Loading...
Art3_Redlands_FY13_BikePed_OBTIII_Inv16_230726_CLOSED City of REDLANDS Incorporated 1888 Municipal Utilities & Engineering Department 35 Cajon Street, Suite 15A Redlands, CA 92373 909-798-7698 July 25, 2023 Ginger Koblasz San Bernardino County Transportation Authority 1170 W. 3rd Street, 2nd Floor San Bernardino, CA 92410-1715 ORANGE BLOSSOM TRAIL PHASE III PROGRESS PAYMENT REQUEST #15 Ms. Koblasz, City of Redlands submits to San Bernardino County Transportation Authority (SBCTA) progress payment request #16 for Phase III of the Orange Blossom Trail. City Resolution No. 7299, adopted on July 16, 2013, accepted Transportation Development Act Article 3 grant funding in the amount of $918,722.00 and allocated $162,128.00 of City’s Palmetto Grove Fund to be used as the grant match. Progress payment request #16 is in the amount of $296,420.46. Attached are the following documents for your review and processing: 1. Reimbursement Request 2. Backup Documentation 3. Backup Summary 4. Photos of Completed Project 5. Certification of Completion If you have any questions, please contact me at 909-798-7584 Ext. 4. Sincerely, Gerard Nepomuceno Civil Engineer JOHN R. HARRIS Director City of Redlands Date:7/25/2023 Please see below instructions and checkmark the items included in your submittal. 1. 2. 3. 4. 5. 6. 7.Photos of Completed Project (completed projects only) – required when project is complete and should be attached to final reimbursement request. Award is for an ATP Safe Routes to School (SRTS) program project, not a SRTS infrastructure project. Necessary staff time directly related to in-house completion of design, right-of-way acquisition, or construction including inspection and/or construction management. Note: No travel costs or per diems allowed for staff time Backup Summary itemizing reimbursement request expenses. Certification of Completion (completed projects only) – prior to filing the final request for reimbursement, written verification of project completion by the agency’s Authorized Agent is required (see Authorizing resolution above). Sample language is available upon request. Claimant: Authorizing Resolution (one-time submission) – required within SIX months of the project award by SBCTA Board or prior to requesting reimbursement of funds, whichever comes first. Resolution should authorize the filing of the claim form, authorize the submission of reimbursement requests and designate the individuals authorized to certify project completion (Authorized Agent). Sample language is available upon request. Claim Form (one-time submission) – required prior to, or along with, your first reimbursement request. Reimbursement Request Form (as needed) – this form is required every time a reimbursement is requested. Please note, progressive payments are only eligible on awards over $200,000 and local match share percentage must be met regardless of reimbursement amount requested. Backup Documentation (required with Reimbursement Request Form) – invoices, paychecks, purchase orders, etc. to support both the reimbursement and match amounts noted on the Reimbursement Request Form. Please note, staff administration and/or contract project management expenses are NOT eligible match expenses. However, staff expenses may qualify for local match under select circumstances. Please identify whether supporting documentation includes staff expenses under one of the following allowable conditions: Project Title: Date Recipient's Name Brief Description of Purchase Amount (include proof of payment) 3/14/23 Deark E&C Inc Construction - Check # 225853 150,018.30$ 4/28/23 Deark E&C Inc Construction - Check #227764 159,592.40$ 5/30/23 Deark E&C Inc Construction - Check #228457 39,119.80$ 348,730.50$ Orange Blossom Trail Phase 3 Total VENDOR NUMBER VENDOR NAME INVOICEAMOUNTINVOICE DATE INVOICENUMBER DESCRIPTION PO#: MP Pay To The Order Of Vendor Number 225853 04/06/2023 $150,018.30 CHECK NUMBER CHECK DATE CHECK AMOUNT 200982 DEARK E&C INC 03/14/2023 6 ORANGE BLOSSOM TRAIL PHASE III PROJECT S241001 $150,018.30 22212412 - MUNICIPAL UTIL & ENGINEERING VOID IF NOT CASHED WITHIN SIX MONTHS Union Bank, N.A., 1980 Saturn Street, Monterey Park, CA 91755 90-4150/1222 | 9080000828 VOID CITYOFREDLANDSCITYOFREDLANDSCITYOFREDLANDSCITYOFREDLANDSCITYOFREDLANDSCITYOFREDLANDSCITYOFREDLANDSCITYOFREDLANDSCITYOFREDLANDSCITYOFREDLANDSCITYOFREDLANDSCITYOFREDL… City Treasurer P.O. Box 3005 Redlands, CA 92373 200982 Check Number 225853 Check Date 04/06/2023 DEARK E&C INC1830 W 147TH STGARDENA, CA 90249 $150,018.30*** One Hundred And Fifty Thousand And Eighteen Dollars And Thirty Cents *** PAGE:1 OF 1 APPLICATION AND CERTIFICATE FOR PAYMENT City of Redlands 35 Cajon St Redlands, CA 92373 PROGRESS PAYMENT [ X ]FINAL PAYMENT [ ]FIRST AND FINAL PAYMENT [ ]RETENTION PAYMENT [ ] CONTRACTOR Deark E&C, Inc.PROJECT TITLE Orange Blossom Trail Phase 3 ADDRESS 1830 W 147th Street, Gardena, CA 90249 PROJECT NUMBER S241001 BID NO. / JOB NO. S241001 PHONE NUMBER (424) 344-2380 EMAIL djin@dearkec.com CLERKS DOC NUMBER OA NUMBER CONTACT NAME Dong K Jin PURCHASE ORDER NUMBER 22212412 VENDOR NUMBER 200982 CONTRACT SUMMARY Original Contract Amount: $782,396.00 Approved Change Orders: $0.00 Approved Contract Amendments: $0.00 Current Contract Amount: $782,396.00 Original Contract Completion Date: 04-04-2023 Additional Days Per Change Order: 0 days Current Contract Completion Date: 04-15-2023 Payment Information this Period Cumulative Payment Information 1. Payment Application Number P 6 9. Original Contract Work Completed to Date $614,404.00 2. Payment Period Beginning Date 02/01/2023 10. Change Order Work Completed to Date $0.00 3. Payment Period Ending Date 02/28/2023 11. Contract Amendment Work Completed to Date $0.00 4. Total Amount Requested this Pay Period $157,914.00 12. Total Work Completed to Date (sum lines 9+10+11)$614,404.00 5. Less Retention $7,895.70 13. Total Retention Held to Date $30,720.20 6. Current Payment Due $150,018.30 14. Total Work to Date, Less Retention (line 12 minus Line 13)$583,683.80 7. Balance to Finish $167,992.00 15. Less Previous Certificates for Payment $433,665.50 8. Percentage Paid to Date, Including this Period 78.5 16. Current Due this Payment Request (Line 14 minus Line 15)$150,018.30 Certification Approved For Processing Submitted and Agreed to By:Inspector: Frannie Fox, Mar 15 2023 10:30 AM I certify that to the best of my knowledge and belief, all items of work for which payment is being requested have been completed in accordance with the terms of the contract, and that no part of the amount requested has been received. Project Manager: Gerard Nepomuceno, Mar 15 2023 10:39 AM Sean Lee, Accountant | Mar 14 2023 12:28 pm City Engineer: Goutam Dobey, Mar 16 2023 09:53 AM Payment Application Report: Payment Number P 6 Payment Date From: 02-01-2023 To: 02-28-2023 Payment Total: 157,914.00 Item #Description Unit of Measure Original Bid Quantity Current Bid Quantity Previous Pay Pending/Approved Qty this Period Unit Cost Total Cost Percent Complete 1 Mobilization LS 1 1 0 / 1 0.00 $37,000.00 $0.00 100.0 2 Erosion Control Plan LS 1 1 0 / 1 0.00 $8,000.00 $0.00 100.0 3 Traffic Control Plan LS 1 1 0 / 1 0.00 $16,500.00 $0.00 100.0 4 Construction Surveying LS 1 1 0 / 1 0.00 $8,200.00 $0.00 100.0 5 Clearing and Grubbing LS 1 1 0 / 1 0.00 $8,200.00 $0.00 100.0 6 Grading LS 1 1 0 / 1 0.00 $24,000.00 $0.00 100.0 7 4-inch Asphalt Concrete Pavement Over 12-inch Native SF 22896 22896 0 / 0 22,896.00 $5.50 $125928.00 100.0 8 Bike Trail Signage, Striping, and Markings LS 1 1 0 / 0 0.00 $19,000.00 $0.00 0.0 9 30-inch X 30-inch Inlet Grate EA 1 1 0 / 1 0.00 $8,000.00 $0.00 100.0 10 Three Rail PVC Fence LF 2488 2488 0 / 2488 0.00 $32.00 $0.00 100.0 11 Decorative Concrete SF 4091 4091 0 / 1200 1,200.00 $12.00 $14400.00 58.7 12 Adjust Manhole EA 2 2 0 / 0 0.00 $2,000.00 $0.00 0.0 13 Truncated Domes SF 270 270 0 / 0 0.00 $60.00 $0.00 0.0 14 Construct ADA Curb Ramps Type 1 EA 4 4 0 / 2 0.00 $2,000.00 $0.00 50.0 15 Construct ADA Curb Ramps Type 1A EA 1 1 0 / 1 0.00 $8,000.00 $0.00 100.0 16 Grind and Overlay Variable Thickness Pavement SF 4904 4904 0 / 2500 2,404.00 $3.00 $7212.00 100.0 17 Overlay variable thickness pavement SF 108 108 0 / 0 108.00 $36.00 $3888.00 100.0 18 4-Inch Concrete Side Walk SF 585 585 0 / 350 235.00 $14.00 $3290.00 100.0 19 6-Inch Concrete curb gutter LF 117 117 0 / 70 47.00 $68.00 $3196.00 100.0 20 Install 24-Inch RCP LF 33 33 0 / 33 0.00 $500.00 $0.00 100.0 21 Grouted Rip-Rap CY 14 14 0 / 12.5 0.00 $800.00 $0.00 89.3 22 Tubular Steel Gate EA 4 4 0 / 0 0.00 $1,000.00 $0.00 0.0 23 Precast Concrete Litter Receptacle EA 2 2 0 / 2 0.00 $2,000.00 $0.00 100.0 24 6-Inch Mow Curb LF 4956 4956 0 / 4956 0.00 $8.50 $0.00 100.0 25 Street Crossing Monument Sign EA 3 3 0 / 1 0.00 $8,200.00 $0.00 33.3 26 Trail Head Monument Sign EA 1 1 0 / 0.5 0.00 $16,500.00 $0.00 50.0 27 Install 4-Inch atrium drain EA 1 1 0 / 1 0.00 $1,650.00 $0.00 100.0 28 Install 4-Inch PVC pipe EA 7 7 0 / 7 0.00 $600.00 $0.00 100.0 29 "No Dumping Drains to Ocean" stencil.EA 2 2 0 / 2 0.00 $2,000.00 $0.00 100.0 30 Bio Retention Basin LF 155 155 0 / 155 0.00 $200.00 $0.00 100.0 31 Concrete Swale LF 2478 2478 0 / 2478 0.00 $11.00 $0.00 100.0 32 Concrete Island SF 300 300 0 / 0 0.00 $38.00 $0.00 0.0 33 Warning Sign EA 12 12 0 / 0 0.00 $660.00 $0.00 0.0 34 Install No Left Turn EA 1 1 0 / 0 0.00 $1,600.00 $0.00 0.0 35 Install Reflective Delineator Type E LS 26 26 0 / 0 0.00 $300.00 $0.00 0.0 36 Paint Yellow Thermoplastic Striping LF 384 384 0 / 0 0.00 $20.00 $0.00 0.0 37 Trench Drain LF 12 12 0 / 12 0.00 $340.00 $0.00 100.0 38 Precast Removable Bollard EA 11 11 0 / 8.5 0.00 $1,400.00 $0.00 77.3 39 Unforeseen Work LS 1 1 0 / 0.67 0.00 $75,000.00 $0.00 67.0 40 Demobilization LS 1 1 0 / 0 0.00 $10,000.00 $0.00 0.0 APPLICATION AND CERTIFICATE FOR PAYMENT AIA DOCUMENT G702 TO (OWNER):City of Redlands PROJECT:APPLICATION NO:6 Distribution to: 35 Cajon St #200 Orange Blossom Trail Phase 3 Redlands, CA 92373 PERIOD TO:2/1/23 - 2/28/23 FROM:DEARK E&C, INC VIA (ARCHITECT): (CONTRACTOR)1830 W. 147th St PROJECT NO:S241001 Gardena, CA 90249 Deark Project No:PG 22-1 CONTRACT DATE:06/20/22 CONTRACTOR'S APPLICATION FOR PAYMENT Application is made for Payment, as shown below, in connection with the Contract. Continuation Sheet, AIA Document G703, is attached CHANGE ORDER SUMMARY 1. ORIGINAL CONTRACT SUM ........................................................$782,396.00 Change Orders approved in previous months by ADDITIONS DEDUCTIONS 2. Net change by Change Orders .....................................................................................$0.00 the Owner 3. CONTRACT SUM TO DATE (Line 1+2) $782,396.00 Approved this Month 4. TOTAL COMPLETED & STORED TO DATE ........................................................$614,404.00 Number Date Approved (Column G on G703) $0.00 5. RETAINAGE a. 5% of Completed Work (Column D+E on G703)$30,720.20 b. 5% of Stored Material (Column F on G703)$0.00 Total Retainage (Line 5a + 5b or Total in Column I of G703)$30,720.20 6. TOTAL EARNED LESS RETAINAGE ..................................................$583,683.80 (Line 4 less Line 5 Total) TOTALS $0.00 $0.00 7. LESS PREVIOUS CERTIFICATES FOR Net change by Change Orders PAYMENT (Line 6 from prior Certificate)..................................................$433,665.50 The undersigned Contractor certifies that to the best of the Contractor's knowledge, information 8. CURRENT PAYMENT DUE ....................................................................$150,018.30 and belief the Work covered by this Application for Payment has been completed in accordance 9. BALANCE TO FINISH, PLUS RETAINAGE $198,712.20 with the Contract Documents, that all amounts have been paid by the Contractor for Work for (Line 3 less Line 6) which previous Certificates for Payment were issued and payments received from the Owner, State of: California County of: Los Angeles and that current payment shown herein is now due. CONTRACTOR:Deark E&C, Inc Subscribed and sworn to before me this day of 2022 Notary Public: My Commission expires: By:Date:03/14/23 Sean Lee AMOUNT CERTIFIED (Attach explanation if amount certified differs from the amount applied for.) ARCHITECT: ARCHITECT'S CERTIFICATE FOR PAYMENT In accordance with the Contract Documents, based on on-site observations and the data comprising By: Date: the above application, the Architect certifies to the Owner that to the best of the Architect's knowledge, This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the information and belief the Work has progressed as indicated, the quality of the Work is in accordance Contractor named herein. Issuance, payment and acceptance of payment are without with the Contract Documents, and the Contractor is entitled to payment of AMOUNT CERTIFIED prejudice to any rights of the Owner or Contractor under this Contract. Sean Lee CONTINUATION SHEET AIA DOCUMENT G703 AIA DOCUMENT G703, APPLICATION AND CERTIFICATE FOR PAYMENT, containing APPLICATION NUMBER:6 Contractor's signed Certificate is attached APPLICATION DATE:3/14/2023 In tabulations below, amounts are stated to the nearest dollar.PERIOD TO:2/1/2023 ~ 2/28/2023 Use Column I on contracts where variable retainage for line items may apply. ARCHITECTS PROJ NO: A B B-1 B-2 C C.1 C.2 D E E.1 F G H I Item Description of Work Quantity Unit Scheduled Approved Current Completed Total % Balance Retainage No. Value Change Contract From Previous This Period Quantity Quantity Completed (G/C) to Finish Orders Amount Application this period to Date and Stored (C - G) to Date (C+C1) (D +E) to Date WORK COMPLETED 1 Mobilization 1 LS 37,000.00$ 37,000.00$ 37,000.00 -$ 1.00 37,000.00$ 100.00% -$ 1,850.00$ 2 Erosion control plan 1 LS 8,000.00$ 8,000.00$ 8,000.00 -$ 1.00 8,000.00$ 100.00% -$ 400.00$ 3 Traffic control plan 1 LS 16,500.00$ 16,500.00$ 16,500.00 -$ 1.00 16,500.00$ 100.00% -$ 825.00$ 4 Construction surveying 1 LS 8,200.00$ 8,200.00$ 8,200.00 -$ 1.00 8,200.00$ 100.00% -$ 410.00$ 5 Clearing and grubbing 1 LS 8,200.00$ 8,200.00$ 8,200.00 -$ 1.00 8,200.00$ 100.00% -$ 410.00$ 6 Grading 1 LS 24,000.00$ 24,000.00$ 24,000.00 -$ 1.00 24,000.00$ 100.00% -$ 1,200.00$ 7 4-inch asphalt concrete pavement over 12- inch native 22,896 SF 125,928.00$ 125,928.00$ 125,928.00$ 22896.00 1.00 125,928.00$ 100.00% -$ 6,296.40$ 8 Bike trail signage, striping, and markings 1 LS 19,000.00$ 19,000.00$ -$ 0.00 -$ 0.00% 19,000.00$ -$ 9 30-inch x 30-inch inlet grate 1 EA 8,000.00$ 8,000.00$ 8,000.00 -$ 1.00 8,000.00$ 100.00% -$ 400.00$ 10 Tree rail PVC fence 2,488 LF 79,616.00$ 79,616.00$ 79,616.00 -$ 1.00 79,616.00$ 100.00% -$ 3,980.80$ 11 Decorative concrete 4,091 SF 49,092.00$ 49,092.00$ 14,400.00 14,400.00$ 1200.00 0.59 28,800.00$ 58.67% 20,292.00$ 1,440.00$ 12 Adjust manhole 2 EA 4,000.00$ 4,000.00$ -$ 0.00 -$ 0.00% 4,000.00$ -$ 13 Truncated domes 270 SF 16,200.00$ 16,200.00$ -$ 0.00 -$ 0.00% 16,200.00$ -$ 14 Construct ADA curb rmaps Type 1 4 EA 8,000.00$ 8,000.00$ 4,000.00 -$ 0.50 4,000.00$ 50.00% 4,000.00$ 200.00$ 15 Construct ADA curb ramps Type 2 1 EA 8,000.00$ 8,000.00$ 8,000.00 -$ 1.00 8,000.00$ 100.00% -$ 400.00$ 16 Grind and overlay variable thickness pavement 4,904 SF 14,712.00$ 14,712.00$ 7,500.00 7,212.00$ 2404.00 1.00 14,712.00$ 100.00% -$ 735.60$ 17 Overlay variable thickness pavement 108 SF 3,888.00$ 3,888.00$ 3,888.00$ 108.00 1.00 3,888.00$ 100.00% -$ 194.40$ 18 4-inch concrete side walk 585 SF 8,190.00$ 8,190.00$ 4,900.00 3,290.00$ 235.00 1.00 8,190.00$ 100.00% -$ 409.50$ 19 6-inch concrete curb gutter 117 LF 7,956.00$ 7,956.00$ 4,760.00 3,196.00$ 47.00 1.00 7,956.00$ 100.00% -$ 397.80$ 20 Install 24-inch RCP 33 LF 16,500.00$ 16,500.00$ 16,500.00 -$ 1.00 16,500.00$ 100.00% -$ 825.00$ 21 Grouted Rip-Rap 14 CY 11,200.00$ 11,200.00$ 10,000.00 0.89 10,000.00$ 89.29% 1,200.00$ 500.00$ 22 Tubular steel gate 4 EA 4,000.00$ 4,000.00$ -$ 0.00 -$ 0.00% 4,000.00$ -$ 23 Precast concrete litter receptacle 2 EA 4,000.00$ 4,000.00$ 4,000.00 -$ 1.00 4,000.00$ 100.00% -$ 200.00$ 24 6-inch mow curb 4956 LF 42,126.00$ 42,126.00$ 42,126.00 -$ 1.00 42,126.00$ 100.00% -$ 2,106.30$ 25 Street crossing monument sign 3 EA 24,600.00$ 24,600.00$ 8,200.00 -$ 0.33 8,200.00$ 33.33% 16,400.00$ 410.00$ 26 Trail head mounment sign 1 EA 16,500.00$ 16,500.00$ 8,250.00 -$ 0.50 8,250.00$ 50.00% 8,250.00$ 412.50$ 27 Install 4-inch atrium drain 1 EA 1,650.00$ 1,650.00$ 1,650.00 -$ 1.00 1,650.00$ 100.00% -$ 82.50$ 28 Install 4-inch PVC pipe 7 EA 4,200.00$ 4,200.00$ 4,200.00 -$ 1.00 4,200.00$ 100.00% -$ 210.00$ 29 "No dumping drains to Ocean" stencil 2 EA 4,000.00$ 4,000.00$ 4,000.00 -$ 1.00 4,000.00$ 100.00% -$ 200.00$ 30 Bio retintion basin 155 LF 31,000.00$ 31,000.00$ 31,000.00 -$ 1.00 31,000.00$ 100.00% -$ 1,550.00$ 31 Concrete swale 2478 LF 27,258.00$ 27,258.00$ 27,258.00 -$ 1.00 27,258.00$ 100.00% -$ 1,362.90$ 32 Concrete island 300 SF 11,400.00$ 11,400.00$ -$ 0.00 -$ 0.00% 11,400.00$ -$ 33 Warning sign 12 EA 7,920.00$ 7,920.00$ -$ 0.00 -$ 0.00% 7,920.00$ -$ 34 Install no left turn 1 EA 1,600.00$ 1,600.00$ -$ 0.00 -$ 0.00% 1,600.00$ -$ 35 Install reflective delineator Type E 26 EA 7,800.00$ 7,800.00$ -$ 0.00 -$ 0.00% 7,800.00$ -$ CONTINUATION SHEET AIA DOCUMENT G703 AIA DOCUMENT G703, APPLICATION AND CERTIFICATE FOR PAYMENT, containing APPLICATION NUMBER:6 Contractor's signed Certificate is attached APPLICATION DATE:3/14/2023 In tabulations below, amounts are stated to the nearest dollar.PERIOD TO:2/1/2023 ~ 2/28/2023 Use Column I on contracts where variable retainage for line items may apply. ARCHITECTS PROJ NO: A B B-1 B-2 C C.1 C.2 D E E.1 F G H I Item Description of Work Quantity Unit Scheduled Approved Current Completed Total % Balance Retainage No. Value Change Contract From Previous This Period Quantity Quantity Completed (G/C) to Finish Orders Amount Application this period to Date and Stored (C - G) to Date (C+C1) (D +E) to Date WORK COMPLETED 36 Paint yellow themoplastic striping 384 LF 7,680.00$ 7,680.00$ -$ 0.00 -$ 0.00% 7,680.00$ -$ 37 Trench drain 12 LF 4,080.00$ 4,080.00$ 4,080.00 -$ 1.00 4,080.00$ 100.00% -$ 204.00$ 38 Precast removable bollard 11 EA 15,400.00$ 15,400.00$ 11,900.00 -$ 0.77 11,900.00$ 77.27% 3,500.00$ 595.00$ 39 Unforeseen work 1 LS 75,000.00$ 75,000.00$ 50,250.00 -$ 0.67 50,250.00$ 67.00% 24,750.00$ 2,512.50$ 40 Demobilization 1 LS 10,000.00$ 10,000.00$ -$ 0.00 -$ 0.00% 10,000.00$ -$ TOTALS 782,396.00$ -$ 782,396.00$ 456,490.00$ 157,914.00$ 614,404.00$ 167,992.00$ 30,720.20$ CHANGES SUBTOTALS -$ -$ -$ -$ -$ -$ -$ -$ Sean Lee Date: 3/14/2023 Contractor Authorized Signature Printed Name Sean Lee 7/1/12 CONDITIONAL WAIVER AND RELEASE ON PROGRESS PAYMENT NOTICE: THIS DOCUMENT WAIVES THE CLAIMANT'S LIEN, STOP PAYMENT NOTICE, AND PAYMENT BOND RIGHTS EFFECTIVE ON RECEIPT OF PAYMENT. A PERSON SHOULD NOT RELY ON THIS DOCUMENT UNLESS SATISFIED THAT THE CLAIMANT HAS RECEIVED PAYMENT. Identifying Information Name of Claimant: Name of Customer: Job Location: Owner: Through Date: Conditional Waiver and Release This document waives and releases lien, stop payment notice, and payment bond rights the claimant has for labor and service provided, and equipment and material delivered, to the customer on this job through the Through Date of this document. Rights based upon labor or service provided, or equipment or material delivered, pursuant to a written change order that has been fully executed by the parties prior to the date that this document is signed by the claimant, are waived and released by this document, unless listed as an Exception below. This document is effective only on the claimant's receipt of payment from the financial institution on which the following check is drawn: Maker of Check: Amount of Check: $ Check Payable to: Exceptions This document does not affect any of the following: (1) Retentions. (2) Extras for which the claimant has not received payment. (3) The following progress payments for which the claimant has previously given a conditional waiver and release but has not received payment: Date(s) of waiver and release:________________________________________ Amount(s) of unpaid progress payment(s): $_____________________________ (4) Contract rights, including (A) a right based on rescission, abandonment, or breach of contract, and (B) the right to recover compensation for work not compensated by the payment. Signature Claimant's Signature: Claimant's Title: Date of Signature: DEARK E&C, INC CITY OF REDLANDS ORANGE BLOSSOM TRAIL PHASE 3 CITY OF REDLANDS 02/28/2023 CITY OF REDLANDS 150,018.30 DEARK E&C, INC ACCOUNTANT 03/14/2023 Sean Lee Date:3/14/2023 Account Number 241400-8405-S241001 Contractor:PO No.22212412 PO Date 6/28/2022 1830 W 147th Street Notice to Proceed 6/20/2022 Gardena, CA 90249 Date Amount Pay To:Original Contract 782,396.00$ Contract Amendment #1 Total Contract 782,396.00$ Precentage of Work Completed to Date:78.53%Total Work Billed to Date 614,404.00$ Percentage of Change Orders Billed to Date:0.00%Total Change Orders -$ Total Retention to Date 30,720.20$ Previous Amount Paid 433,665.50$ MPPR Number 6 Invoice Date 3/14/2023 Billed This Period 157,914.00$ Change Orders This Period -$ Invoice Number 6 Less 5% Retention This Period 7,895.70$ Net Payment 150,018.30$ MPPR No.Process Date Billed Amount Change Order Paid This Period Retention Net Payment 1 9/1/2022 69,420.00$ 3,471.00$ 65,949.00$ 2 10/17/2022 101,880.00$ 5,094.00$ 96,786.00$ 3 11/21/2022 123,258.00$ 6,162.90$ 117,095.10$ 4 1/19/2023 103,296.00$ 5,164.80$ 98,131.20$ 5 2/9/2023 58,636.00$ 2,931.80$ 55,704.20$ 6 3/14/2023 157,914.00$ 7,895.70$ 150,018.30$ 7 -$ -$ 8 -$ -$ 9 -$ -$ 10 -$ -$ 11 -$ -$ 12 -$ -$ 13 -$ -$ 14 -$ -$ 15 -$ -$ 16 -$ -$ 17 -$ -$ 18 -$ -$ 19 -$ -$ 20 Total 614,404.00$ -$ 30,720.20$ 583,683.80$ Municipal Utilities & Engineering Department 35 Cajon Street, Suite 15A Redlands, CA 92373 ORANGE BLOSSOM TRAIL PHASE III Project No. S241001 DEARK E&C INC Same as Above VENDOR NUMBER VENDOR NAME INVOICEAMOUNTINVOICE DATE INVOICENUMBER DESCRIPTION PO#: MP Pay To The Order Of Vendor Number 227764 06/15/2023 $159,592.40 CHECK NUMBER CHECK DATE CHECK AMOUNT 200982 DEARK E&C INC 04/28/2023 7 ORANGE BLOSSOM TRAIL PHASE III PROJECT S241001 $159,592.40 22212412 - MUNICIPAL UTIL & ENGINEERING VOID IF NOT CASHED WITHIN SIX MONTHS U.S. Bank, N.A., 800 Nicollet Mall BC-MN-H20I, Minneapolis, MN 55402 90-3582/1222 | 153210005234 VOID CITYOFREDLANDSCITYOFREDLANDSCITYOFREDLANDSCITYOFREDLANDSCITYOFREDLANDSCITYOFREDLANDSCITYOFREDLANDSCITYOFREDLANDSCITYOFREDLANDSCITYOFREDLANDSCITYOFREDLANDSCITYOFREDL… Management Serv./Finance Director P.O. Box 3005 Redlands, CA 92373 200982 Check Number 227764 Check Date 06/15/2023 DEARK E&C INC1830 W 147TH STGARDENA, CA 90249 $159,592.40*** One Hundred And Fifty-Nine Thousand Five Hundred And Ninety-Two Dollars And Forty Cents *** PAGE:1 OF 1 APPLICATION AND CERTIFICATE FOR PAYMENT City of Redlands 35 Cajon St Redlands, CA 92373 PROGRESS PAYMENT [ ]FINAL PAYMENT [ X ]FIRST AND FINAL PAYMENT [ ]RETENTION PAYMENT [ ] CONTRACTOR Deark E&C, Inc.PROJECT TITLE Orange Blossom Trail Phase 3 ADDRESS 1830 W 147th Street, Gardena, CA 90249 PROJECT NUMBER S241001 BID NO. / JOB NO. S241001 PHONE NUMBER (424) 344-2380 EMAIL djin@dearkec.com CLERKS DOC NUMBER OA NUMBER CONTACT NAME Dong K Jin PURCHASE ORDER NUMBER 22212412 VENDOR NUMBER 200982 CONTRACT SUMMARY Original Contract Amount: $782,396.00 Approved Change Orders: $0.00 Approved Contract Amendments: $0.00 Current Contract Amount: $782,396.00 Original Contract Completion Date: 04-04-2023 Additional Days Per Change Order: 0 days Current Contract Completion Date: 04-17-2023 Payment Information this Period Cumulative Payment Information 1. Payment Application Number P 7 9. Original Contract Work Completed to Date $782,396.00 2. Payment Period Beginning Date 03/01/2023 10. Change Order Work Completed to Date $0.00 3. Payment Period Ending Date 04/30/2023 11. Contract Amendment Work Completed to Date $0.00 4. Total Amount Requested this Pay Period $167,992.00 12. Total Work Completed to Date (sum lines 9+10+11)$782,396.00 5. Less Retention $8,399.60 13. Total Retention Held to Date $39,119.80 6. Current Payment Due $159,592.40 14. Total Work to Date, Less Retention (line 12 minus Line 13)$743,276.20 7. Balance to Finish $0.00 15. Less Previous Certificates for Payment $583,683.80 8. Percentage Paid to Date, Including this Period 100.0 16. Current Due this Payment Request (Line 14 minus Line 15)$159,592.40 Certification Approved For Processing Submitted and Agreed to By:Inspector: Frannie Fox, May 16 2023 10:38 AM I certify that to the best of my knowledge and belief, all items of work for which payment is being requested have been completed in accordance with the terms of the contract, and that no part of the amount requested has been received. Project Manager: Gerard Nepomuceno, May 16 2023 01:32 PM Sean Lee, Accountant | May 11 2023 05:29 pm City Engineer: Goutam Dobey, May 16 2023 01:34 PM Payment Application Report: Payment Number P 7 Payment Date From: 03-01-2023 To: 04-30-2023 Payment Total: 167,992.00 Item #Description Unit of Measure Original Bid Quantity Current Bid Quantity Previous Pay Pending/Approved Qty this Period Unit Cost Total Cost Percent Complete 1 Mobilization LS 1 1 0 / 1 0.00 $37,000.00 $0.00 100.0 2 Erosion Control Plan LS 1 1 0 / 1 0.00 $8,000.00 $0.00 100.0 3 Traffic Control Plan LS 1 1 0 / 1 0.00 $16,500.00 $0.00 100.0 4 Construction Surveying LS 1 1 0 / 1 0.00 $8,200.00 $0.00 100.0 5 Clearing and Grubbing LS 1 1 0 / 1 0.00 $8,200.00 $0.00 100.0 6 Grading LS 1 1 0 / 1 0.00 $24,000.00 $0.00 100.0 7 4-inch Asphalt Concrete Pavement Over 12-inch Native SF 22896 22896 0 / 22896 0.00 $5.50 $0.00 100.0 8 Bike Trail Signage, Striping, and Markings LS 1 1 0 / 0 1.00 $19,000.00 $19000.00 100.0 9 30-inch X 30-inch Inlet Grate EA 1 1 0 / 1 0.00 $8,000.00 $0.00 100.0 10 Three Rail PVC Fence LF 2488 2488 0 / 2488 0.00 $32.00 $0.00 100.0 11 Decorative Concrete SF 4091 4091 0 / 2400 1,691.00 $12.00 $20292.00 100.0 12 Adjust Manhole EA 2 2 0 / 0 2.00 $2,000.00 $4000.00 100.0 13 Truncated Domes SF 270 270 0 / 0 270.00 $60.00 $16200.00 100.0 14 Construct ADA Curb Ramps Type 1 EA 4 4 0 / 2 2.00 $2,000.00 $4000.00 100.0 15 Construct ADA Curb Ramps Type 1A EA 1 1 0 / 1 0.00 $8,000.00 $0.00 100.0 16 Grind and Overlay Variable Thickness Pavement SF 4904 4904 0 / 4904 0.00 $3.00 $0.00 100.0 17 Overlay variable thickness pavement SF 108 108 0 / 108 0.00 $36.00 $0.00 100.0 18 4-Inch Concrete Side Walk SF 585 585 0 / 585 0.00 $14.00 $0.00 100.0 19 6-Inch Concrete curb gutter LF 117 117 0 / 117 0.00 $68.00 $0.00 100.0 20 Install 24-Inch RCP LF 33 33 0 / 33 0.00 $500.00 $0.00 100.0 21 Grouted Rip-Rap CY 14 14 0 / 12.5 1.50 $800.00 $1200.00 100.0 22 Tubular Steel Gate EA 4 4 0 / 0 4.00 $1,000.00 $4000.00 100.0 23 Precast Concrete Litter Receptacle EA 2 2 0 / 2 0.00 $2,000.00 $0.00 100.0 24 6-Inch Mow Curb LF 4956 4956 0 / 4956 0.00 $8.50 $0.00 100.0 25 Street Crossing Monument Sign EA 3 3 0 / 1 2.00 $8,200.00 $16400.00 100.0 26 Trail Head Monument Sign EA 1 1 0 / 0.5 0.50 $16,500.00 $8250.00 100.0 27 Install 4-Inch atrium drain EA 1 1 0 / 1 0.00 $1,650.00 $0.00 100.0 28 Install 4-Inch PVC pipe EA 7 7 0 / 7 0.00 $600.00 $0.00 100.0 29 "No Dumping Drains to Ocean" stencil.EA 2 2 0 / 2 0.00 $2,000.00 $0.00 100.0 30 Bio Retention Basin LF 155 155 0 / 155 0.00 $200.00 $0.00 100.0 31 Concrete Swale LF 2478 2478 0 / 2478 0.00 $11.00 $0.00 100.0 32 Concrete Island SF 300 300 0 / 0 300.00 $38.00 $11400.00 100.0 33 Warning Sign EA 12 12 0 / 0 12.00 $660.00 $7920.00 100.0 34 Install No Left Turn EA 1 1 0 / 0 1.00 $1,600.00 $1600.00 100.0 35 Install Reflective Delineator Type E LS 26 26 0 / 0 26.00 $300.00 $7800.00 100.0 36 Paint Yellow Thermoplastic Striping LF 384 384 0 / 0 384.00 $20.00 $7680.00 100.0 37 Trench Drain LF 12 12 0 / 12 0.00 $340.00 $0.00 100.0 38 Precast Removable Bollard EA 11 11 0 / 8.5 2.50 $1,400.00 $3500.00 100.0 39 Unforeseen Work LS 1 1 0 / 0.67 0.33 $75,000.00 $24750.00 100.0 40 Demobilization LS 1 1 0 / 0 1.00 $10,000.00 $10000.00 100.0 APPLICATION AND CERTIFICATE FOR PAYMENT AIA DOCUMENT G702 TO (OWNER):City of Redlands PROJECT:APPLICATION NO:7 Distribution to: 35 Cajon St #200 Orange Blossom Trail Phase 3 Redlands, CA 92373 PERIOD TO:3/1/23 - 4/20/23 FROM:DEARK E&C, INC VIA (ARCHITECT): (CONTRACTOR)1830 W. 147th St PROJECT NO:S241001 Gardena, CA 90249 Deark Project No:PG 22-1 CONTRACT DATE:06/20/22 CONTRACTOR'S APPLICATION FOR PAYMENT Application is made for Payment, as shown below, in connection with the Contract. Continuation Sheet, AIA Document G703, is attached CHANGE ORDER SUMMARY 1. ORIGINAL CONTRACT SUM ........................................................$782,396.00 Change Orders approved in previous months by ADDITIONS DEDUCTIONS 2. Net change by Change Orders .....................................................................................$0.00 the Owner 3. CONTRACT SUM TO DATE (Line 1+2) $782,396.00 Approved this Month 4. TOTAL COMPLETED & STORED TO DATE ........................................................$782,396.00 Number Date Approved (Column G on G703) 5. RETAINAGE a. 5% of Completed Work (Column D+E on G703)$39,119.80 b. 5% of Stored Material (Column F on G703)$0.00 Total Retainage (Line 5a + 5b or Total in Column I of G703)$39,119.80 6. TOTAL EARNED LESS RETAINAGE ..................................................$743,276.20 (Line 4 less Line 5 Total) TOTALS $0.00 $0.00 7. LESS PREVIOUS CERTIFICATES FOR Net change by Change Orders PAYMENT (Line 6 from prior Certificate)..................................................$583,683.80 The undersigned Contractor certifies that to the best of the Contractor's knowledge, information 8. CURRENT PAYMENT DUE ....................................................................$159,592.40 and belief the Work covered by this Application for Payment has been completed in accordance 9. BALANCE TO FINISH, PLUS RETAINAGE $39,119.80 with the Contract Documents, that all amounts have been paid by the Contractor for Work for (Line 3 less Line 6) which previous Certificates for Payment were issued and payments received from the Owner, State of: California County of: Los Angeles and that current payment shown herein is now due. CONTRACTOR:Deark E&C, Inc Subscribed and sworn to before me this day of 2022 Notary Public: My Commission expires: By:Date:04/28/23 Sean Lee AMOUNT CERTIFIED (Attach explanation if amount certified differs from the amount applied for.) ARCHITECT: ARCHITECT'S CERTIFICATE FOR PAYMENT In accordance with the Contract Documents, based on on-site observations and the data comprising By: Date: the above application, the Architect certifies to the Owner that to the best of the Architect's knowledge, This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the information and belief the Work has progressed as indicated, the quality of the Work is in accordance Contractor named herein. Issuance, payment and acceptance of payment are without with the Contract Documents, and the Contractor is entitled to payment of AMOUNT CERTIFIED prejudice to any rights of the Owner or Contractor under this Contract. Sean Lee CONTINUATION SHEET AIA DOCUMENT G703 AIA DOCUMENT G703, APPLICATION AND CERTIFICATE FOR PAYMENT, containing APPLICATION NUMBER:7 Contractor's signed Certificate is attached APPLICATION DATE:4/28/2023 In tabulations below, amounts are stated to the nearest dollar.PERIOD TO:3/1/2023 ~ 4/20/2023 Use Column I on contracts where variable retainage for line items may apply. ARCHITECTS PROJ NO: A B B-1 B-2 C C.1 C.2 D E E.1 F G H I Item Description of Work Quantity Unit Scheduled Approved Current Completed Total % Balance Retainage No. Value Change Contract From Previous This Period Quantity Quantity Completed (G/C) to Finish Orders Amount Application this period to Date and Stored (C - G) to Date (C+C1) (D +E) to Date WORK COMPLETED 1 Mobilization 1 LS 37,000.00$ 37,000.00$ 37,000.00 -$ 1.00 37,000.00$ 100.00% -$ 1,850.00$ 2 Erosion control plan 1 LS 8,000.00$ 8,000.00$ 8,000.00 -$ 1.00 8,000.00$ 100.00% -$ 400.00$ 3 Traffic control plan 1 LS 16,500.00$ 16,500.00$ 16,500.00 -$ 1.00 16,500.00$ 100.00% -$ 825.00$ 4 Construction surveying 1 LS 8,200.00$ 8,200.00$ 8,200.00 -$ 1.00 8,200.00$ 100.00% -$ 410.00$ 5 Clearing and grubbing 1 LS 8,200.00$ 8,200.00$ 8,200.00 -$ 1.00 8,200.00$ 100.00% -$ 410.00$ 6 Grading 1 LS 24,000.00$ 24,000.00$ 24,000.00 -$ 1.00 24,000.00$ 100.00% -$ 1,200.00$ 7 4-inch asphalt concrete pavement over 12- inch native 22,896 SF 125,928.00$ 125,928.00$ 125,928.00 -$ 1.00 125,928.00$ 100.00% -$ 6,296.40$ 8 Bike trail signage, striping, and markings 1 LS 19,000.00$ 19,000.00$ 19,000.00$ 1.00 1.00 19,000.00$ 100.00% -$ 950.00$ 9 30-inch x 30-inch inlet grate 1 EA 8,000.00$ 8,000.00$ 8,000.00 -$ 1.00 8,000.00$ 100.00% -$ 400.00$ 10 Tree rail PVC fence 2,488 LF 79,616.00$ 79,616.00$ 79,616.00 -$ 1.00 79,616.00$ 100.00% -$ 3,980.80$ 11 Decorative concrete 4,091 SF 49,092.00$ 49,092.00$ 28,800.00 20,292.00$ 1691.00 1.00 49,092.00$ 100.00% -$ 2,454.60$ 12 Adjust manhole 2 EA 4,000.00$ 4,000.00$ 4,000.00$ 2.00 1.00 4,000.00$ 100.00% -$ 200.00$ 13 Truncated domes 270 SF 16,200.00$ 16,200.00$ 16,200.00$ 270.00 1.00 16,200.00$ 100.00% -$ 810.00$ 14 Construct ADA curb rmaps Type 1 4 EA 8,000.00$ 8,000.00$ 4,000.00 4,000.00$ 2.00 1.00 8,000.00$ 100.00% -$ 400.00$ 15 Construct ADA curb ramps Type 2 1 EA 8,000.00$ 8,000.00$ 8,000.00 -$ 1.00 8,000.00$ 100.00% -$ 400.00$ 16 Grind and overlay variable thickness pavement 4,904 SF 14,712.00$ 14,712.00$ 14,712.00 -$ 1.00 14,712.00$ 100.00% -$ 735.60$ 17 Overlay variable thickness pavement 108 SF 3,888.00$ 3,888.00$ 3,888.00 -$ 1.00 3,888.00$ 100.00% -$ 194.40$ 18 4-inch concrete side walk 585 SF 8,190.00$ 8,190.00$ 8,190.00 -$ 1.00 8,190.00$ 100.00% -$ 409.50$ 19 6-inch concrete curb gutter 117 LF 7,956.00$ 7,956.00$ 7,956.00 -$ 1.00 7,956.00$ 100.00% -$ 397.80$ 20 Install 24-inch RCP 33 LF 16,500.00$ 16,500.00$ 16,500.00 -$ 1.00 16,500.00$ 100.00% -$ 825.00$ 21 Grouted Rip-Rap 14 CY 11,200.00$ 11,200.00$ 10,000.00 1,200.00$ 1.50 1.00 11,200.00$ 100.00% -$ 560.00$ 22 Tubular steel gate 4 EA 4,000.00$ 4,000.00$ 4,000.00$ 4.00 1.00 4,000.00$ 100.00% -$ 200.00$ 23 Precast concrete litter receptacle 2 EA 4,000.00$ 4,000.00$ 4,000.00 -$ 1.00 4,000.00$ 100.00% -$ 200.00$ 24 6-inch mow curb 4956 LF 42,126.00$ 42,126.00$ 42,126.00 -$ 1.00 42,126.00$ 100.00% -$ 2,106.30$ 25 Street crossing monument sign 3 EA 24,600.00$ 24,600.00$ 8,200.00 16,400.00$ 2.00 1.00 24,600.00$ 100.00% -$ 1,230.00$ 26 Trail head mounment sign 1 EA 16,500.00$ 16,500.00$ 8,250.00 8,250.00$ 0.50 1.00 16,500.00$ 100.00% -$ 825.00$ 27 Install 4-inch atrium drain 1 EA 1,650.00$ 1,650.00$ 1,650.00 -$ 1.00 1,650.00$ 100.00% -$ 82.50$ 28 Install 4-inch PVC pipe 7 EA 4,200.00$ 4,200.00$ 4,200.00 -$ 1.00 4,200.00$ 100.00% -$ 210.00$ 29 "No dumping drains to Ocean" stencil 2 EA 4,000.00$ 4,000.00$ 4,000.00 -$ 1.00 4,000.00$ 100.00% -$ 200.00$ 30 Bio retention basin 155 LF 31,000.00$ 31,000.00$ 31,000.00 -$ 1.00 31,000.00$ 100.00% -$ 1,550.00$ 31 Concrete swale 2478 LF 27,258.00$ 27,258.00$ 27,258.00 -$ 1.00 27,258.00$ 100.00% -$ 1,362.90$ 32 Concrete island 300 SF 11,400.00$ 11,400.00$ 11,400.00$ 300.00 1.00 11,400.00$ 100.00% -$ 570.00$ 33 Warning sign 12 EA 7,920.00$ 7,920.00$ 7,920.00$ 12.00 1.00 7,920.00$ 100.00% -$ 396.00$ 34 Install no left turn 1 EA 1,600.00$ 1,600.00$ 1,600.00$ 1.00 1.00 1,600.00$ 100.00% -$ 80.00$ 35 Install reflective delineator Type E 26 EA 7,800.00$ 7,800.00$ 7,800.00$ 26.00 1.00 7,800.00$ 100.00% -$ 390.00$ CONTINUATION SHEET AIA DOCUMENT G703 AIA DOCUMENT G703, APPLICATION AND CERTIFICATE FOR PAYMENT, containing APPLICATION NUMBER:7 Contractor's signed Certificate is attached APPLICATION DATE:4/28/2023 In tabulations below, amounts are stated to the nearest dollar.PERIOD TO:3/1/2023 ~ 4/20/2023 Use Column I on contracts where variable retainage for line items may apply. ARCHITECTS PROJ NO: A B B-1 B-2 C C.1 C.2 D E E.1 F G H I Item Description of Work Quantity Unit Scheduled Approved Current Completed Total % Balance Retainage No. Value Change Contract From Previous This Period Quantity Quantity Completed (G/C) to Finish Orders Amount Application this period to Date and Stored (C - G) to Date (C+C1) (D +E) to Date WORK COMPLETED 36 Paint yellow themoplastic striping 384 LF 7,680.00$ 7,680.00$ 7,680.00$ 384.00 1.00 7,680.00$ 100.00% -$ 384.00$ 37 Trench drain 12 LF 4,080.00$ 4,080.00$ 4,080.00 -$ 1.00 4,080.00$ 100.00% -$ 204.00$ 38 Precast removable bollard 11 EA 15,400.00$ 15,400.00$ 11,900.00 3,500.00$ 2.50 1.00 15,400.00$ 100.00% -$ 770.00$ 39 Unforeseen work 1 LS 75,000.00$ 75,000.00$ 50,250.00 24,750.00$ 0.33 1.00 75,000.00$ 100.00% -$ 3,750.00$ 40 Demobilization 1 LS 10,000.00$ 10,000.00$ 10,000.00$ 1.00 1.00 10,000.00$ 100.00% -$ 500.00$ TOTALS 782,396.00$ -$ 782,396.00$ 614,404.00$ 167,992.00$ 782,396.00$ -$ 39,119.80$ CHANGES SUBTOTALS -$ -$ -$ -$ -$ -$ -$ -$ Sean Lee Date: 4/28/2023 Contractor Authorized Signature Printed Name Sean Lee 7/1/12 CONDITIONAL WAIVER AND RELEASE ON PROGRESS PAYMENT NOTICE: THIS DOCUMENT WAIVES THE CLAIMANT'S LIEN, STOP PAYMENT NOTICE, AND PAYMENT BOND RIGHTS EFFECTIVE ON RECEIPT OF PAYMENT. A PERSON SHOULD NOT RELY ON THIS DOCUMENT UNLESS SATISFIED THAT THE CLAIMANT HAS RECEIVED PAYMENT. Identifying Information Name of Claimant: Name of Customer: Job Location: Owner: Through Date: Conditional Waiver and Release This document waives and releases lien, stop payment notice, and payment bond rights the claimant has for labor and service provided, and equipment and material delivered, to the customer on this job through the Through Date of this document. Rights based upon labor or service provided, or equipment or material delivered, pursuant to a written change order that has been fully executed by the parties prior to the date that this document is signed by the claimant, are waived and released by this document, unless listed as an Exception below. This document is effective only on the claimant's receipt of payment from the financial institution on which the following check is drawn: Maker of Check: Amount of Check: $ Check Payable to: Exceptions This document does not affect any of the following: (1) Retentions. (2) Extras for which the claimant has not received payment. (3) The following progress payments for which the claimant has previously given a conditional waiver and release but has not received payment: Date(s) of waiver and release:________________________________________ Amount(s) of unpaid progress payment(s): $_____________________________ (4) Contract rights, including (A) a right based on rescission, abandonment, or breach of contract, and (B) the right to recover compensation for work not compensated by the payment. Signature Claimant's Signature: Claimant's Title: Date of Signature: DEARK E&C, INC CITY OF REDLANDS ORANGE BLOSSOM TRAIL PHASE 3 CITY OF REDLANDS 04/20/2023 CITY OF REDLANDS 159,592.40 DEARK E&C, INC ACCOUNTANT 04/28/2023 Sean Lee Date:5/8/2023 Account Number 241400-8405-S241001 Contractor:PO No.22212412 PO Date 6/28/2022 1830 W 147th Street Notice to Proceed 6/20/2022 Gardena, CA 90249 Date Amount Pay To:Original Contract 782,396.00$ Contract Amendment #1 Total Contract 782,396.00$ Precentage of Work Completed to Date:100.00%Total Work Billed to Date 782,396.00$ Percentage of Change Orders Billed to Date:0.00%Total Change Orders -$ Total Retention to Date 39,119.80$ Previous Amount Paid 583,683.80$ MPPR Number 7 Invoice Date 4/28/2023 Billed This Period 167,992.00$ Change Orders This Period -$ Invoice Number 7 Less 5% Retention This Period 8,399.60$ Net Payment 159,592.40$ MPPR No.Process Date Billed Amount Change Order Paid This Period Retention Net Payment 1 9/1/2022 69,420.00$ 3,471.00$ 65,949.00$ 2 10/17/2022 101,880.00$ 5,094.00$ 96,786.00$ 3 11/21/2022 123,258.00$ 6,162.90$ 117,095.10$ 4 1/19/2023 103,296.00$ 5,164.80$ 98,131.20$ 5 2/9/2023 58,636.00$ 2,931.80$ 55,704.20$ 6 3/14/2023 157,914.00$ 7,895.70$ 150,018.30$ 7 5/8/2023 167,992.00$ 8,399.60$ 159,592.40$ 8 -$ -$ 9 -$ -$ 10 -$ -$ 11 -$ -$ 12 -$ -$ 13 -$ -$ 14 -$ -$ 15 -$ -$ 16 -$ -$ 17 -$ -$ 18 -$ -$ 19 -$ -$ 20 Total 782,396.00$ -$ 39,119.80$ 743,276.20$ Municipal Utilities & Engineering Department 35 Cajon Street, Suite 15A Redlands, CA 92373 ORANGE BLOSSOM TRAIL PHASE III Project No. S241001 DEARK E&C INC Same as Above VENDOR NUMBER VENDOR NAME INVOICEAMOUNTINVOICE DATE INVOICENUMBER DESCRIPTION PO#: MP Pay To The Order Of Vendor Number 228457 07/06/2023 $39,119.80 CHECK NUMBER CHECK DATE CHECK AMOUNT 200982 DEARK E&C INC 05/30/2023 R1 R) ORANGE BLOSSOM TRAIL PHASE III PROJECT S241001 $39,119.80 22212412 - MUNICIPAL UTIL & ENGINEERING VOID IF NOT CASHED WITHIN SIX MONTHS U.S. Bank, N.A., 800 Nicollet Mall BC-MN-H20I, Minneapolis, MN 55402 90-3582/1222 | 153210005234 VOID CITYOFREDLANDSCITYOFREDLANDSCITYOFREDLANDSCITYOFREDLANDSCITYOFREDLANDSCITYOFREDLANDSCITYOFREDLANDSCITYOFREDLANDSCITYOFREDLANDSCITYOFREDLANDSCITYOFREDLANDSCITYOFREDL… Management Serv./Finance Director P.O. Box 3005 Redlands, CA 92373 200982 Check Number 228457 Check Date 07/06/2023 DEARK E&C INC1830 W 147TH STGARDENA, CA 90249 $39,119.80*** Thirty-Nine Thousand One Hundred And Nineteen Dollars And Eighty Cents *** PAGE:1 OF 1 APPLICATION AND CERTIFICATE FOR PAYMENT City of Redlands 35 Cajon St Redlands, CA 92373 PROGRESS PAYMENT [ ]FINAL PAYMENT [ ]FIRST AND FINAL PAYMENT [ ]RETENTION PAYMENT [ X ] CONTRACTOR Deark E&C, Inc.PROJECT TITLE Orange Blossom Trail Phase 3 ADDRESS 1830 W 147th Street, Gardena, CA 90249 PROJECT NUMBER S241001 BID NO. / JOB NO. S241001 PHONE NUMBER (424) 344-2380 EMAIL djin@dearkec.com CLERKS DOC NUMBER OA NUMBER CONTACT NAME Dong K Jin PURCHASE ORDER NUMBER 22212412 VENDOR NUMBER 200982 CONTRACT SUMMARY Original Contract Amount: $782,396.00 Approved Change Orders: $0.00 Approved Contract Amendments: $0.00 Current Contract Amount: $782,396.00 Original Contract Completion Date: 04-04-2023 Additional Days Per Change Order: 0 days Current Contract Completion Date: 04-17-2023 Payment Information this Period Cumulative Payment Information 1. Payment Application Number R 1 9. Original Contract Work Completed to Date $782,396.00 2. Payment Period Beginning Date 06/20/2022 10. Change Order Work Completed to Date $0.00 3. Payment Period Ending Date 05/24/2023 11. Contract Amendment Work Completed to Date $0.00 4. Total Amount Requested this Pay Period $39,119.80 12. Total Work Completed to Date (sum lines 9+10+11)$782,396.00 5. Less Retention $0.00 13. Total Retention Held to Date $0.00 6. Current Payment Due $39,119.80 14. Total Work to Date, Less Retention (line 12 minus Line 13)$782,396.00 7. Balance to Finish $0.00 15. Less Previous Certificates for Payment $743,276.20 8. Percentage Paid to Date, Including this Period 100.0 16. Current Due this Payment Request (Line 14 minus Line 15)$39,119.80 Certification Approved For Processing Submitted and Agreed to By:Inspector: Frannie Fox, May 30 2023 03:53 PM I certify that to the best of my knowledge and belief, all items of work for which payment is being requested have been completed in accordance with the terms of the contract, and that no part of the amount requested has been received. Project Manager: Gerard Nepomuceno, Jun 13 2023 07:37 AM Sean Lee, Accountant | May 30 2023 11:51 am City Engineer: Goutam Dobey, Jun 13 2023 07:39 AM Payment Application Report: Payment Number R 1 Payment Date From: Jun 20 2022 To: May 24 2023 Payment Total: 39,119.80 Retention Payment Retention Withheld to Date 39,119.80 Retention Paid to Date 0.00 Remaining Retention Withheld to Date 39,119.80 Retention Amount to Release Now 100.0 % | $ 39,119.80 Retention Amount this Payment 39,119.80 APPLICATION AND CERTIFICATE FOR PAYMENT AIA DOCUMENT G702 TO (OWNER):City of Redlands PROJECT:APPLICATION NO:8 - Retention Distribution to: 35 Cajon St #200 Orange Blossom Trail Phase 3 Redlands, CA 92373 PERIOD TO:6/20/22 - 4/20/23 FROM:DEARK E&C, INC VIA (ARCHITECT): (CONTRACTOR)1830 W. 147th St PROJECT NO:S241001 Gardena, CA 90249 Deark Project No:PG 22-1 CONTRACT DATE:06/20/22 CONTRACTOR'S APPLICATION FOR PAYMENT Application is made for Payment, as shown below, in connection with the Contract. Continuation Sheet, AIA Document G703, is attached CHANGE ORDER SUMMARY 1. ORIGINAL CONTRACT SUM ........................................................$782,396.00 Change Orders approved in previous months by ADDITIONS DEDUCTIONS 2. Net change by Change Orders .....................................................................................$0.00 the Owner 3. CONTRACT SUM TO DATE (Line 1+2) $782,396.00 Approved this Month 4. TOTAL COMPLETED & STORED TO DATE ........................................................$782,396.00 Number Date Approved (Column G on G703) 5. RETAINAGE a. 5% of Completed Work (Column D+E on G703)$0.00 b. 5% of Stored Material (Column F on G703)$0.00 Total Retainage (Line 5a + 5b or Total in Column I of G703)$0.00 6. TOTAL EARNED LESS RETAINAGE ..................................................$782,396.00 (Line 4 less Line 5 Total) TOTALS $0.00 $0.00 7. LESS PREVIOUS CERTIFICATES FOR Net change by Change Orders PAYMENT (Line 6 from prior Certificate)..................................................$743,276.20 The undersigned Contractor certifies that to the best of the Contractor's knowledge, information 8. CURRENT PAYMENT DUE ....................................................................$39,119.80 and belief the Work covered by this Application for Payment has been completed in accordance 9. BALANCE TO FINISH, PLUS RETAINAGE $0.00 with the Contract Documents, that all amounts have been paid by the Contractor for Work for (Line 3 less Line 6) which previous Certificates for Payment were issued and payments received from the Owner, State of: California County of: Los Angeles and that current payment shown herein is now due. CONTRACTOR:Deark E&C, Inc Subscribed and sworn to before me this day of 2022 Notary Public: My Commission expires: By:Date:05/24/23 Sean Lee AMOUNT CERTIFIED (Attach explanation if amount certified differs from the amount applied for.) ARCHITECT: ARCHITECT'S CERTIFICATE FOR PAYMENT In accordance with the Contract Documents, based on on-site observations and the data comprising By: Date: the above application, the Architect certifies to the Owner that to the best of the Architect's knowledge, This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the information and belief the Work has progressed as indicated, the quality of the Work is in accordance Contractor named herein. Issuance, payment and acceptance of payment are without with the Contract Documents, and the Contractor is entitled to payment of AMOUNT CERTIFIED prejudice to any rights of the Owner or Contractor under this Contract. CONTINUATION SHEET AIA DOCUMENT G703 AIA DOCUMENT G703, APPLICATION AND CERTIFICATE FOR PAYMENT, containing APPLICATION NUMBER: Contractor's signed Certificate is attached 5/24/2023 In tabulations below, amounts are stated to the nearest dollar.6/20/2023 ~ 4/20/2023 Use Column I on contracts where variable retainage for line items may apply. ARCHITECTS PROJ NO: A B B-1 B-2 C C.1 C.2 D E E.1 F G H I Item Description of Work Quantity Unit Scheduled Approved Current Completed Total % Balance Retainage No. Value Change Contract From Previous This Period Quantity Quantity Completed (G/C) to Finish Orders Amount Application this period to Date and Stored (C - G) to Date (C+C1) (D +E) to Date WORK COMPLETED 8 - Retention APPLICATION DATE: PERIOD TO: 1 Mobilization 1 LS 37,000.00$ 37,000.00$ 37,000.00 -$ 1.00 37,000.00$ 100.00% -$ -$ 2 Erosion control plan 1 LS 8,000.00$ 8,000.00$ 8,000.00 -$ 1.00 8,000.00$ 100.00% -$ -$ 3 Traffic control plan 1 LS 16,500.00$ 16,500.00$ 16,500.00 -$ 1.00 16,500.00$ 100.00% -$ -$ 4 Construction surveying 1 LS 8,200.00$ 8,200.00$ 8,200.00 -$ 1.00 8,200.00$ 100.00% -$ -$ 5 Clearing and grubbing 1 LS 8,200.00$ 8,200.00$ 8,200.00 -$ 1.00 8,200.00$ 100.00% -$ -$ 6 Grading 1 LS 24,000.00$ 24,000.00$ 24,000.00 -$ 1.00 24,000.00$ 100.00% -$ -$ 7 4-inch asphalt concrete pavement over 12- inch native 22,896 SF 125,928.00$ 125,928.00$ 125,928.00 -$ 1.00 125,928.00$ 100.00% -$ -$ 8 Bike trail signage, striping, and markings 1 LS 19,000.00$ 19,000.00$ 19,000.00 -$ 1.00 19,000.00$ 100.00% -$ -$ 9 30-inch x 30-inch inlet grate 1 EA 8,000.00$ 8,000.00$ 8,000.00 -$ 1.00 8,000.00$ 100.00% -$ -$ 10 Tree rail PVC fence 2,488 LF 79,616.00$ 79,616.00$ 79,616.00 -$ 1.00 79,616.00$ 100.00% -$ -$ 11 Decorative concrete 4,091 SF 49,092.00$ 49,092.00$ 49,092.00 -$ 1.00 49,092.00$ 100.00% -$ -$ 12 Adjust manhole 2 EA 4,000.00$ 4,000.00$ 4,000.00 -$ 1.00 4,000.00$ 100.00% -$ -$ 13 Truncated domes 270 SF 16,200.00$ 16,200.00$ 16,200.00 -$ 1.00 16,200.00$ 100.00% -$ -$ 14 Construct ADA curb rmaps Type 1 4 EA 8,000.00$ 8,000.00$ 8,000.00 -$ 1.00 8,000.00$ 100.00% -$ -$ 15 Construct ADA curb ramps Type 2 1 EA 8,000.00$ 8,000.00$ 8,000.00 -$ 1.00 8,000.00$ 100.00% -$ -$ 16 Grind and overlay variable thickness pavement 4,904 SF 14,712.00$ 14,712.00$ 14,712.00 -$ 1.00 14,712.00$ 100.00% -$ -$ 17 Overlay variable thickness pavement 108 SF 3,888.00$ 3,888.00$ 3,888.00 -$ 1.00 3,888.00$ 100.00% -$ -$ 18 4-inch concrete side walk 585 SF 8,190.00$ 8,190.00$ 8,190.00 -$ 1.00 8,190.00$ 100.00% -$ -$ 19 6-inch concrete curb gutter 117 LF 7,956.00$ 7,956.00$ 7,956.00 -$ 1.00 7,956.00$ 100.00% -$ -$ 20 Install 24-inch RCP 33 LF 16,500.00$ 16,500.00$ 16,500.00 -$ 1.00 16,500.00$ 100.00% -$ -$ 21 Grouted Rip-Rap 14 CY 11,200.00$ 11,200.00$ 11,200.00 -$ 1.00 11,200.00$ 100.00% -$ -$ 22 Tubular steel gate 4 EA 4,000.00$ 4,000.00$ 4,000.00 -$ 1.00 4,000.00$ 100.00% -$ -$ 23 Precast concrete litter receptacle 2 EA 4,000.00$ 4,000.00$ 4,000.00 -$ 1.00 4,000.00$ 100.00% -$ -$ 24 6-inch mow curb 4956 LF 42,126.00$ 42,126.00$ 42,126.00 -$ 1.00 42,126.00$ 100.00% -$ -$ 25 Street crossing monument sign 3 EA 24,600.00$ 24,600.00$ 24,600.00 -$ 1.00 24,600.00$ 100.00% -$ -$ 26 Trail head mounment sign 1 EA 16,500.00$ 16,500.00$ 16,500.00 -$ 1.00 16,500.00$ 100.00% -$ -$ 27 Install 4-inch atrium drain 1 EA 1,650.00$ 1,650.00$ 1,650.00 -$ 1.00 1,650.00$ 100.00% -$ -$ 28 Install 4-inch PVC pipe 7 EA 4,200.00$ 4,200.00$ 4,200.00 -$ 1.00 4,200.00$ 100.00% -$ -$ 29 "No dumping drains to Ocean" stencil 2 EA 4,000.00$ 4,000.00$ 4,000.00 -$ 1.00 4,000.00$ 100.00% -$ -$ 30 Bio retention basin 155 LF 31,000.00$ 31,000.00$ 31,000.00 -$ 1.00 31,000.00$ 100.00% -$ -$ 31 Concrete swale 2478 LF 27,258.00$ 27,258.00$ 27,258.00 -$ 1.00 27,258.00$ 100.00% -$ -$ 32 Concrete island 300 SF 11,400.00$ 11,400.00$ 11,400.00 -$ 1.00 11,400.00$ 100.00% -$ -$ 33 Warning sign 12 EA 7,920.00$ 7,920.00$ 7,920.00 -$ 1.00 7,920.00$ 100.00% -$ -$ 34 Install no left turn 1 EA 1,600.00$ 1,600.00$ 1,600.00 -$ 1.00 1,600.00$ 100.00% -$ -$ 35 Install reflective delineator Type E 26 EA 7,800.00$ 7,800.00$ 7,800.00 -$ 1.00 7,800.00$ 100.00% -$ -$ CONTINUATION SHEET AIA DOCUMENT G703 AIA DOCUMENT G703, APPLICATION AND CERTIFICATE FOR PAYMENT, containing APPLICATION NUMBER: Contractor's signed Certificate is attached 5/24/2023 In tabulations below, amounts are stated to the nearest dollar.6/20/2023 ~ 4/20/2023 Use Column I on contracts where variable retainage for line items may apply. ARCHITECTS PROJ NO: A B B-1 B-2 C C.1 C.2 D E E.1 F G H I Item Description of Work Quantity Unit Scheduled Approved Current Completed Total % Balance Retainage No. Value Change Contract From Previous This Period Quantity Quantity Completed (G/C) to Finish Orders Amount Application this period to Date and Stored (C - G) to Date (C+C1) (D +E) to Date WORK COMPLETED 8 - Retention APPLICATION DATE: PERIOD TO: 36 Paint yellow themoplastic striping 384 LF 7,680.00$ 7,680.00$ 7,680.00 -$ 1.00 7,680.00$ 100.00% -$ -$ 37 Trench drain 12 LF 4,080.00$ 4,080.00$ 4,080.00 -$ 1.00 4,080.00$ 100.00% -$ -$ 38 Precast removable bollard 11 EA 15,400.00$ 15,400.00$ 15,400.00 -$ 1.00 15,400.00$ 100.00% -$ -$ 39 Unforeseen work 1 LS 75,000.00$ 75,000.00$ 75,000.00 -$ 1.00 75,000.00$ 100.00% -$ -$ 40 Demobilization 1 LS 10,000.00$ 10,000.00$ 10,000.00 -$ 1.00 10,000.00$ 100.00% -$ -$ TOTALS 782,396.00$ -$ 782,396.00$ 782,396.00$ -$ 782,396.00$ -$ -$ CHANGES SUBTOTALS -$ -$ -$ -$ -$ -$ -$ -$ Sean Lee Date: 5/24/2023 Contractor Authorized Signature Printed Name CONDITIONAL WAIVER AND RELEASE ON FINAL PAYMENT California Civil Code Section 8136 NOTICE: THIS DOCUMENT WAIVES THE CLAIMANT'S LIEN, STOP PAYMENT NOTICE, AND PAYMENT BOND RIGHTS EFFECTIVE ON RECEIPT OF PAYMENT. A PERSON SHOULD NOT RELY ON THIS DOCUMENT UNLESS SATISFIED THAT THE CLAIMANT HAS RECEIVED PAYMENT. Identifying Information Name of Claimant: Name of Customer: Job Location: Owner: Conditional Waiver and Release This document waives and releases lien, stop payment notice, contract rights, and payment bond rights the claimant has for labor and service provided, and equipment and material delivered, to the customer on this job. Rights based upon labor or service provided, or equipment or material delivered, pursuant to a written change order that has been fully executed by the parties prior to the date that this document is signed by the claimant, are waived and released by this document, unless listed as an Exception below. This document is effective only on the claimant's receipt of payment from the financial institution on which the following check is drawn: Maker of Check: Amount of Check: $ Check Payable to: Exceptions This document does not affect any of the following: Disputed claims for extras in the amount of: $ Signature Claimant's Signature: Claimant's Title: Rev. 1.0.3 7/17/2012 Date of Signature: DEARK E&C, INC CITY OF REDLANDS ORANGE BLOSSOM TRAIL PHASE 3 CITY OF REDLANDS CITY OF REDLANDS 39,119.80 DEARK E&C, INC PROJECT MANAGER 5/24/2023 Sean Lee Date:6/13/2023 Account Number 241400-8405-S241001 Contractor:PO No.22212412 PO Date 6/28/2022 1830 W 147th Street Notice to Proceed 6/20/2022 Gardena, CA 90249 Date Amount Pay To:Original Contract 782,396.00$ Contract Amendment #1 Total Contract 782,396.00$ Precentage of Work Completed to Date:100.00%Total Work Billed to Date 782,396.00$ Percentage of Change Orders Billed to Date:0.00%Total Change Orders -$ Total Retention to Date -$ Previous Amount Paid 743,276.20$ MPPR Number 8 Invoice Date 5/24/2023 Billed This Period 39,119.80$ Change Orders This Period -$ Invoice Number 8 - Retention Less 5% Retention This Period -$ Net Payment 39,119.80$ MPPR No.Process Date Billed Amount Change Order Paid This Period Retention Net Payment 1 9/1/2022 69,420.00$ 3,471.00$ 65,949.00$ 2 10/17/2022 101,880.00$ 5,094.00$ 96,786.00$ 3 11/21/2022 123,258.00$ 6,162.90$ 117,095.10$ 4 1/19/2023 103,296.00$ 5,164.80$ 98,131.20$ 5 2/9/2023 58,636.00$ 2,931.80$ 55,704.20$ 6 3/14/2023 157,914.00$ 7,895.70$ 150,018.30$ 7 5/8/2023 167,992.00$ 8,399.60$ 159,592.40$ 8 6/13/2023 -$ (39,119.80)$ 39,119.80$ 9 -$ -$ 10 -$ -$ 11 -$ -$ 12 -$ -$ 13 -$ -$ 14 -$ -$ 15 -$ -$ 16 -$ -$ 17 -$ -$ 18 -$ -$ 19 -$ -$ 20 Total 782,396.00$ -$ -$ 782,396.00$ Municipal Utilities & Engineering Department 35 Cajon Street, Suite 15A Redlands, CA 92373 ORANGE BLOSSOM TRAIL PHASE III Project No. S241001 DEARK E&C INC Same as Above Alabama St Entrance Alabama St Crossing with stamped concrete and pedestrian refuge Kansas St Entrance e Tennessee St Entrance Ty pical Trail section – 12’ asphalt path, v-gutter, PVC fence, and PCC mow curb Ty pical Trail section – 12’ asphalt path, bio retention basin, grouted rip rap PVC fence, and PCC mow curb Catch basin and trench drain. Reinforced concrete pipe and riprap Tennessee St crossing with stamped concrete Reinforced concrete pipe and riprap