Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Art3_Fontana_FY17_BikePed_AlderSRTS_App
City of Fontana Alder Middle School Safe Routes to School Project SBCTA Transportation Development Act (TDA) Article 3 Biennial Call for Projects Bicycle and Pedestrian Facilities PREPARED FOR: San Bernardino County Transportation Authority 1170 W. 3rd Street, 2nd Floor San Bernardino, CA 92410-1715 (909) 884-8276 PREPARED BY: City of Fontana 8353 Sierra Avenue Fontana, CA 92335 (909) 350-7632 July 7, 2017 i APPLICATION NARRATIVE (SUBMITTED THROUGH ONLINE APPLICATION) .............................. ATTACHMENT A: LOCATION MAP ............................................................................. 1 ATTACHMENT B: PRELIMINARY DESIGN PLANS ............................................................. 3 ATTACHMENT C: COST ESTIMATE .............................................................................. 7 ATTACHMENT D: PARK SERVICES AREA CALCULATOR ..................................................... 8 ATTACHMENT E: TRANSPORTATION INJURY MAPPING SYSTEM REPORT ............................. 9 ATTACHMENT F: SITE PHOTOS ................................................................................ 10 ATTACHMENT G: ALDER MIDDLE SCHOOL SUPPORT LETTER .......................................... 13 ATTACHMENT H: PAGES FROM TRANSPORTATION (RTP/SCS AND NMTP) PLANS ............. 14 Table of Contents 1 City of Fontana SBCTA Transportation Development Act (TDA) Article 3, Biennial Call for Projects Bicycle and Pedestrian Facilities NARRATIVE TEMPLATE PROJECT INFORMATION Project Title: City of Fontana: Alder Middle School Safe Routes to School (SRTS) Project Project Type: Safe Routes to School Project Length: 2,625 Linear Feet (0.50 Miles) Amount of Local Match: $253,036 Local Match Funding Sources: Local Measure I Funds Contact Name: Noel Castillo Agency: Engineering Manager, City of Fontana Engineering Contact Phone: (909) 350-7632 Contact Email: ncastillo@fontana.org PROJECT NEED AND PURPOSE Provide data to support potential use of the bicycle or sidewalk facility: Project Description. The City of Fontana requests $250,000 to close sidewalk gaps and install Class III bike routes to make active transportation feasible, safer and convenient for school children and residents. The proposed project will provide sidewalk gap closures at four street segments. Safety improvements include installing new sidewalks (where none currently exist), constructing new curbs, gutters, and ADA-compliant ramps, installing streetlights, and signage and crosswalk striping, as needed on Alder Avenue, Laurel Avenue, and Miller Avenue. The Project will also include Class III bike path signage along Alder Avenue and Miller Avenue (See Attachment A: Project Location Map for details). The proposed project location was identified as being needed during the SBCTA SRTS audit held on May 9, 2016, and is located in a densely-populated area where there are major sidewalk gaps. Currently, students and residents are forced to share the roadway with vehicles travelling at 35-50 miles per hour, putting them in harm’s way of serious injuries. A more detailed scope of work for each segment follows: 2 • Segment 1. Alder Avenue 285 Linear Feet (between Mesa Road and Shamrock Avenue) o Install sidewalks; o Construct curb and gutter; o Construct ADA-accessible curb ramps; o Construct ADA-compliant driveways; o Install Class III bicycle lane signage and pavement legends (listed as a proposed improvement on page 5-64 of the NMTP - Alder Avenue between Baseline Road and Randall Avenue); and o Install streetlights (not included in grant request). • Segment 2. Alder Avenue 530 Linear Feet (between Miller Avenue and Fairview Drive) o Install sidewalks; o Construct curb and gutter; o Construct ADA-accessible curb ramps; o Construct ADA-compliant driveways; o Install Class III bicycle lane signage and pavement legends (listed as a proposed improvement on page 5-64 of the NMTP - Alder Avenue between Baseline Avenue and Randall Avenue); o Install streetlights (not included in grant request); and o Install crosswalk striping at Fairfax Street. • Segment 3. Laurel Avenue 670 Linear Feet (from Raymond Court to Miller Avenue) o Install sidewalks; o Construct curb and gutter; o Construct ADA-accessible curb ramps; o Construct ADA-compliant driveways; and o Install streetlights (not included in grant request). • Segment 4. Miller Avenue 1,140 Linear Feet (from Alder Avenue to Laurel Avenue) o Install sidewalks; o Construct curb and gutter; o Construct ADA-accessible curb ramps; o Construct ADA-compliant driveways; o Install Class III bicycle lane signage and pavement legends (listed as a proposed improvement on page 5-65 of the NMTP - Miller Avenue between the Pacific Electric Trail and Maple Avenue); and o Install streetlights (not included in grant request). The project will be designed according to general design criteria for non-motorized facilities as outlined in the Caltrans Highway Design Manual, the ASSHTO Guide for Planning, Design, and Operation of Pedestrian Facilities (2004), and the ASSHTO Guide for the Development of Bicycle Facilities (2004). The proposed project will also remove mobility barriers including flooded streets during storm events. As gutters and street drains help prevent street flooding, bicyclists will have the option to travel on streets, even on rainy days. It is the City’s hope that, by providing safer pathways, residents will choose to walk or bike to their destinations for both work, school and play; thereby reducing the number of vehicle trips, which in turn decreases the level of greenhouse gas emissions and improve air quality. The following supports potential use of the project: 3 Socio-Economic Data. Many of Fontana’s residents share one vehicle or have no vehicle, and walking and/or biking are their only options to get to school, work, local and regional transportation connections, as well as shopping, community, and recreation destinations. According to the 2015 U.S. Census and the California Department of Education, the following demographics highlight the City's ethnic diversity and socio-economic status: • Total Fontana population: 203,003; • 67% of Fontana residents report being of Hispanic or Latino descent; • 15% of residents are living below the poverty level; • Only 15% of residents over the age of 25 have attained a Bachelor's degree, or higher; • 30% of residents are foreign-born and 58% speak a language other than English (Fontana boasts a high immigrant population); • 1,180 students attend the benefitting school (Alder Middle School) with 89% qualifying for the USDA Free and Reduced Price Meal Program; • The City's unemployment rate is 7.3% compared to the State of California rate of 6.7%. Over 4,800 residents live within a half-mile of the project site and represent potential users who have the option to walk or bike to their destinations rather than drive. A safer sidewalk network provides a more economical way to travel for lower-income families. Of those residents living within a half-mile of the project sites, 719 live below the poverty level (See Attachment D for details). Improvements to the existing sidewalk and bicycle networks are projected to help low-income residents save on transportation costs, including vehicle maintenance and fuel, simply by walking or biking to their destinations. Bike/Walk Count Information. For the 2016-2017 school year, Alder Middle School had 1,180 enrolled students. Of those enrolled, 74% or approximately 872 students, walked or rode a bicycle to and from school. A study performed by the California Safe Routes to Schools program demonstrated that one of the most effective engineering measures to encourage children to walk to school is to provide sidewalks. The National Household Travel Survey predicts an overall 10% increase in active transportation due to new sidewalks, an increase of approximately 87 students in addition to other potential pathway users. Surveys collected for SBCTA SRTS analysis provides additional support for an increase in student users. The survey revealed that 30% of Fontana parents interviewed stated they do not want their children to walk or bike to school alone, 10% cited due to no bike paths or bike lanes, and 10% stated their children do not walk or bike to school because there are no continuous sidewalks along their routes. By installing sidewalks that provide improved safety and connections to school routes, we are confidant parents will feel safer allowing their children to walk or bike to school and will encourage more children to utilize the new pathways. In addition, the installation of streetlights will improve the safety of dawn and dusk walking and biking particularly during the winter months when it is still dark outside when children are travelling to school or getting dark when leaving afterschool activities. Public Health. Healthy Fontana is a community-based program that promotes a healthy lifestyle and encourages physical exercise. Originally developed by the then City Mayor’s Let’s Move initiative to help combat childhood obesity, the program has been in existence for over 10 years to encourage students to walk or bike to school and local destinations. Program activities include walking clubs and partnering with Fontana Unified School District (FUSD) to encourage elementary-aged children to incorporate one hour of physical exercise per day. Since over 33% of the City’s population consists of residents under the age of 18, the proposed project aims to benefit a large portion of the City population and represents the City’s dedication to encouraging an increase in potential pedestrian and/or bicycle pathway users. 4 According to a 2013 Community Health Needs Assessment performed by Kaiser Hospital, 33% of youth and 28% of adults in Fontana are overweight or obese. Participation in active transportation increases daily physical activity proven to combat the childhood obesity epidemic that plagues our youth. Describe how this project is situated in the regional system. Explain how the project is consistent with a Regional Transportation Plan or SANBAG Non-Motorized Transportation Plan (NMTP), if applicable: A stated goal within Fontana’s chapter of the San Bernardino County Transportation Authority’s (SBCTA) Non-Motorized Transportation Plan (NMTP) is to provide pedestrian access to connect surrounding land uses and commercial or mixed uses (page 5-66-68), in addition to providing pedestrian circulation systems that are safe, all-weather surfaces and aesthetically pleasing. The program of projects in the SBCTA NMTP have been incorporated into the Southern California Association of Governments’ (SCAG’s) 2012 Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS), which was adopted in April 2012 and amended September 11, 2014, after a 30-day public review and comment period. The proposed project included in this application is considered a part of that broader regional system. See Attachment H for selected pages of SCAG’s RTP/SCS and SBCTA’s NMTP, which can also be found at the following electronic link: http://www.sanbag.ca.gov/planning2/pdf/NMTP-RevisedMay2015.pdf. Outline the destinations served by this project. Destinations can be in a list form with potential number of bicycle and/or pedestrian users described: The City conducted a careful analysis of City streets to identify project sites that would provide the most utilized routes for residents, with particular attention on the local student population. In addition to creating new sidewalk routes for over 870 school children who walk or bike to and from Alder Middle School, the project will also provide links and connecting routes to some of the top employers in the City (Wal-Mart, Kaiser Hospital, City of Fontana, and Target Corporation), and allow for employees to commute on foot, via bike, or link to public transportation. The proposed project provides connectivity to 12 bus stops, three churches, two parks, three schools, and one hospital, in addition to several businesses that are all within one mile of the proposed project site. Please see Attachment A: Destinations and Connections Map. Locations within one-half mile of the project site. 1. Alder Middle School (7555 Alder Ave.): For the 2016-2017 school year, Alder Middle School had 1,180 enrolled students, 74%, approximately 872 students, who walked or rode a bicycle to and from school. 2. Fernandez Park (18006 Miller Ave.): According to the American Community Survey, 5,118 residents live within one-half mile of Fernandez park and represent potential users of new bicycle and/or pedestrian pathways in the area. 3. The Church of Jesus Christ of Latter-Day Saints (7526 Alder Ave.): According to the American Community Survey, 5,657 residents live within one-half mile of the church. Residents in the area, numerous members, and 21 employees of the church represent potential users of new bicycle and/or pedestrian pathways in the area. 4. Iglesia Pentecostal Emmanuel (7572 Laurel Ave.): According to the American Community Survey, 5,358 residents live within one-half mile of the church. Residents in the area, numerous members, and three employees of the church represent potential users of new bicycle and/or pedestrian pathways in the area. 5 5. Laurel Convalescent Hospital (7509 Laurel Ave.): According to the American Community Survey, 4,700 residents live within one-half mile of the hospital. Residents in the area, patients (currently housing 95 temporary and permanent), staff, and numerous visitors of the nursing home represent potential users of new bicycle and/or pedestrian pathways in the area. 6. Blessed John XXIII Catholic Community Church (7650 Tamarind Ave at the corner of Miller Ave.): According to the American Community Survey, 7,048 residents live within one-half mile of the church. Residents in the area, members, and employees of the church represent potential users of new bicycle and/or pedestrian pathways in the area. Describe how this project improves the safety of cyclists and/or pedestrians using the corridor: The City of Fontana faces barriers to active transportation that can be addressed through thoughtful planning, engineering, and design. Such barriers include wide roadways with fast-moving vehicle traffic like Foothill Boulevard, Valley Boulevard and Jurupa Avenue, to name a few. Fontana’s existing bicycle network helps to integrate bicycling into the roadway system and there are many opportunities for enhancing connectivity and user experience. Many of the existing bike lanes are narrow and do not provide adequate connectivity between where people live, work, and play. Goal 2 of the Fontana Active Transportation Plan is Safety. The goal is to improve safety for active transportation users through the design and maintenance of sidewalks, streets, intersections, and other roadway improvements such as signage, lighting, wayfinding, and landscaping; as well as best practice, non-infrastructure programs to enhance and improve the overall safety of people walking and bicycling. By implementing such projects as the proposed Alder Middle School SRTS Project, the City aims to reduce the combined number of collisions, injuries, and fatalities involving people walking and bicycling by 50 percent from 2015 levels by 2025. Currently, the proposed project area has 2,625 linear feet of sidewalk gaps where children aged 11-15 are forced to walk in the street or on dirt/grass areas directly next to the roadways. The proposed project will address three main thoroughfare roadways which provide access to Alder Middle School and local area destinations: Alder Avenue (11,000 ADT), Laurel Avenue (2,300 ADT), and Miller Avenue (6,200 ADT). The speed limits on the three roadways have posted speed limits ranging from 35 to 50 mph (outside of the designated school zones) where children who live in the surrounding neighborhoods walk and/or bike to and from school. According to the Transportation Injury Mapping System (TIMS) SRTS Collision Reports, between 2006 and 2013 there have been eight (8) injury accidents involving cyclists and/or pedestrians within one-half mile of Alder Middle School (See Attachment E for further details). In San Bernardino County, 8% of roadway injuries and 19% of fatalities are suffered by people walking or biking (SCAG, 2012 RTP/SCS). The Federal Highway Administration’s 2008 Traffic Safety Study found that when pedestrians and bicyclists travel on separate pathways from vehicles, the number of accidents is reduced by up to 88%. The proposed project will reduce the number of pedestrian and bike incidents by providing new sidewalks and Class III bike route signage and pavement legends that will provide additional awareness to drivers of the presence of bicyclists. Explain the multimodal or transit system connectivity provided by this project: The proposed SRTS project is listed in the SBCTA NMTP as part of the proposed regional bike network. The project implements bike and pedestrian improvements to Alder and Miller Avenues along sections listed in the NMTP as proposed Class II and Class III bike lanes. Forward-thinking planning activities by the City and the SBCTA positioned this project ideally for connectivity. Alder and Laurel Avenues are 6 primary north/south corridors connecting to Baseline Avenue to the north and Foothill Boulevard to the south. Baseline Avenue and Foothill Boulevard are OmniTrans transit bus routes with 12 bus stops in the immediate project area (within one mile). Omnitrans Route 10 along Baseline Avenue serves the cities of San Bernardino and Fontana, and connects to the San Bernardino Transit Center (SBTC), which is also served by Mountain Area Regional Transit Authority (MARTA) and Victor Valley Transit Authority buses. SBTC (opened in 2015) is also a proposed stop on the Metrolink commuter rail system's San Bernardino Line, Inland Empire-Orange County Line, and the Redlands Passenger Rail Project. Route 10 also connects to the Fontana Metrolink Transfer Center, which connects by rail to San Bernardino and Los Angeles. OmniTrans Route 14 along Foothill Boulevard also connects to both of these regional transportation hubs, as well as Fontana City Hall, Lewis Library & Technology Center, Omnitrans Metro, and the San Bernardino Senior Center. The project provides a high level of connectivity to these intermodal opportunities. The NMTP suggests that local jurisdictions “develop better bicycle connectivity between cities and subareas of the County by coordinating the location and staging of network improvements…Connectivity on Class II and Class III bicycle facilities can be increased by prioritizing the ‘low-hanging fruit’ – parts of the regional system that are low-cost, close gaps in the system, and provide connections to key destinations” (SBCTA NMTP page ES-8). Our proposed project does just that. We are asking for cost-efficient improvements that will close gaps in key segments of pedestrian and bicycle routes to schools and regional transit stops. The project removes existing barriers to pedestrian and bike travel, and improves access to a dozen bus stops in the project area. The project implements a key segment of a safe, interconnected cycling and walking system in our community, and in our region. Establish the level of this project’s readiness. Include a discussion on the local participation process that resulted in the identification and prioritization of the project: Existing Infrastructure. The proposed project locations on Alder Ave., Miller Ave., and Laurel Ave. are paved and well-maintained vehicle corridors. The intersection at Alder Ave. and Miller Ave. is currently signalized and Laurel Ave. and Miller Ave. (both included in the project area) is an all-way stop. Project Readiness. The proposed project is in the preliminary design phase. If awarded, the proposed schedule will be as follows: • Task 1. Execute Grant Agreement (3 months) • Task 2. Design (6 months) • Task 3. Advertise and Bid for Proposals/Environmental Compliance (4 months) • Task 4. Construction (4 months) • Task 5. Project and Grant Close-Out (2 months) Local Participation. SBCTA Non-Motorized Transportation Plan (adopted March 2011 and updated May 2015). The SBCTA Plans and Programs Committee served as the committee with policy oversight throughout the process. Public involvement opportunities were available through the open meetings of the Plans and Programs Committee. Agendas were posted and were available to all through the SBCTA website. However, direct outreach to the public and advocacy groups was limited during the course of the development of this Plan, due to the compressed timeline in which the Plan had to be prepared once the dates were set by 7 the State for local jurisdiction applications for Bicycle Transportation Account funds. Nevertheless, one of the implementation actions listed in Chapter 7 was to take this significantly upgraded NMTP to both bicycle and pedestrian advocates and the general public. Comments and suggestions from these groups were incorporated into the Plan for the 2015 update. SBCTA (SANBAG) SRTS Phase II (in development). In preparation for the SBCTA SRTS Phase II Plan, SBCTA developed extensive public outreach opportunities in each community. On May 9, 2016, SBCTA held a SRTS Walk/Bike Audit at Alder Middle School including the following activities: 1) volunteers took counts of students walking and/or biking to and from school; 2) photos were taken along the pathways taken by students to document sidewalk, bike path, and safety needs; 3) surveys were sent to every parent; and 4) a public meeting was held to discuss safety needs and the desires of the community. Over 300 surveys were completed and returned citing an overwhelming desire for sidewalks and bike paths. Many parents cited a willingness to allow their children to bike and/or walk (who currently do not walk and/or bike) if there were safer routes available. Surveys are available by request. Fontana Active Transportation Plan (Draft) June 1, 2017. Through engaging the community in a multi- faceted, interactive outreach approach, which included several pop-up workshops, in-person interviews, and an online survey, this Plan is an opportunity to educate the community on opportunities to improve bicycling and walking, gauge the community’s commitment level to active transportation facilities, increase awareness and promote mutual respect between road users, and identify current bicycle and pedestrian network deficiencies and safety issues. Has the agency delivered past projects on Schedule? If yes, what steps will be taken to ensure similar results? If no, what steps will be taken to prevent a similar occurrence: Yes. Fontana has extensive experience managing and implementing this type of project on schedule and within budget. The City has assembled a project team of experienced, highly qualified engineers with experience planning, designing, and implementing similar projects. The project’s management team has managed similar projects with coordinated, interagency cooperation, and understand how to facilitate and achieve a successful bicycle/pedestrian project in a high-density urban area. In addition to an expert team managing the project, the City will contract with leading experts whenever internal expertise is insufficient to meet project needs. Previous Projects. 1) San Bernardino Associated Governments' Transportation Development Act (TDA) Grant ($750,000) for the Sierra Avenue at Metrolink At-Grade Crossing Project. The project was awarded December 11, 2012 and is currently in progress. 2) San Bernardino Associated Governments' Transportation Development Act (TDA) Grant (750,000) for the Juniper at Metrolink At-Grade Crossing Project. The project was awarded June 13, 2013 and is currently in progress. 3) Safe Routes to School (State) Grant ($254,200) for the Palmetto Elementary School Intersection (Randall/Palmetto) Project. The project was awarded July 12, 2012 and successfully completed in February 2016. 4) Caltrans Active Transportation Program Grant ($1,624,000) for the Safe Routes to Schools sidewalk improvement project: Arrow Blvd. and Fontana Ave. The project was awarded November 12, 2014 and is currently in progress. Attach Pictures and/or Documents: Attachment PDF Package includes the following: 8 Cover Letter Cover Page Table of Contents Attachment A: Project Location Map Attachment B: Preliminary Design Plans Attachment C: Cost Estimate Attachment D: Park Services Area Calculator Attachment E: Transportation Injury Mapping System Report Attachment F: Site Photos Attachment G: Alder Middle School Support Letter Attachment H: Pages from Transportation Plans PRELIMINARY ENGINEERING/DESIGN COST Preliminary Engineering/Design Cost: $72,000 Right of Way Cost: $36,300 (plus an additional $42,000 not included in requested grant funds) Project Development Cost (Construction Costs): $394,736 (plus an additional $215,853 not included in requested grant funds) Total Project Cost: $503,036 (plus an additional $257,853 not included in requested grant funds) LTF, Article 3 Funds Requested: $250,000 Local Match: $253,036 City Limit Rialto Fontana Alder Middle School Alder Avenue ADT 11,000Miller Avenue ADT 6,200 Proposed Project Sections: Sidewalks, Curbs, Gutters, and ADA- Accessible Ramps and Driveways, Crosswalk Striping, and Street Lights Proposed Class II Regional Bike Lanes (not included in project) Proposed Class III Bike Lanes Laurel Avenue ADT 2,300City of Fontana: Alder Middle School Safe Routes to School Project Attachment A: Project Location Map 1 Rialto Municipal Airport Downtown/City Hall (Metrolink Sta. 1/2 mile southwest) City Limit Fontana Rialto Walnut Village City of Fontana: Alder Middle School Safe Routes to School Project Attachment A: Destinations and Connections MapSchool Hospital Place of Worship Omintrans Bus Stop Future Class II Bike Lanes Park Park Alder AvenueLaurel AvenueMiller Avenue 2 Attachment B: Preliminary Design Plans Segment 1:Alder Avenue between Mesa Road and Shamrock Avenue (approximately 285 Linear Feet) 3 Segment 2:Alder Avenue from Miller Avenue to Fairview Drive (approximately 530 Linear Feet) 4 Segments 3:Laurel Avenue from Raymond Court to Miller Avenue (approximately 670 Linear Feet) 5 Segment 4:Miller Avenue from Alder Avenue to Laurel Avenue (approximately 1,140 Linear Feet) 6 Agency: Project Description: Project Location: Date of Estimate: Prepared by: Item No.Description Quantity Units Unit Cost Total Eligible Cost 1 Mobilization and Demobilization 1 LS $49,000.00 $49,000.00 $49,000 2 Clearing and Grubbing 1 LS $43,000.00 $43,000.00 $43,000 3 Traffic Control 1 LS $20,000.00 $20,000.00 4 SWPPP 1 LS $6,500.00 $6,500.00 5 Construct 8" P.C.C. Curb & Gutter 2,625 LF $25.00 $65,625.00 $65,625 6 Construct 4" Thick P.C.C. Sidewalk 10,845 SF $10.00 $108,450.00 $108,450 7 Construct PCC ADA compliant Driveway 5,472 SF $8.00 $43,776.00 $43,776 8 Install ADA Curb Ramps 8 EA $5,000.00 $40,000.00 $40,000 9 Signage (including Class III Bike Paths), Striping (including crosswalks), and Pavement Legends 1 LS $11,000.00 $11,000.00 $9,000 10 Streetlights 12 EA $5,000.00 $60,000.00 11 Construct 6" AC Pavement over 12" min. 95% compacted soil 253.3 TON $120.00 $30,396.00 12 Grind 0.1' and overlay 0.1' AC 41.1 TON $120.00 $4,932.00 13 14 15 16 17 18 19 20 21 Subtotal:$482,679.00 $358,851 Contingency (10%):$48,267.90 $35,885 CONSTRUCTION TOTAL:$530,946.90 $394,736 ALL PHASES Amount 1 Environmental Studies 10,000$ 10,000$ Plans, Specifications and Estimate (PS&E)62,000$ 62,000$ TOTAL PE 72,000$ 72,000$ 2 Right of Way Engineering 12,000$ Acquisitions 36,300$ 36,300$ Utilities 30,000$ TOTAL R/W 78,300$ 36,300$ 3 Construction Engineering 79,642$ Construction Items (above)530,947$ 394,736$ TOTAL CONSTRUCTION 610,589$ 394,736$ 760,889$ 503,036$ June 6, 2017 Jeff Kim Detailed Engineer's Estimate and Project Cost City of Fontana Construction of ADA-compliant sidewalks, curb and gutter, and driveways. PRELIMINARY ENGINEERING (PE) RIGHT OF WAY (R/W) CONSTRUCTION TOTAL FOR ALL PHASES East side of Alder Ave. from Mesa Rd. to Shamrock Ave., East side of Alder Ave, from Miller Ave, to Fairview Dr., West Side of Laurel Ave. from Raymond Court to Miller Ave., and South Side of Miller Ave. from Alder Ave. to Laurel Ave. Attachment C: Cost Estimate 7 Project ID: 2268 Date Created: 06/08/2017 Coordinates: 34.118, -117.418 This is your LWCF Service Area report for the project you have defined. Please refer to your Project ID in any future communications about this project. Project Area StatisticsProject Area Statistics Project Area MapProject Area Map County:County:San Bernardino City:City:Fontana Total Population:Total Population:4,882 Margin of Error:(+/- 625) Per Capita Income:Per Capita Income:$ 17,575 # People Below Poverty:# People Below Poverty:719 Park Acres in Area:Park Acres in Area:0.00 Park Acres / 1,000 Population:Park Acres / 1,000 Population:0.00 Data Sourc es :Data Sourc es : American Community Survey (ACS) 5-year estimates Parks data from Calif. Protected Areas Database 2013b (Sept. 2013) - www.CALands.org Report BackgroundReport Background The project area statistics have been calculated based on the selected radius (in miles) from the point location of your project. The buffer is referred to as the project service area. Population and people in poverty are calculated by determining the percent of any block groups that intersect with the service area. The service area is then assigned the sum of all the block group portions. An equal distribution in block groups is assumed. Per capita income is calculated as a weighted average of the block group values that fall within the service area. More information on the calculations, and a detailed description of the margin of error are available at: http://www.mapsportal.org/lwcf/LWCF_Calculation_Documentation.pdf Parks and park acres are based on best available source information but may not always contain exact boundaries or all parks in specific locations. Parks acreage does not include major lakes or ocean, and may not include recreation facilities where those occupy most of a site. Users can send update information on parks data to: parkupdates@parks.ca.gov Attachment D: Park Service Area Calculator 8 6/19/2017 Attachment E: TIMS Transportation Injury Mapping System https://tims.berkeley.edu/tools/srts/1/1 Safe Routes to School Collision Map Viewer Interactive map and data summaries of bicycle and/or pedestrian collisions around school. Types of Collisions: Bicycle Pedestrian Collision Severity: Fatal Severe Injury Other Visible Injury Complaint of Pain Years:2006 - 2013 Summary Statistics Radius Fatal Severe Injury Visible Injury Complaint of Pain Pedestrian Bicycle Total <¼ mi.0 0 2 1 1 2 3 ¼ - ½ mi.0 1 1 3 3 2 5 Total 0 1 3 4 4 4 8 Collision List Alder Middle 7555 Alder Avenue | Fontana | San Bernardino County | CDS: 36677106059398 Map data ©2017 Google 9 Photo A -Alder Avenue. This picture shows a lack of proper crosswalks. Students are forced to maneuver across traffic, while motorists must yield to pedestrian traffic. This causes a ‘guessing game’ between pedestrian, bicyclist, and motorist. Without proper crosswalks pedestrians and bicyclists are at risk of being hit by moving traffic. Photo B –Alder Avenue. Students walking along the roadway with moving traffic. Without proper sidewalks, students can easily be side- swiped by moving vehicles. Photo C -Alder Avenue. This is an example of the current lack of adequate sidewalks and crosswalks along Alder Avenue. At the open and close of school daily, approximately 872 students either walk or bike to and from school and are sharing the roadways with vehicles travelling 40-50 miles per hour outside of school zones daily. The average daily traffic on Alder Avenue alone is 11,000 vehicles. Attachment F: Project Site Photos (1 of 3) City of Fontana: Alder Middle School Safe Routes to School Project 10 Attachment F: Project Site Photos (2 of 3) City of Fontana: Alder Middle School Safe Routes to School Project Photo D -Corner of Laurel Avenue and Raymond Court. Photo E -Laurel Avenue north of Miller Avenue facing north toward Raymond Court. Photo D and E. Pictured are examples of the current lack of sidewalks along Laurel Avenue between Miller Avenue and Raymond Court. There is no barrier preventing vehicles from merging into pedestrian pathways. As can be seen, the existing paths are dirt and gravel and make mobility limited, especially during rainfall when pathways become muddy with a lack of gutters to drain water. 11 Attachment F: Project Site Photos (3 of 3) City of Fontana: Alder Middle School Safe Routes to School Project Photo G –Miller Avenue at the corner of Laurel Avenue facing east toward Alder Avenue. Photo F –Miller Avenue. Photos F and G. Pictured are examples of blind spots for drivers. Corners that lack sidewalks and have residential landscaping hinder driver visibility from seeing pedestrians as they round the corner. The proposed project will remove these visibility barriers by providing ADA-compliant sidewalks and ramps. 12 13 ADOPTED APRIL 2012 Southern California Association of Governments 14 36 2012–2035 RTP/SCS | Chapter 2: Transportation Investments available is spent wisely is at the heart of this philosophy. At the bottom of this pyramid is System Monitoring and Evaluation. In order to be effective system managers, we must have an in-depth understanding of how our system performs and why it performs the way it does. Only by understanding these causes can we identify the optimal mix of strategies and projects that yield the highest returns on our investments. Next, we must take care of what we have and make sure that what we have is performing at the most efficient level possible. So, the basic idea as you move up the “mobility pyramid” is to implement less capital intensive strategies or less invasive strategies before we consider implement- ing more drastic measures to deal with our challenges. At the same time, we must be realistic about our ability to address our challenges with “soft solutions” alone in the face of the tremendous growth that we anticipate over the next 25 years. Therefore, at the top of the pyramid are the capital improvement projects that will allow us to expand our system strategically to accommodate such future growth and maintain and improve our economic prosperity. Following the system management philosophy, this chapter sets forth the investments and strategies that constitute the 2012–2035 RTP/SCS. First, transportation invest- ments should seek to optimize the performance of the existing system, and this includes system maintenance and preservation, integrated land use, operational improvements, transportation demand management, and transportation systems management strategies. Second, investments should seek to complete the system by addressing gaps. Finally, our investments should expand the system strategically. As a result, Southern Californians will enjoy more and better travel choices via an efficient multimodal transportation sys- tem with improved access to the vast opportunities this region has to offer. getting the most Out of Our system Over the past half century, the SCAG region has invested billions of dollars into building and expanding the multimodal transportation system that we have and rely on today. This investment must be protected. Under the system management approach, priority should be given to maintaining and preserving this system, as well as ensuring that it is being operated as safely, efficiently, and effectively as possible. Protecting our previous invest- ments in developing the region’s transportation system and getting the most out of every one of its components is the highest priority for this RTP/SCS. safety and security first SCAG recognizes how important the safety and security of our transportation system is to our residents. The good news is we have made significant progress in improving safety, particularly highway safety, which accounts for the majority of transportation-related accidents, around the state and in our region. But, we can do more. SCAG continues to support the implementation of the State Highway Safety Plan (SHSP) and works in part- nership with Caltrans and the CTCs around the region to improve the safety and security of our transportation system. Safety improvements are intricately woven into the RTP/SCS at all levels. Many of the strategy and investment categories in this RTP/SCS aim to improve the safety of our multimodal transportation system. For instance, enhancing maintenance and preservation of the region’s buses, rail track, bridges, and roadway pavements will contribute toward reduced accidents and improved safety. Similarly, expanding the network of bike lanes and sidewalks and bringing them into ADA (American with Disabilities Act) compliance will reduce accidents directly related to these modes. Furthermore, deploying technol- ogy such as advanced ramp metering to manage traffic flow also reduces collisions at on-ramps and critical freeway-to-freeway interchanges. In short, almost every category of investments discussed in this chapter leads to safety benefits. SCAG has two main safety and security goals: Ensure transportation safety, security, and reliability for all people and goods in the region. Prevent, protect, respond to, and recover from major human-caused or natural events in order to minimize the threat and impact to lives, property, the transporta- tion network, and the regional economy. sAfET y The rate of fatal and injury collisions on California’s highways has declined dramatically since the California Highway Patrol began keeping such data in the 1930s. California has led the nation in roadway safety for much of the past 20 years. Only recently have road- ways nationally become as safe as those in California. FiGURe 2.2 shows the improvement in roadway accidents in the SCAG region over the last 10 years. 15 2012–2035 RTP/SCS | Chapter 2: Transportation Investments 53 Increasing the frequency and quality of fixed-route bus service and the introduction of local community circulators to provide residents of smart growth developments with the option of taking transit over using a car to make short, local trips, and The implementation of transit priority facilities, such as bus lanes and traffic signal priority. Active Transportation Active transportation refers to transportation such as walking or using a bicycle, tri- cycle, velomobile, wheelchair, scooter, skates, skateboard, push scooter, trailer, hand cart, shopping car, or similar electrical devices. For the purposes of the RTP/SCS, active transportation generally refers to bicycling and walking, the two most common methods. Walking and bicycling are essential parts of the SCAG transportation system, are low cost, do not emit greenhouse gases, can help reduce roadway congestion, and increase health and the quality of life of residents. As the region works toward reducing conges- tion and air pollution, walking and bicycling will become more essential to meet the future needs of Californians. The majority of commuters within the SCAG region commute via car, truck, or van. According to the American Community Survey, in 2009, more than 85 percent of all com- muters traveled to work by car, truck, or van, and less than 4 percent traveled to work via an active transportation mode (0.7 percent bicycled and 2.5 percent walked to work). In addition, the National Household Travel Survey (NHTS) data indicate that approximately 20.9 percent of all trips were conducted by walking (19.2 percent) or bicycling (1.7 per- cent). This represents an approximately 75 percent increase from the 11.9 percent active transportation mode share in 2000. In addition, NHTS data indicate that 75.0 percent of all trips in 2009 were conducted by driving, and this is an approximately 10.6 percent decrease from the 83.9 percent mode share in 2000. Additional analysis regarding active transportation needs to be conducted in order to develop a better understanding of the users and their needs. The current level of data is extremely limited and does not provide a comprehensive overview of the current active transportation community. Active transportation users have differing levels of experience and confidence, which influences their decision to utilize active transportation. SCAG recognizes that there are a number of factors that motivate people to use active transpor- tation. Increased data collection may provide a clearer understanding of the needs and deficiencies associated with active transportation. Active transportation is not only a form of transportation in itself; it is also a means by which to access rail and bus service. Accessibility is one of the primary performance measures used to evaluate active transportation, by measuring how well the current infrastructure provides individuals with the opportunity to access destinations or facilities. Using a two-mile buffer for bicyclists and a half-mile buffer for pedestrians, we found that our current transit infrastructures provides 97 percent of our residents access to transit via bicycle and 86 percent access to transit by walking. While many individuals have access to transit stations by biking or walking, numerous other factors may influence an individual’s decision to use active transportation. Safety is an important factor that individuals consider when determining whether or not they should walk or bike to their destination. Based on data from the Statewide Integrated Traffic Records System (SWITRS), in 2008, 4.0 percent of all traffic-related fatalities in the SCAG region involved bicyclists, and 4.3 percent of all traffic-related injuries involved bicyclists. In addition, 20.9 percent of all traffic-related fatalities in the SCAG region involved a pedestrian, and 5.7 percent of traffic-related injuries involved pedestrians. While each of the counties in the SCAG region currently has its own active transporta- tion plan, the RTP/SCS aims at developing a regional active transportation system that closes the gaps and provides connectivity between counties and local jurisdictions. While bicyclists are legally allowed to use any public roadway in California unless specifically prohibited, many bicyclists may be more inclined to utilize bikeways. Currently, 42.6 percent of the region’s residents have easy access to 4,315 miles of bikeways. Local jurisdictions in the region have proposed an additional 4,980 miles of bikeways in this RTP/SCS that would increase this access to 62.4 percent of all residents. In order to close the remaining gaps in the bikeway network, this RTP/SCS goes a step further to include an additional 827 miles of bikeways to complete the SCAG Regional Bikeway Network. In order to make active transportation a more attractive and feasible mode of travel for the different users in our region, additional infrastructure improvements need to be made. The 2012–2035 RTP/SCS calls for improvements that would bring significant amount of deficient sidewalks into compliance with the Americans with Disabilities Act (ADA). Given that all trips, including vehicular trips, start with walking, it is important to ensure that the sidewalks and streets are accommodating to all users. In all, the RTP/SCS’s active transportation improvements exceed $6.7 billion. 16 2012–2035 RTP/SCS | Chapter 4: Sustainable Communities Strategy 141 Local Efforts ventura downtown Parking management district In order to solve the apparent parking shortage in its downtown area, the City of Ventura completed a downtown parking study. The study revealed that plenty of spaces were available in nearby city-owned lots, while other prime spaces in close proximity to local businesses were in high demand and always occupied. Local business employees were parking in the spaces most coveted by customers and patrons. The City’s solution to the problem: a flexible, demand-responsive paid parking district. Parking in downtown Ventura has since improved, contributing to a better downtown experience. Travel Demand management (TDm) In addition to the transportation network, the 2012–2035 RTP/SCS also relies on strate- gic and extensive Travel Demand Management (TDM) measures that support the expected land use pattern. These cost-effective strategies improve the effectiveness and capacity of the transportation system by supporting a shift from single-occupancy vehicle use to other alternatives. Many local jurisdictions in our region have become national lead- ers in the implementation of TDM strategies. For example, SCAG is working with local jurisdictions to close the gaps in the regional bikeway network and bring 12,000 miles of deficient sidewalks into compliance with the Americans with Disabilities Act (ADA). TDM measures will receive a total of $4.5 billion in available revenues compared to $1.3 billion in 2008, a more than 200 percent increase. The 2012–2035 RTP/SCS employs the following TDM measures to improve mobility and access: Bringing the majority of sidewalks and intersections in our region into American with Disabilities Act (ADA) compliance to increase the usability and effectiveness of our active transportation system; Promoting telecommuting and flexible work schedules; Development of mobility hubs for first mile/last mile connectivity; Expanding parking cash out programs in urban areas; and Promoting Guaranteed Ride Home programs. Transportation system management (Tsm) Transportation System Management (TSM) measures also support the goals of the RTP/ SCS by making improvements to increase capacity and improve operational efficiency. These techniques contribute to improved traffic flow, better air quality, and improved system accessibility and safety. The following TSM measures support the forecasted land use development pattern of the 2012–2035 RTP/SCS: Enhanced incident management; Advanced ramp metering; Corridor System Management plans; Traffic signal synchronization; and Improved data collection. Image courtesy of Rachel So 17 Regional offices Imperial County 1405 North Imperial Avenue Suite 1 El Centro, CA 92243 Phone: (760) 353-7800 Fax: (760) 353-1877 Orange County OCTA Building 600 South Main Street Suite 906 Orange, CA 92863 Phone: (714) 542-3687 Fax: (714) 560-5089 Riverside County 3403 10th Street Suite 805 Riverside, CA 92501 Phone: (951) 784-1513 Fax: (951) 784-3925 San Bernardino County Santa Fe Depot 1170 West 3rd Street Suite 140 San Bernardino, CA 92410 Phone: (909) 806-3556 Fax: (909) 806-3572 Ventura County 950 County Square Drive Suite 101 Ventura, CA 93003 Phone: (805) 642-2800 Fax: (805) 642-2260 818 West 7th Street, 12th Floor Los Angeles, CA 90017 Phone: (213) 236-1800 Fax: (213) 236-1825 www.scag.ca.gov please recycle 2347 2012.05.01 18 San Bernardino County Non-Motorized Transportation Plan March 2011 Revised May 6, 2015 Prepared by San Bernardino Associated Governments ~ In collaboration with Local Jurisdictions in San Bernardino County 19 San Bernardino County Non-Motorized Transportation Plan – Chapter 5 5-59 City of Fontana Population 200,974 City Overview Fontana’s history dates back to 1887, when the City’s precursor, the town site of Rosena was located in the City’s present-day downtown. A.B. Miller, an early agricultural landowner who figures prominently in our City’s founding, rededicated Rosena as Fontana in 1913. By the 1930s, the City was largely settled from Baseline to the Santa Fe Railway. From the beginning, the development of Fontana radiated outward from the downtown. The establishment of the Kaiser Steel Mill changed the character of the community from rural to industrial in 1942. The population and intensity of development increased dramatically in the next decade, and consequently, the City incorporated as Fontana in 1952. The City is now home to 190,356 people in an incorporated area encompassing over 36 square miles, with another 16 square miles in its sphere of influence Fontana’s economy has continued to diversify, with steel production playing less of a role since the 1984 closure of Kaiser Steel, and the rise of the trucking and distribution industries. The City is now among the fastest growing communities in the Inland Empire, with residential and commercial development continuing to move northward, due in part to the supply of vacant land there, and the access provided to it by the newly constructed SR-210 freeway and I-15. Land Use In the early 1900s, Fontana was a diversified agricultural community, producing major commodities such as citrus, grain, grapes, poultry, and swine. In 1942, the area began to transition to a more industrial base with the founding of the Kaiser Steel Mill. Today, Fontana is both a bedroom community, with a commuting population of workers, and, due to its suburban location near several major freeway and rail transportation corridors, is also a major Inland Empire hub of warehousing and distribution centers. These uses are located primarily in the City’s southern half, adjacent to the I-10 corridor. There is also some concentration of these uses near Cherry Ave. and Baseline. Heavy industrial areas surround the former Kaiser Steel (now California Steel) within the City’s sphere of influence, and along the I-10 corridor between Valley Blvd and Slover Ave. A range of residential neighborhoods has developed in the City. The established single and multi-family residential neighborhoods and commercial core of Fontana is largely San Bernardino County Non-Motorized Transportation Plan – Chapter 5 5-60 contained between Baseline and Valley Boulevard. Newer residential development is occurring along the northern edge of the City west of the I-15 freeway, and radiating north and south of the SR 210 corridor. A large portion of Fontana, north of the SR 210 still remains to develop as a mix of planned communities and job centers. Nearly one- third of the acreage within the City and its sphere is vacant. Existing Conditions: Fontana’s non-motorized bicycle network has expanded significantly since the last update to the Non-Motorized Transportation Plan. The City is finishing construction on the Pacific Electric Trail, which is scheduled to be complete by June 2011. Once complete, the Pacific Electric Trail will be one continuous Class I trail from Fontana to the Los Angeles County Line. With the completion of the Pacific Electric Trail, 8.86 miles of Class I bikeways will exist in Fontana. The City has striped 27.64 miles of Class II bike lanes, mostly on major transportation corridors throughout the City. There also exists 4.85 miles of Class I facilities. The bike lanes provide connectivity to commercial, residential, educational and recreational amenities throughout the city. Past Investment in Non-Motorized Infrastructure The improvements included in Table 5.34 constitute a significant investment into the non-motorized transportation infrastructure of Fontana. Based on planning level estimates, the value of the improvements implemented throughout the City is $6,232,000. San Bernardino County Non-Motorized Transportation Plan – Chapter 5 5-61 Figure 5.117 San Bernardino County Non-Motorized Transportation Plan – Chapter 5 5-63 Table 5.34: Fontana Existing Conditions Street/Path From To Class Length (mi.) Cost Estimate Augusta Dr. E Sierra Lakes Pkwy. Hacienda Way II 1.01 $50,500 Augusta Dr. W Hacienda Way Sierra Lakes Pkwy. II 1.10 $55,000 Baseline Rd. East Ave. Sierra Ave. II 4.56 $228,000 Beech Ave. Baseline Ave. Miller Ave. II 0.49 $24,500 Beech Ave. Cherry Ave. Baseline Ave. II 2.81 $140,500 Cherry Ave. Beech Ave. Bridlepath Dr. N/Oshawa Dr. II 0.95 $47,500 Cherry Ave. Slover Ave. Jurupa Ave. II 1.01 $50,500 Citrus Ave. s/o Duncan Cnyn Rd. Baseline Ave. II 3.16 $158,000 Cypress Ave. Randall Ave. San Bernardino Ave. II 0.50 $7,500 Duncan Canyon Rd. Bridgepath Dr. N/Oshawa Dr. Lytle Creek Dr. N II 1.03 $51,500 E W Heritage Elem Trail West Heritage Elementary E Yosemite Loop Rd. I 0.13 $130,000 Foothill Blvd. East Ave. Cherry Ave. II 1.48 $74,000 Heritage Circle Trail E Liberty Pkwy. Santa Lucia St. I 0.31 $310,000 Lincoln Loop Rd. Santa Maria Dr. Santa Maria Dr. II 1.42 $71,000 Live Oak Ave. Cherry Ave. Mountain High Dr. II 0.54 $27,000 Mid-East Heritage Trail E Grand Ave. E Lincoln Loop Rd. I 0.30 $300,000 Mid-West Heritage Trail West Heritage Trail W Grand Ave. I 0.41 $410,000 Muirfield Ln. Citrus Ave. Augusta Dr. II 0.07 $3,500 N East Heritage Elementary Trail S Heritage Circle East Heritage Elementary I 0.36 $360,000 N East Heritage Trail W Lincoln Rd. E Lincoln Loop Rd. I 0.15 $150,000 N West Heritage Elem Trail S Heritage Circle West Heritage Elementary I 0.40 $400,000 N West Heritage Trail West Heritage Trail E Yosemite Loop Rd. I 0.19 $190,000 Pacific Electric Trail I-15 Maple Ave. I 6.52 $6,520,000 Patricia Murray Trail Foothill Blvd. W Liberty Pkwy. I 0.52 $520,000 S W Heritage Elem Trail Kings Canyon Court W Liberty Pkwy. I 0.16 $160,000 San Bernardino Ave. Cypress Ave. Juniper Ave. II 0.25 $3,750 San Sevaine Trail Baseline Rd. Foothill Blvd. I 1.14 $1,140,000 San Sevaine Trail Pacific Electric Trail Baseline Ave. I 0.23 $230,000 SCE Utility South Rancherias Rd. Live Oak Ave. I 1.27 $1,270,000 SE E Heritage Elem Trail East Heritage Elementary E Liberty Pkwy. I 0.21 $210,000 SE W Heritage Elem Trail West Heritage Elementary E Yosemite Loop Rd. I 0.09 $90,000 San Bernardino County Non-Motorized Transportation Plan – Chapter 5 5-64 Sierra Ave. S. Highland Ave. Baseline Ave. II 0.83 $41,500 Sierra Lakes Pkwy. Catawba Ave. Sierra Ave. II 1.29 $64,500 Summit Ave. Beech Ave. Sierra Ave. II 2.15 $107,500 SW E Heritage Elem Trail East Heritage Elementary E Liberty Pkwy. I 0.23 $230,000 SW W Heritage Elem Trail West Heritage Elementary McKinley Dr. I 0.07 $70,000 W W Heritage Elementary Trail West Heritage Trail W Liberty Pkwy. | 0.06 $60,000 Walnut St. Citrus Ave. Sierra Ave. II 2.00 $100,000 Walnut St. San Sevaine Rd. Citrus Ave. II 0.29 $14,500 West Heritage Trail S Heritage Circle Crocker Ct. I 0.56 $560,000 Yosemite Loop Rd. McKinley Dr. McKinley Dr. II 1.46 $72,500 Total 41.71 $14,703,250 Proposed Improvements Future improvements to the non-motorized network for the City of Fontana will continue along the major transportation corridors throughout the City. Most of the City’s future improvements focus on additional Class II facilities, but some new Class I and Class III facilities are proposed. A table of future improvements is included in Table 5.35 below. At this time the Fontana does not have a priority list of improvements. When complete, however, the City will have constructed an additional 84.85 miles of Class I, II and III at a total estimated cost of $26,485,550. The proposed improvements will provide a significant upgrade to the density and connectivity of the bicycle network in the City. Additionally, the City of Fontana has not identified any priority improvements as part of this plan. Table 5.35: Fontana Future Improvements Street/Path From To Class Length (mi.) Cost Estimate Alder Ave. Baseline Ave. Randall Ave. III 2.51 $37,650 Alder Ave. Jurupa Ave. SCE Utility South I 0.08 $80,000 Alder Ave. Randall Ave. San Bernardino Ave. II 0.50 $25,000 Arrow Blvd. Almeria Ave. Maple Ave. II 3.15 $157,500 Baseline Ave. Sierra Ave. Maple Ave. II 1.76 $88,000 Beech Ave. Baseline Ave. SCE Utility South II 4.54 $227,000 Ceres Ave. Cypress Ave. Mango Ave. II 0.74 $37,000 Cherry Ave. Baseline Ave. Foothill Blvd. II 1.02 $51,000 Cherry Ave. Foothill Blvd. S City Limit II 0.13 $6,500 Cherry Ave. Jurupa Ave. Live Oak Ave. II 0.54 $27,000 Cherry Ave. N City Limit Baseline Rd. II 1.46 $73,000 Cherry Ave. Valley Blvd. Slover Ave. II 0.50 $25,000 San Bernardino County Non-Motorized Transportation Plan – Chapter 5 5-65 Citrus Ave. Baseline Ave. SCE Utility South II 5.17 $258,500 Citrus Ave. Duncan Canyon Rd. S of SCE Utility North II 0.24 $12,000 Connector Path SCE Utility North Spur Wilson Ave. I 0.49 $490,000 Cypress Ave. Ceres Ave. Santa Ana Ave. II 2.54 $127,000 Dedez Channel Trail SCE Utility South Philadelphia St. I 1.16 $1,160,000 Duncan Canyon Rd. Lytle Creek Rd. N Sierra Ave. II 1.60 $80,000 Fontana Ave. Citrus Ave. Poplar Ave. II 0.70 $35,000 Fontana Ave. Poplar Ave. Lime Ave. II 0.17 $8,500 Foothill Blvd. Cherry Ave. Maple Ave. II 4.78 $239,000 Highland Ave. Sierra Ave. Mango Ave. I 0.31 $15,500 Juniper Baseline San Bernardino III 3.01 $45,150 Jurupa Ave. Sierra Ave. Tamarind Ave. II 0.74 $37,000 Knox Ave. Sierra Lakes Pkwy. SR-210 Drainage II 0.16 $8,000 Live Oak Ave. Mountain High Dr. Long View Dr. II 0.42 $21,000 Live Oak Ave. SCE Utility South Cherry Ave. II 0.53 $26,500 Locust Ave. Jurupa Ave. 11th St. II 0.27 $13,500 Mango Ave. Highland Ave. Baseline Rd. II 1.00 $50,000 Mango Ave. Riverside Ave. Summit Valley Rd. II 1.80 $90,000 Mango Ave. Valencia Ave. Merrill Ave. III 0.37 $5,550 Maple Ave. Baseline Rd. Orange Way II 1.71 $85,500 Merrill Ave. Catawba Ave. Citrus Ave. II 0.24 $12,000 Merrill Ave. Citrus Ave. Alder Ave. III 2.04 $30,600 Merrill Ave. Mango Ave. Alder Ave. III 0.75 $11,250 Miller Ave. Pacific Electric Trail Maple Ave. II 4.30 $215,300 Oleander Ave. Arrow Blvd. Valencia Ave. II 0.12 $6,000 Orange Way Juniper Ave. Mango Ave. II 0.50 $25,000 Philadelphia St. San Sevaine Trail Dedez Channel Trail II 0.88 $44,000 Poplar Ave. Fontana Ave. Beech Ave. II 2.99 $149,500 San Bernardino Ave. Fontana Ave. Alder Ave. II 2.78 $139,000 San Sevaine Rd. SCE Utility North SR-10 Drainage II 0.21 $10,500 San Sevaine Trail Foothill Blvd. S. City Limit I 5.02 $5,020,000 San Sevaine Trail PE Trail Banyan Ave I 3 $3,172,348 Santa Ana Ave. Almond St. Tamarind Ave. II 4.05 $202,500 Santa Ana Ave. San Sevaine Trail Mulberry Ave. II 0.48 $24,000 SCE Utility North Sierra Ave. East Ave. I 6.48 $6,480,000 SCE Utility North Spur I W. City Limit SCE Utility North I 1.66 $1,660,000 SCE Utility North Spur II Lytle Creek Rd. SCE Utility North I 0.62 $620,000 SCE Utility South Citrus Ave. Locust Ave. I 2.63 $2,630,000 SCE Utility South Live Oak Ave. Citrus Ave. I 1.56 $1,560,000 SCE Utility South San Sevaine Trail Rancherias Dr. I 0.80 $800,000 Sierra Ave. Baseline Ave. S. City Limit II 6.05 $302,500 Sierra Ave. Lytle Creek Rd. Sierra Lakes Pkwy. II 3.21 $160,500 Sierra Ave. Sierra Lakes Pkwy. Highland Ave. II 0.42 $21,000 Sierra Lakes Pkwy. Cherry Ave. Lytle Creek Rd. II 1.29 $37,000 Sierra Lakes Pkwy. Lytle Creek Rd. Catawba Ave. II 0.49 $24,500 Sierra Lakes Pkwy. Sierra Ave. Mango Ave. II 0.30 $15,000 Slover Ave. Almond Ave. Cherry Ave. II 0.25 $12,500 Slover Ave. San Sevaine Trail Mulberry Ave. II 0.49 $24,500 Slover Ave. Sierra Ave. Tamarind Ave. II 0.75 $37,500 San Bernardino County Non-Motorized Transportation Plan – Chapter 5 5-66 SR-210 Drainage San Sevaine Rd. Knox Ave. I 0.99 $990,000 Summit Ave. Sierra Ave. Mango Ave. II 0.25 $12,500 Tamarind Ave. Jurupa Ave. SCE Utility South I 0.10 $100,000 Valencia Ave. Oleander Ave. Mango Ave. III 0.99 $14,850 Valley Blvd. Almond Ave. Cherry Ave. II 0.25 $12,500 Victoria St. SCE Utility North Cherry Ave. || 0.28 $14,000 Walnut Ave. Cherry Ave. San Sevaine Rd. II 0.50 $78,500 Walnut Ave. Hemlock Ave. Beech Ave. II 0.25 $12,500 Walnut Village Pkwy. Sierra Ave. Mango Ave. II 0.25 $12,500 Total 102.32 $28,336,698 Table 5.36: Priority Improvements Street/Path From To Class Length (mi.) Cost Estimate n/a n/a n/a n/a n/a n/a Municipal Code Fontana Municipal Code Division 4, Section 30-336(c) provides the following requirements related to pedestrian access and circulation: Section 30-336 (c) 1) Pedestrian a. On-site pedestrian circulation systems shall be provided to meet the movement needs of on-site users. Such systems shall provide safe, all- weather surfaces and aesthetically pleasing means of on-site foot travel. Pedestrian walkways shall be an integrated part of the overall architecture and site design concept. b. Pedestrian and bicycle access shall be conveniently provided to connect surrounding land uses and commercial or mixed uses. c. All new commercial and mixed-use development shall be accessible to persons with disabilities as required elsewhere in Division 4. d. All primary ground-floor common entries and individual dwelling unit entries for mixed-use projects fronting on streets should be oriented to the street, not to the interior or the parking lot. e. On-site pedestrian circulation for mixed-use projects should be continuous and connect various uses on the site, as well as connect to off-site transit stops and parking. Section 30-342 General • All employers shall provide bicycle parking. There shall be no bike parking on sidewalks unless additional area is provided which does not conflict with sidewalk or entryway. Bicycle and parking facilities should be located in an area of the parking lot convenient to destination entrances for employees as well as for San Bernardino County Non-Motorized Transportation Plan – Chapter 5 5-67 patrons. Bicycle parking facilities should be located in highly visible areas to minimize theft and vandalism and should not interfere with pedestrian traffic. Employees with 100 or more employees shall provide shower and locker facilities to encourage non-motorized travel such as bicycling and walking. Cycle parking facilities should be placed on paved surfaces, well lighted and should be protected from potential damage by other vehicle traffic. All motorcycle parking areas shall be paved with concrete to prevent motorcycle kickstands from damaging the pavement and should be clearly identified for motorcycle usage. Section 30-343 Dimensions • Parking racks for bicycles shall be of a size and design which will accommodate the required bicycles. Table 30-343A provides the number of rack by land use type. End of Trip Facilities The City of Fontana has bike racks dispersed throughout the City, typically at retail centers, schools and multi-unit housing complexes. Multimodal Connectivity Table 5.37: Multimodal Connectivity Facility Facility Type Facility Location Fontana Metrolink Station Train Station 16777 Orange Way South Fontana TransCenter Bus Station Sierra/Marigold/Valley City-wide Bus Stops Bus Stops Throughout City Beech PNR Ride Share Lot Beech/SR-210 Victoria TMC PNR Ride Share Lot 13850 Victoria St. Collisions Involving Bicyclists Table 5.38: Data for Collisions Involving Bicyclists Parameter Collision Rate Total # of Bicycle Collisions from 2007-2011 223 Total # of Bicycle Fatalities from 2007-2011 1 Total # of Injuries from 2007-2011 158 Average # of Bicycle Collisions Per Year 44.6 Average Bicycle Collision Rate per 1000/year1 0.23 Notes: 1. Rate is calculated using SWITRS collision data and population figures by the California Department of Finance San Bernardino County Non-Motorized Transportation Plan – Chapter 5 5-68 Safety and Education Programs The City of Fontana participates in the Police Department’s annual Safety Preparedness Fair, which provides bicycle safety training. In addition to the annual event sponsored by the Police Department, the following activities take place on a less regular basis: • The Police Department provides pamphlets available at all events discussing bicycle and pedestrian safety. • The Police Department will occasionally host “Bicycle Rodeos, which includes a large safety element to the program. • The Recreation Department will coordinate bike clubs at the elementary and middle schools whose student populations use the PE Trail to commute to school.