Loading...
Art3_Redlands_FY17_BikePed_EValleyInterconnect_App Transportation Development Act Article 3 Phase 1 Call for Projects For Active Transportation Program Local Match Assistance Please use this MS Word file as your response to the Call-for-Projects Responsible Parties Project Name East Valley Corridor Bike Route Interconnect Project Applicant (Agency name) City of Redlands Applicant Contact (Name, title, email, phone # of individual authorizing the application) Chris Diggs, Director, Municipal Utilities and Engineering, cdiggs@cityofredlands.org, (909) 798-7658 Partner Name(s) (if applicable) City of San Bernardino, San Bernardino Coutny Project Type Bicycle (Bicycle projects must be consistent with San Bernardino County NMTP) Pedestrian Bicycle/Pedestrian Safe Routes to School Recreational Trail Overview and Description of the Project (0-30 points) Provide basic information regarding the nature and location of the project, prior project development activities, if any, current status, and overall scope of the proposed effort. Additional background information, photos, etc. may be attached, but are not required. Summary The City of Redlands, in conjunction with the City of San Bernardino and the County of San Bernardino, seeks to improve connectivity between cycling routes in the northwest part of the City of Redlands and the County Donut Hole. At present, Redlands has more than 28 miles of existing bicycle routes and another 9 miles of funded lanes yet to be installed. However, these routes, while each serving an important need in a specific community, are not connected together in a comprehensive network. Cyclists are required to navigate unmarked road sections while crossing from one trail segment to another within the system. These gaps discourage wider use of the system and increase confusion among riders. The City’s substantial investments in cycling routes over the last few years have developed many individual pieces of the network and the City is now well positioned to take advantage of a unique opportunity to improve system connectivity presented by the upcoming Phase IV extension of the Santa Ana River Trail (SART). Building on the SART alignment between California and Opal through North Redlands, this proposed ATP Cycle 3 project leverages a few short segments of new cycling lanes to connect together three major regional trails, the Orange Blossom Trail (OBT), the SART, and three sections of the East Valley Corridor multipurpose trail system. Additionally, the project extends the Redlands bicycle network north to the City limits of Highland, interconnecting the growing Highland network (including a proposed ATP Cycle 3 project within Highland) and providing Highland and San Bernardino residents with safer connectivity across the Santa Ana River to SART. Finally, the project connects to the disadvantaged community in the City of San Bernardino, west of Mountain View between the freeway and the River. This connection provides residents in that community with access not only to the SART and East Valley Corridor trails but also to growing employment opportunities in the warehouse district along San Bernardino Avenue and to destinations in the Citrus Plaza and Mountain Grove shopping centers for recreation and employment. In addition to linking several major trails and cycling networks, our proposed lanes improve systemic access to a range of destinations and amenities including: • A possible future Redlands Rail station on Mountain View • Packinghouse Christian Academy (San Bernardino and Alabama) • Citrus Plaza and Mountain Grove centers • Kaiser Permanente facility on California • Citrus Valley High School (via proposed SART alignment) • Lugonia High-Density Residential Community (just west of Alabama) • Employment opportunities with: o Clorox o Kimberly Clark o Amazon o Payless ShoeSource o Kaiser Permanente o Home Depot o Ashley Furniture o Southern California Edison o Lamps Plus o BMW o And many more Proposed Facilities Specifically our proposed project is comprised of the following segments: • Class I/IV bikeway o Along the West side of Alabama, north from the SART to a future signal in front of Robertson’s Ready Mix plant near the Redlands/Highland city limits  Signal and short section of road improvements to be installed by property owner and will provide connectivity between Class I across the River and Class II into Highland • Class II bike lane striping o Along San Bernardino Ave from Mountain View east to Alabama o Along Alabama from Lugonia north to Pioneer (connection with SART at the Pioneer/Alabama signal crossing) o Along east side of Alabama from signal at Robertson’s Ready Mix (CUP requirement) north to Highland city limits (west side lane north from the signal runs through City of San Bernardino right of way and will be installed as part of a separate City of Highland project) • Class III sharrows on north end of California Street connecting SART to existing East Valley Corridor multipurpose trail • Midblock crossing and warning beacon for interconnectivity between San Bernardino Class II facilities and existing Multipurpose trail (running north from San Bernardino Avenue between California Street and Mountain View Avenue) In addition to the actual lane and bikeway installations, the project will install the following safety and usability features: • Green paint on all conflict zones • Way-finding signage • No-parking signage (as appropriate per planning guidelines) • Bike lane signs and markings • Bicycle detection loops at signals Safety Improvements Currently, both Alabama Street and San Bernardino Avenue lack cycling facilities entirely. Both streets are subject to heavy traffic, including cement trucks from the mining operations in the riverbed and cargo trucks operating out of the warehouse district along San Bernardino Avenue. For cyclists seeking access to amenities along either route, connectivity between Highland and Redlands, or access to the SART from any of the surrounding communities, the challenges of riding in this area are substantial. Over the last ten years, there have been eight recorded bicycle accidents and one pedestrian collision along our proposed routes. Interagency Collaboration This project is the result of collaboration between several agencies including Redlands, San Bernardino City, San Bernardino County and Highland all of whom share a substantial interest in the facilities proposed. Due to practicality considerations, Highland will be pursuing a complimentary project which connects where this project ends on Alabama Street at the city limits between Redlands and Highland, thereby completing connectivity between the two city cycling networks. A letter of support from Highland demonstrates their commitment to implementing this project as well as their own. Consistency with Local and Regional Planning All of the facilities proposed by this project are consistent with, and prioritized in the Redlands Bicycle Master Plan, as well as the County’s Nonmotorized Transportation Plan and the East Valley Corridor Plan Specific Plan. Project Funding ATP funds to be requested in Cycle 3 (80% of total project cost) $2,112,105 Requested matching funds from TDA Article 3 (16% of total project cost) $422,421 20% Local Match (4% of total project cost – please also identify the source of those funds) $105,605.25 Total project funds $2,640,131 Narrative Question RESPOND TO THE DRAFT ATP CRITERIA BY DESCRIBING BRIEFLY THE BENEFITS OF THE PROPOSED PROJECT RELATED TO INCREASING ACTIVE TRANSPORTATION MODE SHARE, SAFETY, PUBLIC PARTICIPATION, COST EFFECTIVENESS, AND PUBLIC HEALTH. (PLEASE NOTE THE QUESTIONS IN THE ATP CYCLE 3 APPLICATION FOR DESCRIPTION/EXPLANATION OF EACH CRITERION – BULLET POINTS MAY BE USED TO ANSWER THE QUESTIONS – ADDITIONAL MATERIAL MAY BE ATTACHED, BUT IS NOT REQUIRED) (0-20 POINTS) 1. Describe how your project will encourage increased bicycling and walking and generally improve the ease of travel for non-motorized users A. The entirety of the proposed project is situated within a disadvantaged community (DAC) and serves two other DACs immediately adjacent to project routes: a. City of San Bernardino section west of Mountain View between I10 and River b. City of Highland section east of Palm and north of the River B. Identification of disadvantaged community based on median income at the census tract level. C. The project is a direct benefit to a DAC because it is situated in, and provides connectivity between, multiple DACs and routes or surrounding amenities. a. This project connects several regional trails and bike route networks and provides DAC residents with system access. b. Members of identified DACs have easy direct access to proposed improvements which run directly through or adjacent to affected communities. c. The Redlands Bicycle Master Plan, County Nonmotorized Transportation Plan, and East Valley Corridor specific plan were all developed with extensive community input. Proposed project routes are listed and prioritized in these plans. d. 100% of this project is situated in a DAC and two other DACs are immediately adjacent to project facilities. 2. Describe how the project creates or improves walking and/or bicycling routes and connectivity to destinations, and how it removes barriers to walking and/or bicycling. A. This project addresses three needs: a. Limited DAC access to cycling network and associated amenities or destinations b. Gaps in the existing networks which discouraging mode shift c. Route safety B. The project achieves these goals by: a. Situating project facilities within and adjacent to DAC locations and connecting those communities to various destinations along newly interconnected routes b. Connecting existing and funded regional routes (such as Orange Blossom Trail and SART) with Highland, Redlands and County cycling networks c. Improves visibility of cyclists along Alabama and San Bernardino and provides protected Class I across Santa Ana River C. This project is a priority for all participating agencies. It has been identified as a level one priority in the Redlands Bike Master plan and is identified, by incorporation, in the County’s Nonmotorized transportation plan. 3. Describe how the project reduces the number and/or rate of pedestrian and bicycle fatalities and injuries. A. There have been nine bicycle or pedestrian accidents along project routes in the last 10 years of data. As traffic and population increase, especially along the rapidly developing warehouse districts and in the shopping plazas, the rate of accidents could increase without route improvements. B. Safety countermeasures a. Hazards along proposed routes include: i. Heavy truck traffic (including mining and cement trucks) ii. Increasing shopping traffic iii. Increased cycling and vehicular traffic to newly situated housing community iv. Two school sites with children arriving on bikes via unmarked roadways v. A medical facility reachable by bike but lacking cycling facilities vi. DAC members who may cycle to work but lack appropriate cycling routes b. This project provides highly visible Class II bicycling facilities, improved intersection safety for cyclists, improved access to sections of protected cycling facilities (Class I), and a new Class I route across the River, all of which improve safety along proposed routes. In addition, the increased connectivity of the network allows cyclists to plan longer in-network trips reaching a much larger list of destinations thereby encouraging cycling mode shift. 4. Describe the community-based public participation process that culminated in the project proposal. A. Redlands bike master plan incorporates significant public participation including input regarding the methodology for prioritizing projects. B. All affected community members had broad opportunity to participate in project planning through the bike master plan process. C. Feedback was solicited in person (workshops and town hall meetings) and through an online website on multiple well-publicized occasions. D. Stakeholders continue to have influence over implementation through the City Council process informed by regular public updates and through ongoing access to information from city staff. 5. Describe the health issues in the project area and how the project will address each of them. Provide local health data and sources, and collaborative efforts with health agencies where possible. A. County level data shows a poor overall health ranking (47 of 58). Specifically, this community faces high levels of adult obesity (climbing) and poor access to physical activity when compared against state and national trends. B. By increasing the usability of associated cycling networks, we increase the potential for mode shift to cycling as a transportation alternative. That mode shift has a direct positive impact on obesity by improving opportunities for physical activity. 6. Explain why the project is considered to have the highest Benefit to Cost Ration (B/C) with respect to the ATP purpose and goals of “increased use of active modes of transportation”. Our project requires only a few short sections of new construction in order to interconnect a total of five different cycling networks and trails. By leveraging existing routes, this project dramatically increases system wide usability at minimal cost. As a result, our benefit to cost ratio is exceptionally good in terms of improving active transportation choices in affected communities. Project Programming Request Form Please fill out the first page of the Caltrans Project Programming Request Form (PPR) with as much available project information as possible. Please document the timeline for completed phases as well as for ongoing and proposed phases. Basic information on the description of the project, location, and scope of work should be provided in the Word file, not the PPR. The PPR has been provided as a separate Excel file. Attached separately. DTP-0001 (Revised July 2013) End Closeout Phase (Closeout Report) End Environmental Phase (PA&ED Milestone) Begin Design (PS&E) Phase End Design Phase (Ready to List for Advertisement Milestone) Begin Right of Way Phase Right of Way SCAG Project Title Project ID End Right of Way Phase (Right of Way Certification Milestone) Begin Construction Phase (Contract Award Milestone) PS&E Construction Kjeld Lindsted PPNO County Project Sponsor/Lead Agency City of Redlands EA PM Bk PM Ahd 08 Local Project Manager/Contact SB Local Assistance Draft Project Report Route/Corridor 10/01/19 ProposedProject Milestone District PA&ED 07/01/20 06/30/22 06/30/20 Implementing Agency City of Redlands City of Redlands City of Redlands Begin Environmental (PA&ED) Phase Participating agencies each have growing cycling networks but gaps limit opportunities to use the various parts as a cohesive system which discourages use. As a result, many communities cannot currently rely on existing cycling routes to reach key regional destinations such as schools, medical facilities, places of employment, or recreation trails. For disadvantaged communities who may rely on cycling routes for access to employment and amenities, these gaps can be especially challenging. STATE OF CALIFORNIA ● DEPARTMENT OF TRANSPORTATION PROJECT PROGRAMMING REQUEST Date:4/7/16 General Instructions Proposed Class II bike routes along San Bernardino Avenue and Alabama Street in Redlands and County territory and Class I route across Santa Ana River to Highland. Project connects SART Phase IV, OBT, and East Valley Corridor Trails to Redlands and Highland cycling networks. Leveraging existing routes, project eliminates gaps and adds key destinations to the network thereby offering a cost effective way to maximize active transportation options for surrounding communities many of which are disadvantaged. See attached map for proposed route details. MPO Location, Project Limits, Description, Scope of Work See page 2 East Valley Corridor Bike Route Interconnect Project MPO ID TCRP No. For individuals with sensory disabilities, this document is available in alternate formats. For information call (916) 654-6410 or TDD (916) 654-3880 or write Records and Forms Management, 1120 N Street, MS-89, Sacramento, CA 95814. 02/01/21 07/01/21 01/01/22 01/01/21 E-mail Address Project Study Report Approved Component Phone 909-798-7527 x. 8 Includes Bike/Ped ImprovementsIncludes ADA Improvements Element klindsted@cityofredlands.org Supports Sustainable Communities Strategy (SCS) Goals Reduces Greenhouse Gas Emissions City of Redlands Purpose and Need See page 2 Project Benefits See page 2 By linking major regional cycling trails and networks, this project provides improved system-wide connectivity thereby reducing risk of accident, increasing opportunities for active transpiration mode shift, and encouraging broader use of existing cycling routes for communities across the sub region. This is especially true for disadvantaged communities within project catchment areas. End Construction Phase (Construction Contract Acceptance Milestone) Document TypeCirculate Draft Environmental Document ADA Notice 08/01/22 09/30/22 Begin Closeout Phase New Project 2 of 4 DTP-0001 (Revised July 2013)Date:4/7/16 District EA 08 Project Title: Component Prior 14/15 15/16 16/17 17/18 18/19 19/20+Total E&P (PA&ED) PS&E R/W SUP (CT) CON SUP (CT) R/W CON TOTAL Fund No. 1: Component Prior 14/15 15/16 16/17 17/18 18/19 19/20+Total E&P (PA&ED) PS&E R/W SUP (CT) CON SUP (CT) R/W CON TOTAL Fund No. 2: Component Prior 14/15 15/16 16/17 17/18 18/19 19/20+Total E&P (PA&ED) PS&E R/W SUP (CT) CON SUP (CT) R/W CON TOTAL Fund No. 3: Component Prior 14/15 15/16 16/17 17/18 18/19 19/20+Total E&P (PA&ED) PS&E R/W SUP (CT) CON SUP (CT) R/W CON TOTAL STATE OF CALIFORNIA ● DEPARTMENT OF TRANSPORTATION Route TCRP No. PROJECT PROGRAMMING REQUEST County Project ID PPNO East Valley Corridor Bike Route Interconnect Project LocalSB Program Code Proposed Funding ($1,000s) Proposed Total Project Cost ($1,000s)Notes Funding Agency Program Code Proposed Funding ($1,000s) Funding Agency Funding Agency Program Code Proposed Funding ($1,000s) 3 of 4 DTP-0001 (Revised July 2013)Date:4/7/16 District EA 08 Project Title: STATE OF CALIFORNIA ● DEPARTMENT OF TRANSPORTATION Route TCRP No. PROJECT PROGRAMMING REQUEST County Project ID PPNO East Valley Corridor Bike Route Interconnect Project LocalSB Fund No. 4: Component Prior 14/15 15/16 16/17 17/18 18/19 19/20+Total E&P (PA&ED) PS&E R/W SUP (CT) CON SUP (CT) R/W CON TOTAL Fund No. 5: Component Prior 14/15 15/16 16/17 17/18 18/19 19/20+Total E&P (PA&ED) PS&E R/W SUP (CT) CON SUP (CT) R/W CON TOTAL Fund No. 6: Component Prior 14/15 15/16 16/17 17/18 18/19 19/20+Total E&P (PA&ED) PS&E R/W SUP (CT) CON SUP (CT) R/W CON TOTAL Fund No. 7: Component Prior 14/15 15/16 16/17 17/18 18/19 19/20+Total E&P (PA&ED) PS&E R/W SUP (CT) CON SUP (CT) R/W CON TOTAL Program Code Program Code Proposed Funding ($1,000s) Proposed Funding ($1,000s) Funding Agency Proposed Funding ($1,000s) Funding Agency Funding Agency Program Code Funding Agency Program Code Proposed Funding ($1,000s) 4 of 4 DTP-0001 (Revised July 2013)Date:4/7/16 District EA 08 Project Title: STATE OF CALIFORNIA ● DEPARTMENT OF TRANSPORTATION Route TCRP No. PROJECT PROGRAMMING REQUEST County Project ID PPNO East Valley Corridor Bike Route Interconnect Project LocalSB Fund No. 8: Component Prior 14/15 15/16 16/17 17/18 18/19 19/20+Total E&P (PA&ED) PS&E R/W SUP (CT) CON SUP (CT) R/W CON TOTAL Fund No. 9: Component Prior 14/15 15/16 16/17 17/18 18/19 19/20+Total E&P (PA&ED) PS&E R/W SUP (CT) CON SUP (CT) R/W CON TOTAL Fund No. 10: Component Prior 14/15 15/16 16/17 17/18 18/19 19/20+Total E&P (PA&ED) PS&E R/W SUP (CT) CON SUP (CT) R/W CON TOTAL Program Code Proposed Funding ($1,000s) Funding Agency Program Code Proposed Funding ($1,000s) Funding Agency Funding Agency Program Code Proposed Funding ($1,000s) TDA ARTICLE 3 SAN BERNARDINO AVENUE ITEM #ITEM UNIT UNIT PRICE QTY TOTAL QTY TOTAL 1 Mobilization LS 5,000.00$ 1 5,000.00$ 1 5,000.00$ 2 Traffic Control LS 5,000.00$ 1 5,000.00$ 1 5,000.00$ 3 Thermoplastic Bike Lane Striping LF 1.50$ 19300 28,950.00$ 16200 24,300.00$ 4 Thermoplastic Bike Buffer Hatch LF 1.50$ 4200 6,300.00$ 1700 2,550.00$ 5 Green Bike Lane Entry Marking EA 2,000.00$ 5 10,000.00$ 6 12,000.00$ 6 Green Conflict Zone Marking SF 10.00$ 3000 30,000.00$ 3700 37,000.00$ 7 Bike Lane Sign EA 300.00$ 5 1,500.00$ 7 2,100.00$ 8 Wayfinding Sign EA 500.00$ 4 2,000.00$ 5 2,500.00$ 9 Remove Existing Striping SF 0.50$ 1600 800.00$ 16000 8,000.00$ 10 Type 2 REAS Slurry Seal SF 0.50$ 1600 800.00$ 35000 17,500.00$ 11 1.5" Grind and Overlay SF 2.00$ 0 -$ 13000 26,000.00$ 12 Traffic Control Signs EA 500.00$ 3 1,500.00$ 10 5,000.00$ 13 Bike Detection Loops & Pavement Marking EA 2,000.00$ 4 8,000.00$ 3 6,000.00$ 14 Bike Box EA 12,000.00$ 0 -$ 1 12,000.00$ 15 Miscellaneous Pavement Marking EA 300.00$ 3 900.00$ 12 3,600.00$ 16 Miscellaneous Pavement Striping LF 1.50$ 0 -$ 1900 2,850.00$ 17 RRFB System & Crosswalk EA 100,000.00$ 1 100,000.00$ 0 -$ SUB-TOTAL 200,750.00$ SUB-TOTAL 171,400.00$ 372,150.00$ 37,215.00$ 409,365.00$ -$ -$ -$ 81,873.00$ 61,404.75$ 552,642.75$ PROJECT TOTAL CE (15%) MOUNTAIN VIEW TO CALIFONIA (REDLANDS) CALIFORNIA TO ALABAMA (SB COUNTY) CONSTRUCTION SUB-TOTAL 10% CONTINGENCY PS&E (20%) CONSTRUCTION TOTAL ENVIRONMENTAL R/W ACQUISITION PERMITS TDA ARTICLE 3 ALABAMA STREET - LUGONIA TO PIONEER ITEM #ITEM UNIT UNIT PRICE QTY TOTAL 1 Mobilization LS 5,000.00$ 1 5,000.00$ 2 Traffic Control LS 5,000.00$ 1 5,000.00$ 3 Thermoplastic Bike Lane Striping LF 1.50$ 6400 9,600.00$ 4 Green Bike Lane Entry Marking EA 2,000.00$ 9 18,000.00$ 5 Green Conflict Zone Marking SF 10.00$ 3600 36,000.00$ 6 Bike Lane Sign EA 300.00$ 14 4,200.00$ 7 Wayfinding Sign EA 500.00$ 6 3,000.00$ 8 Remove Existing Striping SF 0.50$ 13000 6,500.00$ 9 Type 2 REAS Slurry Seal SF 0.50$ 13000 6,500.00$ 10 Traffic Control Signs EA 500.00$ 3 1,500.00$ 11 Bike Detection Loops & Pavement Marking EA 2,000.00$ 7 14,000.00$ 12 Bike Box EA 12,000.00$ 1 12,000.00$ 13 Miscellaneous Pavement Marking EA 300.00$ 6 1,800.00$ SUB-TOTAL 123,100.00$ 123,100.00$ 12,310.00$ 135,410.00$ -$ -$ -$ 27,082.00$ 20,311.50$ 182,803.50$ LUGONIA TO PIONEER (SB COUNTY) PERMITS PS&E (20%) CE (15%) PROJECT TOTAL CONSTRUCTION SUB-TOTAL 10% CONTINGENCY CONSTRUCTION TOTAL ENVIRONMENTAL R/W ACQUISITION TDA ARTICLE 3 ALABAMA STREET - SANTA ANA RIVER ITEM #ITEM UNIT UNIT PRICE QTY TOTAL QTY TOTAL 1 Mobilization LS 50,000.00$ 1 50,000.00$ 0 -$ 2 SWPPP LS 10,000.00$ 1 10,000.00$ 0 -$ 3 Traffic Control LS 15,000.00$ 1 15,000.00$ 0 -$ 4 Clearing and Grubbing SF 0.10$ 98400 9,840.00$ 21600 2,160.00$ 5 Thermoplastic Bike Lane Striping LF 1.50$ 9000 13,500.00$ 3000 4,500.00$ 6 Grading SF 0.50$ 98400 49,200.00$ 21600 10,800.00$ 7 Scarify 16' Wide & Compact 12" Deep CY 15.00$ 2500 37,500.00$ 500 7,500.00$ 8 Earthwork Import CY 20.00$ 5500 110,000.00$ 1200 24,000.00$ 9 4" AC for Bike Path TON 100.00$ 1000 100,000.00$ 200 20,000.00$ 10 6" Base for Bike Path CY 80.00$ 700 56,000.00$ 160 12,800.00$ 11 Remove Existing Striping SF 0.50$ 45000 22,500.00$ 0 -$ 12 Type 2 REAS Slurry Seal SF 0.50$ 45000 22,500.00$ 0 -$ 13 Slope Stabilization SF 3.00$ 13000 39,000.00$ 3000 9,000.00$ 14 Wayfinding Sign EA 500.00$ 8 4,000.00$ 0 -$ 15 Traffic Control Signs EA 300.00$ 4 1,200.00$ 0 -$ 16 Solar Powered LED Lights EA 5,500.00$ 32 176,000.00$ 8 44,000.00$ 17 Vinyl Fence LF 30.00$ 3250 97,500.00$ 750 22,500.00$ 18 K-Rail Barrier Along Bridge for Class 4 LF 100.00$ 500 50,000.00$ 0 -$ 19 Guardrail Improvements LS 40,000.00$ 1 40,000.00$ 0 -$ 20 Modify Drainage Outlet EA 10,000.00$ 6 60,000.00$ 0 -$ SUB-TOTAL 963,740.00$ SUB-TOTAL 157,260.00$ 1,121,000.00$ 112,100.00$ 1,233,100.00$ 75,000.00$ 150,000.00$ 15,000.00$ 246,620.00$ 184,965.00$ 1,904,685.00$ SANTA ANA RIVER (CITY OF SAN BERNARDINO)SANTA ANA RIVER (REDLANDS) CONSTRUCTION SUB-TOTAL 10% CONTINGENCY CONSTRUCTION TOTAL ENVIRONMENTAL R/W ACQUISITION PERMITS PS&E (20%) CE (15%) PROJECT TOTAL TDA ARTICLE 3 SUMMARY OF COSTS SEGMENT ENV.R/W PERMITS PS&E CE CON TOTAL SAN BERNARDINO AVENUE -$ -$ -$ 81,873.00$ 61,404.75$ 409,365.00$ 552,642.75$ ALABAMA STREET - LUGONIA TO PIONEER -$ -$ -$ 27,082.00$ 20,311.50$ 135,410.00$ 182,803.50$ ALABAMA STREET - SANTA ANA RIVER TO CITY LIMIT 75,000.00$ 150,000.00$ 15,000.00$ 246,620.00$ 184,965.00$ 1,233,100.00$ 1,904,685.00$ TOTAL COST 75,000.00$ 150,000.00$ 15,000.00$ 355,575.00$ 266,681.25$ 1,777,875.00$ 2,640,131.25$ TYPE ENV.R/W PERMITS PS&E CE CON TOTAL ATP FUNDS (80%)60,000.00$ 120,000.00$ 12,000.00$ 284,460.00$ 213,345.00$ 1,422,300.00$ 2,112,105.00$ TDA ARTICLE 3 FUNDS (16%)12,000.00$ 24,000.00$ 2,400.00$ 56,892.00$ 42,669.00$ 284,460.00$ 422,421.00$ LOCAL FUNDS (4%)3,000.00$ 6,000.00$ 600.00$ 14,223.00$ 10,667.25$ 71,115.00$ 105,605.25$ TOTAL COST 75,000.00$ 150,000.00$ 15,000.00$ 355,575.00$ 266,681.25$ 1,777,875.00$ 2,640,131.25$ TYPE ENV.R/W PERMITS PS&E CE CON TOTAL CITY OF REDLANDS 3,000.00$ -$ 600.00$ 10,247.51$ 7,685.63$ 51,237.56$ 72,770.71$ COUNTY OF SAN BERNARDINO -$ -$ -$ 2,591.60$ 1,943.70$ 12,958.00$ 17,493.30$ CITY OF SAN BERNARDINO -$ 6,000.00$ -$ 1,383.89$ 1,037.92$ 6,919.44$ 15,341.24$ TOTAL COST 3,000.00$ 6,000.00$ 600.00$ 14,223.00$ 10,667.25$ 71,115.00$ 105,605.25$ PROJECT COSTS FUNDING BREAKDOWN LOCAL FUND SPLITS kj kj kj kj §¨10 §¨2 1 0 Proposed Mt. View Rail Station Kaiser Permanente Circa 2020 Apartments Packinghouse Christian Academy Mountain Grove Shopping Center Citrus Plaza Shopping Center Citrus Valley High School I-10 Freeway Alabama StSan Bernardino Ave Mountain View AveLugonia Ave I-210 FreewayOrange StEast Valley CorridorBike RouteInterconnect Project Existing Cla ss 1Bike Path Prop osed Sa nta AnaRiver Trail Prop osed C lass 1Bike Path Prop osed C lass 2Bike Lane Prop osed C lass 3Bike Route kj Route Co nnections Facilities City Limits 1/4 MileBike Catchment 1 M ileBike Catchment 0 1,000 2,000 3,000Feet Scale This map was produced by the City of Redlands,Geographic Information System. The City of Redlands assumes no warranty or legal responsibility for the information contained on this map. The data used to generate this map is dynamicin nature, therefore the information shown may or may not be the most current. April 6, 2016 wo1416ATP_Grant.mxd . CITY OF SAN BERNARDINO CITY OF REDLAND S COUNTY OF SAN BERN ARDIN O CITY OF HIGHLAND CITY OF REDLAND S DP03 SELECTED ECONOMIC CHARACTERISTICS 2010-2014 American Community Survey 5-Year Estimates Thematic Map of Estimate; INCOME AND BENEFITS (IN 2014 INFLATION-ADJUSTED DOLLARS) - Total households - Median household income (dollars) Geography by: Census Tract Supporting documentation on code lists, subject definitions, data accuracy, and statistical testing can be found on the American Community Survey website in the Data and Documentation section. Sample size and data quality measures (including coverage rates, allocation rates, and response rates) can be found on the American Community Survey website in the Methodology section. Although the American Community Survey (ACS) produces population, demographic and housing unit estimates, it is the Census Bureau's Population Estimates Program that produces and disseminates the official estimates of the population for the nation, states, counties, cities and towns and estimates of housing units for states and counties. Legend: Data Classes Persons 37,404 - 37,404 46,818 - 47,343 Boundaries Data are based on a sample and are subject to sampling variability. The degree of uncertainty for an estimate arising from sampling variability is represented through the use of a margin of error. The value shown here is the 90 percent margin of error. The margin of error can be interpreted roughly as providing a 90 percent probability that the interval defined by the estimate minus the margin of error and the estimate plus the margin of error (the lower and upper confidence bounds) contains the true value. In addition to sampling variability, the ACS estimates are subject to nonsampling error (for a discussion of nonsampling variability, see Accuracy of the Data). The effect of nonsampling error is not represented in these tables. Workers include members of the Armed Forces and civilians who were at work last week. Occupation codes are 4-digit codes and are based on Standard Occupational Classification 2010. Industry codes are 4-digit codes and are based on the North American Industry Classification System (NAICS). The Census industry codes for 2013 and later years are based on the 2012 revision of the NAICS. To allow for the creation of 2010-2014 tables, industry data in the multiyear files (2010- 2014) were recoded to 2013 Census industry codes. We recommend using caution when comparing data coded using 2013 Census industry codes with data coded using Census industry codes prior to 2013. For more information on the Census industry code changes, please visit our website at http://www.census.gov/people/io/methodology/. Logical coverage edits applying a rules-based assignment of Medicaid, Medicare and military health coverage were added as of 2009 -- please see http://www.census.gov/hhes/www/hlthins/publications/coverage_edits_final.pdf for more details. The corresponding 2008 data table in American FactFinder does not incorporate these edits and is therefore not comparable to this table in 2009, 2010, 2011, or 2012. Select geographies of 2008 data comparable to the 2009, 2010, 2011, and 2012 tables are accessible at http://www.census.gov/hhes/www/hlthins/data/acs/2008/re-run.html. The health insurance coverage category names were modified in 2010. See ACS Health Insurance Definitions for a list of the insurance type definitions. While the 2010-2014 American Community Survey (ACS) data generally reflect the February 2013 Office of Management and Budget (OMB) definitions of metropolitan and micropolitan statistical areas; in certain instances the names, codes, and boundaries of the 1 of 2 04/01/2016 principal cities shown in ACS tables may differ from the OMB definitions due to differences in the effective dates of the geographic entities. Estimates of urban and rural population, housing units, and characteristics reflect boundaries of urban areas defined based on Census 2010 data. As a result, data for urban and rural areas from the ACS do not necessarily reflect the results of ongoing urbanization. Source: U.S. Census Bureau, 2010-2014 American Community Survey 5-Year Estimates Explanation of Symbols: 1. An '**' entry in the margin of error column indicates that either no sample observations or too few sample observations were available to compute a standard error and thus the margin of error. A statistical test is not appropriate. 2. An '-' entry in the estimate column indicates that either no sample observations or too few sample observations were available to compute an estimate, or a ratio of medians cannot be calculated because one or both of the median estimates falls in the lowest interval or upper interval of an open-ended distribution. 3. An '-' following a median estimate means the median falls in the lowest interval of an open-ended distribution. 4. An '+' following a median estimate means the median falls in the upper interval of an open-ended distribution. 5. An '***' entry in the margin of error column indicates that the median falls in the lowest interval or upper interval of an open-ended distribution. A statistical test is not appropriate. 6. An '*****' entry in the margin of error column indicates that the estimate is controlled. A statistical test for sampling variability is not appropriate. 7. An 'N' entry in the estimate and margin of error columns indicates that data for this geographic area cannot be displayed because the number of sample cases is too small. 8. An '(X)' means that the estimate is not applicable or not available. CITY OF REDLANDS CITY OF REDLANDS CONCEPTUAL PLANS FOR APRIL 2016 CITY OF REDLANDSGRAPHIC SCALE CITY OF REDLANDSGRAPHIC SCALE CITY OF REDLANDSGRAPHIC SCALE CITY OF REDLANDSGRAPHIC SCALE CITY OF REDLANDSGRAPHIC SCALE CITY OF REDLANDSGRAPHIC SCALE CITY OF REDLANDSGRAPHIC SCALE CITY OF REDLANDSGRAPHIC SCALE CITY OF REDLANDS ALABAMASTW SAN BERNARDINO AVE NNEVADAST3R D S T W LUGONIA AVEALABAMA STTEXAS STLUGO NIA AVE 3RD BLVD W PIONEER AVE W SAN BERNARDINO AVEMARIGOLD AVEPALMETTO AVE W LUGONIA AVE 3RD BLVD 100T HBLVDW 210 FRWYE210FRWYYBLVDZ BLVD X BLVD W BLVD E CURT IS LN OHIOSTWEBSTERSTELISE DR U BLVD RUBY AVEE210FRWYW210FRWY107TH BLVDE H A RDTS TARLENESTFRANCESSTKARONSTFURLOWDRCASTLEGATELNC ENTRAL BLVD CALHOUNSTCALIFORNIA STRESEARCH DRBALDWIN AVE MOUN T AIN GROVE E RIVERVIEW DR E CO OL EY AVE E VICTORIA AVENORTONBLVD COLORADOSTRIVER BLUFF AVE DOMESTIC AVE W PIO NEER AVE TENNESSEESTM I L L S T AL MO ND AVE PERIMETER BLVD ATP CYCLE 3 0 560 1,120 1,680Feet Scale OneStop.mxd PROPOSED SANTA ANA RIVER TRAIL PROPOSED SANTA ANA RIVER TRAILEXISTING EAST VALLEY CORRIDOR MULTI-PURPOSE TRAIL CITY OF REDLANDSPROPOSED CLASS 3 BIKE ROUTE EXISTING EASTVALLEY CORRIDOR CLASS 1 BIKE PATH ORANGE BLOSSO M TRAIL PHASE 3 EXISTING EAST VALLEY CORRIDOR MULTI-PURPOSE TRAIL COUNTY PROPOSED CLASS 2 BIKE LANE CITY OF REDLANDSPROPOSED CLASS 2 BIKE LANE PROPOSED SANTA ANA RIVER TRAIL CITY OF REDLANDSPROPOSED CLASS 1/4 BIKE PATH CONNECTION TO CITY OF HIGHLANDPROPOSED CLASS 2 BIKE LANE AND CLASS 1 BIKE PATH ON CITY CREEK COUNTYPROPOSED CLASS 2BIKE LANE kj kj kjkjkj kj ROUTE CONNECTION PROPOSED CLASS 3BIKE ROUTE COUNTY OF SAN BERN ARDINO CITY BOUNDARY CITY OF REDLANDS CITY OF RED LA NDS CITY OF REDLANDS CITY OF HIGHLAND CITY OF SAN BERN ARDINO CITY BOUNDARY kj PROPOSED SANTA ANA RIVER TRAIL PROPOSED CLASS 2BIKE LANE PROPOSED CLASS 1BIKE PATH kj kj FUTURE CLASS 2 BIKE LANE BY IVDA