Loading...
Art3_ChinoHills_FY13_Transit_App             City  of  Chino  Hills     SANBAG   Transportation  Development  Act   Transit  Stop  Access  Improvements     Bus  Stop  Pad  Construction  &  ADA   Compliant  Ramp  Installation   Omnitrans  Routes  365  and  65       PREPARED  FOR:   San  Bernardino  Associated  Governments   1170  West  3rd  Street,  2nd  Floor   San  Bernardino,  CA      92410-­‐1715   Attn:  Tim  Byrne     PREPARED  BY:   City  of  Chino  Hills   Engineering  Department   14000  City  Center  Drive   Chino  Hills,  CA    91709   (909)  364-­‐2766       May  8,  2013   City  of  Chino  Hills   Bus  Stop  Pad  Construction  &  ADA  Compliant  Ramp  Installation      1 | Page         1. Application  .............................................................................................................................  1   2. Appendix:     a. Estimate  Detail  .........................................................................................................  7     b. Project  Timeline  ........................................................................................................  8   c. Location  Map  &  Photos  ..........................................................................................  10     d. Omnitrans  Letter  of  Support  ..................................................................................  22                   Table  of  Contents   City  of  Chino  Hills   Bus  Stop  Pad  Construction  &  ADA  Compliant  Ramp  Installation      2 | Page     Biennial  Article  3  20%  Fund   Call  for  Projects  Application  Form   FY  2012-­‐2013  –  FY  2013-­‐2014   1. Priority  #:  01     2. Project  Title:   Bus  Stop  Pad  and  ADA-­‐Compliant  Ramp  Installation     3. Project  Description:    The  proposed  project  includes:     a. Constructing  six  15’  x  8’  bus  stop  pads  at  the  following  locations:  Boys  Republic  at   Peyton  Drive;  Grand  Avenue  at  City  Center  Drive;  Central  Avenue  at  Fairfield  Ranch   Road;  Bird  Farm  Road  at  Monterey  Avenue;  Pipeline  Avenue  at  Gird  Street;  and   Pipeline  Avenue  at  Clubhouse  Way.       b. Constructing  15’  x  8’  bus  stop  pads  and  ADA  ramps  at  the  following  locations:   Pomona  Rincon  Road  and  Picasso  Drive  (pad  +  8  ramps);  Peyton  Drive  and  Bulldog   Boulevard  (pad  +  2  ramps);  Pipeline  Avenue  and  Village  Drive  (pad  +  2  ramps).     c. Constructing  a  15’  x  8’  bus  stop  pad,  ADA  ramp  and  600  square  feet  of  sidewalk  at   Pipeline  Avenue  and  Glen  Ridge  Drive.       d. Constructing  ADA  ramps  only  at  the  following  location:  Pipeline  Avenue  at  Valle  Vista   (2  ramps).     Project  Need:    Before  September  2010,  Omnitrans  in  Chino  Hills  consisted  of  OmniLink,   a  dial-­‐a-­‐ride  system,  and  Route  65,  which  at  the  time  only  served  the  Los  Serranos   neighborhood.  In  September  2010,  Omnitrans  introduced  OmniGo  Route  365  to  Chino   Hills.    OmniGo  Route  365  (commonly  referred  to  as  OmniGo  Chino  Hills)  is  a  community   circulator  that  augmented  and  partially  replaced  the  previous  dial-­‐a-­‐ride  system.   OmniGo  is  a  traditional  fixed-­‐route  service  (bus  stops,  published  route,  published  time   table)  compared  to  OmniLink,  which  was  a  shared  rider  reservation-­‐based  service.   At  the  same  time  that  OmniGo  was  added,  Omnitrans  restructured  one  of  their  regular   routes  (Route  65)  to  serve  the  Chino  Hills  Civic  Center  area  (adjacent  to  the  proposed   project  area)  while  before  it  only  briefly  served  parts  of  Chino  Hills  in  the  Los  Serranos   neighborhood.  Since  September  2010,  64  bus  stops  have  been  added  in  the  City.  Since   its  inception,  OmniGo  (Route  365)  ridership  has  risen  dramatically.  In  FY  2010  Omnilink   and  OmniGo  combined  ridership  was  approximately  12,520.  In  2012  it  had  more  than   tripled,  rising  to  approximately  54,344.  Additionally,  the  routes  in  Chino  Hills  are  heavily   used  by  students,  more  so  than  other  routes  in  the  Omnitrans  system.  The  routes  in   Chino  Hills  have  been  modified  to  add  trippers  to  serve  Chino  Hills  High  School  and   Townsend  Junior  High  in  addition  to  the  routes  the  school  had  already  served  (Ayala   High  School  and  Chaffey  College  Chino  Campus).  Omnitrans  routes  have  seen   City  of  Chino  Hills   Bus  Stop  Pad  Construction  &  ADA  Compliant  Ramp  Installation      3 | Page   tremendous  growth  in  student  ridership  growing,  from  7%  of  ridership  in  FY2007  to   19.8%  in  FY2013.    In  order  to  continue  this  increase  in  ridership,  the  City  of  Chino  Hills  would  like  to  install   bus  stop  pads  at  the  above  noted  11  bus  stops.  Omnitrans  will  then  provide  shelters  and   benches  free  of  charge  to  the  City  (shelters  will  have  advertising).  Providing  bus  stop   pads,  benches  and  shelters  will  make  the  bus  stops  more  accessible  to  riders,  and  will   provide  a  clean  place  to  sit  or  stand,  and  shelter  from  the  sun,  wind  and  rain.  While   many  of  the  bus  stop  locations  are  already  accessible  with  existing  sidewalk  curb  ramps,   new  ADA  regulations  now  require  modified  slopes  and  the  addition  of  truncated  domes   for  easier  accessibility  by  blind  and/or  wheelchair-­‐bound  individuals.    This  project  will   bring  all  11  bus  stop  locations  into  full  ADA  compliance.    These  bus  stops  represent  17%   of  Omnitrans  bus  stops  in  the  City  of  Chino  Hills.         City  of  Chino  Hills   Bus  Stop  Pad  Construction  &  ADA  Compliant  Ramp  Installation      4 | Page            4.            Locations:     Table  1   Project  Improvement  Locations   No.  Location     Easement   Required   ADA   Ramps   15’  x  8’     Bus  Stop  Pad   Sidewalk  Existing   Bus  Stop/   Existing   ROW   1  Boys  Republic  Dr  @  Peyton  Dr                                                                          No  0  1  0  Yes   2  Grand  Ave  @  City  Center  Dr                                                            No  0  1  0 Yes   3  Central  Ave  @  Fairfield  Ranch  Rd                                                      No  0  1  0 Yes   4  Bird  Farm  Rd  @  Monterey  Ave                                                                                          No  0  1  0 Yes   5  Pipeline  Ave  @  Gird  St                                                                                                        No  0  1  0 Yes   6  Pipeline  Ave  @  Clubhouse  Way                                                                                    No  0  1  0 Yes   7  Pomona  Rincon  Rd  @  Picasso  Dr  No 8  1  0 Yes   8  Peyton  Dr  @  Bulldog  Blvd  No 2  1  0 Yes   9  Pipeline  Ave  @  Village  Dr  No 2  1  0 Yes   10  Pipeline  Ave  @  Glen  Ridge  Dr  No 1  1  1  Yes   11  Pipeline  Ave  @  Valle  Vista  Dr  No 2  0  0  Yes    TOTAL  ADA  RAMPS:    15          TOTAL  BUS  STOP  PADS:      10        TOTAL  SIDEWALKS        1         5. Project  Cost  Estimate  (See  Appendix  A  for  detail  &  Cost  Effectiveness):            $82,180       6.  Non-­‐TDA  Article  3  Project  Matching  Funds:            $24,655  (30%)       Source:          Local  Funds                  7.    Requested  Article  3  TDA  Call  for  Project  Funds:          $57,525         City  of  Chino  Hills   Bus  Stop  Pad  Construction  &  ADA  Compliant  Ramp  Installation      5 | Page     8.  Location  Characteristics:     Table  2   Location  Characteristics   No.  Location  Bus   Routes   Serving   Location   Number   of     Daily   Buses   Serving     Location   Daily   Boardings   &   Alightings   Anticipated   ADA  Cost   Savings   1  Boys  Republic  Dr  @  Peyton  Dr                                                                              65  &  365  35  3  $500   2  Grand  Ave  @  City  Center  Dr                                                            65  18  58  $10,200   3  Central  Ave  @  Fairfield  Ranch  Rd                                365  17  9  $1,600   4  Bird  Farm  Rd  @  Monterey  Ave                                                                                            365  17  7  $1,200   5  Pipeline  Ave  @  Gird  St                                                                                                        365  17  16  $2,800   6  Pipeline  Ave  @  Clubhouse  Way                                                                                        365 17  2  $400   7  Pomona  Rincon  Rd  @  Picasso  Dr  365 2  57  $10,000   8  Peyton  Dr  @  Bulldog  Blvd  365 17  5  $900   9  Pipeline  Ave  @  Village  Dr  365 17  9  $1,600   10  Pipeline  Ave  @  Glen  Ridge  Dr  365 17  0  0   11  Pipeline  Ave  @  Valle  Vista  Dr  365 17  2  $400    Totals      163  $29,600     9.  Relationship  to  2011  NMTP  (Non-­‐Motorized  Transportation  Plan)  projects,  if  any:      The   ADA  ramp  improvements  will  be  conducted  at  several  locations  that  are  part  of,  or   connect  to,  the  2011  NMTP  City  of  Chino  Hills  Local  Jurisdiction  Plan  (Pg  5-­‐29  of  2011   NMTP).    Specifically,  improvements  will  connect  in  with  the  City’s  Class  II  bike   infrastructure  plan  at  Fairfield  Ranch  Road,  Peyton  Drive,  and  Pipeline  Avenue.     10.  Listing  of  Generators  and  Attractors  Served:   The  primary  generators  and  attractors  for  the  11  bus  stops  on  this  route  are  as  follows:     The  Shoppes  at  Chino  Hills  (with  over  100  retail  and  restaurant  establishments);  U.S.   Post  Office;  Civic  Center;  City  Hall;  Chino  Hills  Police  Department;  Chino  Hills  Finance   Department;  Chino  Hills  Library;  a  variety  of  churches;  Chino  Hills  High  School;  Ruben  S.   Ayala  High  School;  Chaparral  Elementary  School;  Glenmeade  Elementary  School;   Glenmeade  Park;  Fairfield  Ranch  Park;  Chino  Hills  Skate  Park;  Hickory  Creek  Park;   Cinnamon  Park;  Lake  Los  Serranos  Club;  Woodview  Plaza;  U.S.  Health  Works  Medical   Group;  Roettele  Industries;  Barnes  and  Noble;  and  Wells  Fargo  Bank.       11.  Schedule  for  Project  Completion  (See  Appendix  B).       12.   Photos  (See  Appendix  C).   City  of  Chino  Hills   Bus  Stop  Pad  Construction  &  ADA  Compliant  Ramp  Installation      6 | Page     13.    Omnitrans  Letter  of  Support  (see  Appendix  D).       City  of  Chino  Hills   Bus  Stop  Pad  Construction  &  ADA  Compliant  Ramp  Installation      7 | Page     Appendix  A:  Estimate  Detail       Table  3   Estimate  Detail   Description  Qty  Unit  Unit   Cost   Grant  Request    Match  Total   ADA  Ramps  15  EA  $2,500  $26,250  $11,250  $37,500   15’  x  8’  Bus  Stop  Pads  10  EA  $1,800  $12,600  $5,400  $18,000   4-­‐in  PCC  Sidewalk  600  SF  $5.33  $2,240  $960  $3,200   Sub  Total              $41,090  $17,610  $58,700                 Contingency  10%  $5,870    $4,109  $1,761  $5,870   Environmental  N/A             Survey               Engineering/Design  15%  $8,805    $6,163  $2,642  $8,805   Project  Management  5%  $2,935    $2,054  $881  $2,935   Inspection  10%  $4,109    $4,109  $1,761  $5,870   Sub  Total              $16,435  $7,045  $23,480   Project  Total        $57,525  $24,655  $82,180   Percentage        70%  30%  100%         City  of  Chino  Hills   Bus  Stop  Pad  Construction  &  ADA  Compliant  Ramp  Installation      8 | Page     Cost  Effectiveness:  Since  the  bus  runs  on  a  regular  schedule  it  is  much  more  convenient  and   flexible  for  persons  with  disabilities  than  paratransit  services.    Based  on  formulas  created  by   Omnitrans  we  have  been  able  to  calculate  that  paratransit  cost  avoidance  is  estimated  to  be   $29,600.    Overall  cost  effectiveness  of  the  project  based  on  Boardings/Alightings  stands  at  $504   per  person.         Boardings/Alightings     Total  Project  Cost:  $82,180       Divided  by       Total  Boardings/Alightings:  163  persons       Cost  Effectiveness:  $504  per  person         Appendix  B:  Project  Timeline       All  project  activities  are  expected  to  be  complete  within  eight  months  of  the  grant-­‐award  date.     Project  Timeline     No.  Activities  Completed  By  Responsible  Party   1.  Grant  Awarded  September  2013  SANBAG   2.  Environmental  Survey     (City  has  filed  CEQA  Notice  of   Exemption)   Completed  Chino  Hills   3.  Amend  Capital  Improvement  Plan   (amendment  by  City  Council)   September/October   2013   Chino  Hills   4.  Design/Engineering  October/November   2013  (one  month)   Chino  Hills   5.  Prepare  Bid   Package/Solicitation/Award   December/January   2013/2014   Chino  Hills   6.  Construction  February  2014– April  2014   Chino  Hills   7.  Project  Closeout  April  2014  SANBAG/Chino  Hills     City  of  Chino  Hills   Bus  Stop  Pad  Construction  &  ADA  Compliant  Ramp  Installation      9 | Page     Timeliness  of  Prior  Project  Completion:         The  City  of  Chino  Hills  Engineering  Division  has  a  demonstrated  capacity  to  manage  projects   that  require  following  FHWA  and  Caltrans  Local  Assistance  procedures  as  noted  below:     ü $35,000  from  SANBAG,  TDA  Article  3.    These  funds  were  awarded  to  Chino  Hills  in  2007   to  demarcate  bicycle  lanes  through  striping,  stenciling  and  signage  on  Grand  Avenue   and  Chino  Hills  Parkway.    Construction  began  on  Grand  Avenue  July  2008  and  was   successfully  completed  October  2008.    Construction  began  on  Chino  Hills  Parkway   March  2009  and  was  successfully  completed  April  2009.   ü $51,591  from  SANBAG,  TDA  Article  3.    These  funds  were  awarded  to  Chino  Hills  in  2011   to  replace  or  install  28  sidewalk  curb  ramps  at  exiting  Omnitrans  bus  stop  locations.    The   project  also  included  constructing  curb  and  gutter  improvements  and  sidewalks.  This   project  was  completed  on  time  in  the  Summer  of  2012.     ü $216,800  from  the  Environmental  Protection  Agency’s  State  and  Tribal  Assistance   Grant  Program.    These  funds  were  awarded  in  August  2004.    The  funds  were  awarded   for  storm  water  infrastructure  design  on  the  English  Channel.    The  last  invoice  for   reimbursement  was  dated  April  10,  2010.   ü $5.628  million  from  the  Federal  Highway  Administration.    These  funds  were  awarded   within  the  High  Priority  Projects  category  in  the  reauthorization  of  the  national   transportation  bill  entitled  SAFETEA-­‐LU.    The  City  is  using  the  funds  for  the  Peyton  Drive   Widening  project.    Construction  is  expected  to  begin  in  early  September  2013.         The  City  has  a  full-­‐service  Engineering  Division  that  includes  a  department  devoted  to  capital   improvements  and  land  development  projects.    The  department  is  staffed  by  the  City  Engineer,   Assistant  City  Engineer,  two  Assistant/Associate  Engineers,  one  Engineering  Technician,  and   one  Administrative  Technician.               City  of  Chino  Hills   Bus  Stop  Pad  Construction  &  ADA  Compliant  Ramp  Installation      10 | Page     Appendix  C  –  Location  Map  &  Photos       Figure  1   Bus  Stop  Location  Map               New  bus  stop  pads  will  be  installed  at  11  bus  stop  locations  along  the  Omnitrans  365  and  65   routes.  New  ADA-­‐compliant  ramps  will  be  replaced  or  installed  at  five  of  those  bus  stop   locations.  Additionally,  a  new  sidewalk  will  be  constructed  at  one  bus  stop  location.  Cross   reference  with  Table  1.   City  of  Chino  Hills   Bus  Stop  Pad  Construction  &  ADA  Compliant  Ramp  Installation      11 | Page        Boys  Republic  @  Peyton  Drive–  One  15’  x  8’  bus  stop  pad  will  be  constructed.   City  of  Chino  Hills   Bus  Stop  Pad  Construction  &  ADA  Compliant  Ramp  Installation      12 | Page       Grand  Avenue  @  City  Center  Drive  –  One  15’  x  8’  bus  stop  pad  will  be  constructed.   City  of  Chino  Hills   Bus  Stop  Pad  Construction  &  ADA  Compliant  Ramp  Installation      13 | Page       Central  Avenue  @  Fairfield  Ranch  Road  –  One  15’  x  8’  bus  stop  pad  will  be  constructed.   City  of  Chino  Hills   Bus  Stop  Pad  Construction  &  ADA  Compliant  Ramp  Installation      14 | Page       Bird  Farm  Road  @  Monterey  Avenue  —  One  15’  x  8’  bus  stop  pad  will  be  constructed.     City  of  Chino  Hills   Bus  Stop  Pad  Construction  &  ADA  Compliant  Ramp  Installation      15 | Page       Pipeline  Avenue  @  Gird  Street  –  One  15’  x  8’  bus  stop  pad  will  be  constructed.   City  of  Chino  Hills   Bus  Stop  Pad  Construction  &  ADA  Compliant  Ramp  Installation      16 | Page        Pipeline  Avenue  @  Clubhouse  Way  –  One  15’  x  8’  bus  stop  pad  will  be  constructed.   .   City  of  Chino  Hills   Bus  Stop  Pad  Construction  &  ADA  Compliant  Ramp  Installation      17 | Page       Pomona  Rincon  Road  @  Picasso  Drive  –  One  15’  x  8’  bus  stop  pad  will  be  constructed  and   eight  non-­‐ADA-­‐compliant  ramps  will  be  replaced.   City  of  Chino  Hills   Bus  Stop  Pad  Construction  &  ADA  Compliant  Ramp  Installation      18 | Page                                                                                     Peyton  Drive  @  Bulldog  Boulevard–  One  15’  x  8’  bus  stop  pad  will  be  constructed  and  two   non-­‐ADA-­‐compliant  ramps  will  be  replaced.   City  of  Chino  Hills   Bus  Stop  Pad  Construction  &  ADA  Compliant  Ramp  Installation      19 | Page                                               Pipeline  Avenue  @  Village  Drive–  One  15’  x  8’  bus  stop  pad  will  be  constructed  and  two  non-­‐ ADA-­‐compliant  ramps  will  be  replaced.   City  of  Chino  Hills   Bus  Stop  Pad  Construction  &  ADA  Compliant  Ramp  Installation      20 | Page                                                   Pipeline  Avenue  @  Glen  Ridge  Drive  –  One  non-­‐ADA  -­‐compliant  ramp  will  be  replaced.  A  15’  x   8’  bus  stop  pad  will  be  constructed,  along  with  a  600  square  foot  4-­‐inch  PCC  sidewalk.   City  of  Chino  Hills   Bus  Stop  Pad  Construction  &  ADA  Compliant  Ramp  Installation      21 | Page                                                                                     Pipeline  Avenue  @  Valle  Vista  Drive–  Two  non-­‐ADA-­‐compliant  ramps  will  be  replaced.   City  of  Chino  Hills   Bus  Stop  Pad  Construction  &  ADA  Compliant  Ramp  Installation      22 | Page   Appendix  D:    Letter  of  Support