time Location Dist DirType of CollisionMotor Veh. Involved With DOT1 MPC1 DOT2 MPC2Primary Cause # Inj # Killed13-May-13 1526BASELINE AV/ CYPRESS AV685FTNRear EndOther Motor VehicleSouth Stopped South Proceeding straightUnsafe speed for prevailing conditions0005-Mar-17 0107BASELINE AV/ CYPRESS AV67 N Side SwipeParked Motor VehicleNorthOther Unsafe TurningNorth ParkedDrive veh/under infl of alcohol,drug,combo0005-Aug-17 1341BASELINE AV/ CYPRESS AV411 N Side SwipeParked Motor VehicleNorthOther Unsafe TurningNorth ParkedMisd Hit & Run - property damage0003-Oct-17 1456BASELINE AV/ CYPRESS AV260 N Rear EndOther Motor VehicleSouthProceeding straightSouth Proceeding straightUnsafe speed for prevailing conditions0018-Jan-20 45BASELINE AV/ CYPRESS AV700NRear EndParked Motor VehicleSouthProceeding straightSouth Parked 0 0 City of Fontana Department of Engineering Traffic Collision History ReportTotal collisions: 5Cypress Avenue between Albany Way and Baseline AvenueSegment:Date Range Reported:January 1, 2010 to Present Segment Collisions Attachment H: Collision DataSettings:Date Time Location Dist DirType of CollisionMotor Veh. Involved With DOT1 MPC1 DOT2 MPC2Primary Cause # Inj # Killed08-Feb-13 1151BASELINE AV/ JUNIPER AV25 N NorthProceeding straightWest Stopped Stop light 1 002-Mar-19 0142BASELINE AV/ JUNIPER AV475 N Hit Object Fixed Object NorthXing into Opposing TrafficDrive veh/under infl of alcohol,drug,combo00 City of Fontana Department of Engineering Traffic Collision History ReportTotal collisions: 2Juniper Avenue between Athens Lane and Baseline AvenueSegment:Date Range Reported:January 1, 2010 to Present Segment Collisions Attachment I: Omnitrans Bus Route Map City of Fontana: Kathy Binks Elementary Safe Routes to School (SRTS) Project Location:Within ¼ mile of Route 10 and 82 (and previously within ½ mile of Route 67 – suspended a result of reduced ridership during Covid-19 pandemic). Attachment J ‐ Detailed Cost Estimate City of Fontana: Kathy Binks Elementary Safe Routes to School (SRTS) Construction Costs Item Description of Items Est. Qty. Unit Unit Price Bid Amount Participating Costs Non- Participating Costs 1 Mobilization/Demobilization 1 LS 15,000.00$                  $15,000.00 $ 15,000.00 $- 2 WPCP/SWPPP 1 LS 5,000.00$  $5,000.00 $ 5,000.00 $- 3 Clear and Grubbing 1 LS 10,000.00$                  $10,000.00 $ 10,000.00 $- 4 Sawcut and Remove Existing AC  Pavement (Depth Varies)3088 SF 5.50$  $16,984.28 $ 16,984.28 $- 5 Sawcut Remove Existing PCC  (Depth Varies)615 SF 1.25$  $769.13 $769.13 $- 6 Remove Existing Curb and Gutter 79 LF 3.50$  $275.63 $275.63 $- 7 Remove Existing AC Dike 203 LF 3.50$  $709.28 $709.28 $- 8 Tree Removal 8 EA 1,500.00$  $12,600.00 $ 12,600.00 $- 9 Construct 6" PCC Driveway  Approach 1233 SF 24.00$  $29,584.80 $ 29,584.80 $- 10 Construct Curb and Gutter 615 LF 25.00$  $15,382.50 $ 15,382.50 $- 11 Construct 4" PCC Sidewalk 2776 SF 7.00$  $19,433.40 $ 19,433.40 $- 12 Construct 6.5" AC Pavement 121 TON 150.00$  $18,112.50 $- $ 18,112.50 13 Construct 5.5" CMB 81 TON 30.00$  $2,425.50 $- $ 2,425.50 14 Grind Existing AC Pavement 10897 SF 1.25$  $13,621.13 $- $ 13,621.13 15 Overlay Existing AC Pavement  Min. 0.17'135 TON 150.00$  $20,317.50 $- $ 20,317.50 16 Temporary Traffic Control (6%) 1 LS 12,500.00$                  $12,500.00 $ 12,500.00 $- 17 Signing & Striping (7%)1 LS 13,500.00$                  $13,500.00 $- $ 13,500.00 18 Power Pole Relocation 1 EA 10,000.00$                  $10,000.00 $ 10,000.00 $- 19 Relocate Existing Mailbox 1 EA 500.00$  $500.00 $500.00 $- SUBTOTAL=216,715.63$ 148,739.00$               67,976.63$                  10% CONTINGENCY=21,671.56$ 14,873.90$                 6,797.66$  TOTAL=238,387.19$ 163,612.90$               74,774.29$                  Construction Engineering City Staff 173,312.00$ 102,500.00$               70,812.00$                  Geotechnical Services 11,919.36$ 11,919.36$                 ‐$  Surveying Services 16,687.10$ 16,687.10$                 ‐$  TOTAL (CE)=201,918.46$ 131,106.46$               70,812.00$                  TOTAL CONSTRUCTION COSTS=440,305.65$ 294,719.36$               145,586.29$                PS & E (Design & Environmental) Design City Staff 76,560.00$ ‐$ 76,560.00$                  Design Services 35,758.08$ 35,758.08$                 ‐$  Total Design Cost=112,318.08$ 35,758.08$                 76,560.00$                  Environmental City Staff 4,060.00$ ‐$ 4,060.00$  Environemental (NOE) Services 50.00$ 50.00$ ‐$  Total Environmental Cost=4,110.00$ 50.00$ 4,060.00$  TOTAL PS&E & ENVIRONMENTAL COSTS=116,428.08$ 35,808.08$                 80,620.00$                  Right of Way Consultant Services 25,000.00$ 25,000.00$                 ‐$  ROW Acquisition Costs 19,280.00$ 19,280.00$                 ‐$  Easement Deed Preparation (Legals and Platts)=7,500.00$ 7,500.00$ ‐$  TOTAL ROW COSTS = 51,780.00$ 51,780.00$                 ‐$  TOTAL PROJECT COST=608,513.73$ 382,307.44$               226,206.29$                pg pg Requested Grant Amount 160,000.00$  Match (Participating Costs Only) =222,307.44$  TOTAL COST (Participating Costs Only)382,307.44$  Percent Match 58.15% Cypress N/O Baseline; Juniper N/O Baseline (TOTAL) 3122356671088888999999911111112105555105511111414141255Attachment K: Preliminary Engineering Plans 3122356671088888999999911111112105555105511111414141255 2443567108888913131212 2443567108888913131212