Art3_Rialto_FY15_BikePed_EtiwandaCorridor_ExtRqst_CLOSED City of Rialto,M California August 29, 2018 SBCTA Mr. Cameron Brown Senior Planner 1170 West Third Street, 2"d Floor San Bernardino, CA 92410 Dear Mr. Brown: The City of Rialto is requesting an extension for the Etiwanda Corridor project funding allocations TDA Article 3 fund until 2021. The City is in the process of completing the construction documents; including plans, specification and estimates (PS&E). The construction documents are approximately 85% complete. The project has been through an extensive outreach and acceptance process to ensure community support for the project and to complete the environmental review. The nature of the project required a thorough review by various City departments as well as the City's Economic Development Committee. In the September/October of 2017, the City conducted two community meetings nearby schools to solicit community input prior to advertising the Request for Proposals to select a qualified consultant to prepare the construction documents (PS&E). Additional time was required to complete the consultant selection process following the recently adopted Caltrans Local Assistance Procedure Manual, Chapter 10 requirements and to obtain consultant acceptance approval by Caltrans Headquarters pursuant to Local Assistance Form 10C. The City experienced additional time delay in obtaining Caltrans authorization to proceed with the Preliminary Engineering (PS&E) phase of the project prior to initiation of final design and preparation of construction documents. Should you have any questions regarding this project, please contact Azzam Jabsheh, P.E., Associate Civil Engineer at (909) 820-2525 ext. 2082 or via email at aiabsheh(a-)-rialtoca.gov. Sincerely Rdbert VE senbeisz, P.E. Public Works Director/City Engineer Office of the Public Works Director/City Engineer 335 West Rialto Avenue, Rialto, California 92376