Loading...
Art3_Rialto_FY17_BikePed_CedarXing_SCRRA Agreement Amendment_No._1AMENDMENT NO. 1 CONSTRUCTION AND MAINTENANCE AGREEMENT for CEDAR AVE BETWEEN SOUTHERN CALIFORNIA REGIONAL RAIL AUTHORITY AND THE CITY OF RIALTO COVERING THE HIGHWAY-RAIL AT GRADE CROSSING AT SCRRA MILE POST 51.44 - SAN GABRIEL SUBDIVISION US DOT NO.: 026140C CPUC NO.: 101SG-51.44 IN RIALTO, SAN BERNARDINO COUNTY, CALIFORNIA DocuSign Envelope ID: CABAEEA5-5FB4-49D3-AFE9-96EC4B9180FF SCRRA Folder No.: S0000106 SCRRA Project No.: 860851 Amendment No. 1 Construction and Maintenance Agreement for CEDAR AVE CPUC No. 101SG-51.44 DOT No.: 026140C SCRRA MILE POST 51.44 - SAN GABRIEL SUBDIVISION RIALTO, SAN BERNARDINO COUNTY, CALIFORNIA THIS Amendment No. 1 (“AMENDMENT NO. 1”) to the Construction and Maintenance Agreement for Cedar Ave, effective September 4, 2018, hereinafter referred to as (“C&M AGREEMENT”) is made and entered into as of the __________ day of __________, 202___, by and between the SOUTHERN CALIFORNIA REGIONAL RAIL AUTHORITY, a joint powers authority existing under the laws of the State of California (hereinafter referred to as "SCRRA"), to be addressed at 900 Wilshire Blvd, Suite 1500, Los Angeles, CA 90017 and the CITY OF RIALTO, a general law city and municipal corporation duly organized and existing under the laws of the State of California (hereinafter referred to as “CITY”), to be addressed at 335 W. Rialto Avenue, Rialto, CA 92376. SCRRA and the CITY may be referred to singly as “PARTY” and collectively as “PARTIES.” DocuSign Envelope ID: CABAEEA5-5FB4-49D3-AFE9-96EC4B9180FF 22nd 3December RECITALS: Whereas, by C&M AGREEMENT, SCRRA and the CITY entered into an Agreement for the CITY to construct, maintain and operate Cedar Ave crossing enhancements. Whereas, the CITY has requested SCRRA to complete the civil scope of work on the behalf of the CITY. Therefore, it has been agreed that the C&M AGREEMENT will be amended in this AMENDMENT NO. 1. AGREEMENT NOW, THEREFORE, it is mutually agreed by and between the PARTIES hereto as follows: Amend ARTICLE 8 – SCOPE OF WORK AND ESTIMATE BY SCRRA, Page 8 of 19, Delete paragraph 8.1 in full and in lieu thereof insert, 8.1 The RAILROAD WORK to be performed by SCRRA, at the CITY's sole cost and expense, is described in Exhibit D-2 – SCRRA Scope of Work and Estimate, dated November 16, 2023 in the amount of $675,000.00. The estimate includes flagging and other protective and support services incurred by SCRRA for the SCRRA Scope of Work. Amend ARTICLE 13 – PAYMENT FOR SCRRA WORK, Page 13 of 19, Delete paragraph 13.1 in full and in lieu thereof insert, 13.1 Upon the execution of this AGREEMENT, the CITY shall deposit 100% of the amount of the estimate contained in Exhibit D-2 – SCRRA Scope of Work and Estimate with SCRRA. During the construction of the PROJECT, SCRRA will send CITY quarterly progress statements detailing the costs of the RAILROAD WORK performed by SCRRA under this AGREEMENT. DocuSign Envelope ID: CABAEEA5-5FB4-49D3-AFE9-96EC4B9180FF If at any time, the actual cost, including the estimated allocated overhead, exceeds eighty percent (80%) of the amount deposited by the CITY, SCRRA shall, at its sole discretion, revise its estimates of the amount of RAILROAD WORK remaining, and the CITY shall deposit any additional amounts in excess of the original deposit with SCRRA. Upon the execution of this AMENDMENT NO 1, the CITY shall deposit $98,078.00 of the amount of the estimate contained in Exhibit D-2 – SCRRA Scope of Work and Estimate with SCRRA, which brings the deposit to 100% of the estimate. Delete paragraph 13.3 in full and in lieu thereof insert, 13.3 CITY acknowledges that the SCRRA Estimate contained in Exhibit D-2 includes the flagging or other protective service costs provided by SCRRA that are to be paid by CITY in connection with the SCRRA WORK. Amend EXHIBIT D-1 – SCOPE OF WORK BY CITY Delete Exhibit D-1 in full and in lieu thereof insert, DocuSign Envelope ID: CABAEEA5-5FB4-49D3-AFE9-96EC4B9180FF EXHIBIT D-1 To Construction and Maintenance Agreement for CEDAR AVE Cover Sheet for the CITY Scope of Work “CITY WORK” DocuSign Envelope ID: CABAEEA5-5FB4-49D3-AFE9-96EC4B9180FF EXHIBIT D-1 CITY Scope of Work CITY Scope of Work: 1) Relocate any non-SCRRA utilities DocuSign Envelope ID: CABAEEA5-5FB4-49D3-AFE9-96EC4B9180FF Amend EXHIBIT D-2 – SCOPE OF WORK AND ESTIMATE BY SCRRA Delete Exhibit D-2 in full and in lieu thereof insert, EXHIBIT D-2 To Construction and Maintenance Agreement for CEDAR AVE Cover Sheet for the SCRRA Scope of Work and Estimate “RAILROAD WORK” DocuSign Envelope ID: CABAEEA5-5FB4-49D3-AFE9-96EC4B9180FF EXHIBIT D-2 SCRRA Scope of Work and Estimate SCRRA Scope of Work: 1) Install Signal equipment 2) Adjust/relocate existing Railroad Signal related pullboxes 3) Remove backlight on median-mounted CPUC Standard No. 9. 4) Install pedestrian gate and foundation, adjust existing vehicle gate if necessary 5) Install railroad Emergency Notification Sign on north pedestrian gate 6) Install two (2) sets of additional ADA compliant crossing panels on east side of crossing 7) Replace two (2) set of existing concrete crossing panels with ADA compliant concrete crossing panels 8) Replace 6 existing damaged field-side concrete crossing panels on the existing crossing 9) Install ballast for maintenance driveway 10) Make necessary changes to SCRRA’s PTC System, including testing and implementation of revised subdivision files 11) Construct curb and gutter, driveways, and sidewalk 12) Construct handrail 13) Construct emergency swing gates with required signage Note: Pedestrian gate arm cannot be installed until emergency exit sign is installed on emergency swing gate 14) Install warning pavers 15) Install/relocate all signage except railroad Emergency Notification Signs 16) Install pedestrian barricades with appropriate signage DocuSign Envelope ID: CABAEEA5-5FB4-49D3-AFE9-96EC4B9180FF 17) Install/refresh striping and raised pavement markers; traffic and pedestrian 18) Construct ROW fencing and maintenance access gates 19) Remove and reconstruct grouted rip rap 20) Rough grade maintenance access road 21) Construct riprap around existing storm drain system 22) Install asphalt concrete pavement around concrete crossing panels, including ramp ends DocuSign Envelope ID: CABAEEA5-5FB4-49D3-AFE9-96EC4B9180FF SCRRA Estimate: DocuSign Envelope ID: CABAEEA5-5FB4-49D3-AFE9-96EC4B9180FF IN WITNESS WHEREOF, the PARTIES have caused this AMENDMENT NO. 1 to be duly executed in by their duly qualified and authorized officials. SOUTHERN CALIFORNIA REGIONAL CITY OF RIALTO RAIL AUTHORITY By: ________________________________ By: ______________________________ Darren M. Kettle Henry Garcia Chief Executive Officer Interim City Manager Date: ________________________________ Date: _______________________________ APPROVED AS TO FORM: APPROVED AS TO FORM: By: ______________________________ By: ______________________________ Don O. Del Rio Eric Vail SCRRA General Counsel City Attorney Date: ________________________________ Date: _______________________________ Darren M. Kettle Digitally signed by Darren M. Kettle Date: 2023.12.19 14:14:32 -08'00' Don O. Del Rio Digitally signed by Don O. Del Rio Date: 2023.12.15 09:41:05 -08'00' DocuSign Envelope ID: CABAEEA5-5FB4-49D3-AFE9-96EC4B9180FF December 21, 2023 December 22, 2023