Loading...
Art3_Redlands_FY13_BikePed_OBTIII_Inv11_170802_CLOSED City of Re REDLANDS CMS D o reec oar • incorporated Isss MICHAEL POOL m Municipal Utilities& Engineering Department Assistant City Engineer pORA o 35 Cajon Street, Suite 15A Redlands,CA 92373 909-798-7698 August 2, 2017 Nancy Strickert RECENED San Bernardino County Transit Authority 1170 W. 3rd Street, 2nd Floor AUG 0 4 20i7 San Bernardino, CA 92410-1715 San Bernardino County Trans armtion Autho6ty ORANGE BLOSSOM TRAIL PHASE III PROGRESS PAYMENT QUEST #11 Ms. Strickert, City of Redlands submits to San Bernardino County Transit Authority (SBCTA) progress payment request #11 for Phase III of the Orange Blossom Trail. City Resolution No. 7299, adopted on July 16, 2013, accepted Transportation Development Act Article 3 grant funding in the amount of$918,722.00 and allocated $162,128.00 of City's Palmetto Grove Fund to be used as the grant match. Progress payment request#11 is in the amount of$13�50. Attached are the following documents for your review and processing: 1. Claim Form Checklist 2. Claim Form 3. Financial Reporting Form 1 4. Invoice, check and backup documents for payments 4 ]� 2` If you have any questions,please contact me at 909-798-7524 Ext. 1. b I er ly,ittman or Project Manager jZF€H D6"ACny'ihaWow" San Bernardino County Transportation Commission Local Transportation Fund - Article 3 Pedestrian, Bicycle Facilities and Access to Transit Claim Form Claimant: City of Redlands Date: 8/2/2017 The Check-List below are items that must be included with your submission for reimbursement x 1. Claim Form x 2. Financial Reporting Form (Complete the estimated column for anticipated interest, refunds and expenditures) x 3. Request for Progress Payment (projects over$200,000) (Certified copy of resolution or minute action authorizing the filing of the claim and requesting progress payments) 4. Governing Body Authorization (Completed Projects) (Certified copy of minute action or resolution authorizing the filing of the claim and Project acceptance) 5. Project Completion Report (Council's Project acceptance can be used. Pictures of completed project must be included.) x 6. Other (optional) (List any other information you wish to submit to support your claim) #11 -Check List, Claim Form& Financial Reporting Form Check List Page 1 San Bernardino County Transportation Commission Local Transportation Fund - Article 3 Pedestrian, Bicycle Facilities and Access to Transit Claim Form Fiscal Year: FY2017 Claimant: City of Redlands Attention: Ross Wittman 35 Cajon Street, Suite 15A Senior Project Manager Redlands, CA 92373 Phone M 909-798-7698 Amount: $ 13,982.50 PURPOSE: ( )Article 3, PUC Section 99234a Pedestrian Facilities (x)Article 3, PUC Section 99234a Bicycle Facilities ( )Article 3, PUC Section 99234a Pedestrian Access to Transit Facilities Authorizing Signature: (Signature) Chris Diggs, MUED Director _ (Type Name&Title) Condition of Approval: Approval of this claim and payment by the County Auditor to this claimant are subject to monies being available and to the provision that such monies will be used only in accordance with the allocation instruction. #11-Check List,Claim Form&Financial Reporting Form Claim Form Page 2 San Bernardino County Transportation Commission Local Transportation Fund - Article 3 Bicycle, Pedestrian and Access to Transit Financial Reporting Form Claimant: City of Redlands Date: 8/2/2017 Project % Project Budget TDA Actual Cost Budget Cost 1. Project Name: Orange Blossom Trail Phase Total Project Expenditure $ 1,080,850 $ 16,450.00 3 TDA Article 3 (SB 821) $ 918,722 85% $ 13,982.50 * Local Match $ 162,128 $ 2,467.50 2. Project Name: Total Project Expenditure $ - TDA Article 3 (SB 821) $ - Local Match $ - 3. Project Name: Total Project Expenditure $ - TDA Article 3 (SB 821) $ - Local Match $ I certify that the information on this Financial Reporting form is true and accurate to the best of my knowledge. Signed: Chris Diggs, MUED Director #11 -Check List,Claim Form&Financial Reporting Form Page 3 CITY. O! Ummneek'NJILWA,*wW Pwk CA NM sWs10 A �ao�e,narre �� Check No. 179546 C A L I ! Q -9,X I A P'O.AmMS.-RadWi4C.A9073 ACCOUNTS PAYABLE CHECK CheckOate 07/27/17 ELE'M Thousand Dollars and 'ZERO Cents, A'.'CUrJT $ ***11,000.00 VOID IF NOT CASHED YHTHIN SIX MONTHS -ORDER.OF:.,. SAN-BERNARDINO COUNTY FLOOD CONTROL I DEPA.RTNIM, OF- PUBLIC WORKS s P r � 825. E:,TX.IRD StIm.ET� ROOM 2,61 .. 4 SAN' BERNARDINO., CA',"92415 THIS CHECK CONTAINS MULTIPLE SECURITY FEATURES—SEE BACK FOR DETAILS INVOICE DATE' 'INVOICE NO: PO NO. AMOUNTPAID DEWRIPT" 07/10/17 OH020781 1.1, 000.00 PERMIT P-3203.6055 3-501/2.04 CITY OF REDLANDS VENDOR ACCT NO. CHECK DATE CHECK TOTAL VENDOR NO. CHECK NO. 07/27/17 11,000.00 V00001160 1.79546 CITY OF REDLANDS DISBURSEMENT VOUCHER To: Finance Department Date: 7/10/2017 Pay To: San Bemardino County Requesting Dept: MUED Department of Public Works _ P-32016055 Attn:Administrative Services 825 East Third Street San Bernardino, CA 92415-0835 Payment For: Additional permit fees for OBT III along Mission Channel btw Bryn Mawr Ave&Califom_ia St and btw Alabama&Tennessee St ORGKEY Object Job Ledger Invoice No. Amount Permit P-32016055 240500 5392 47019 File3-501/2.04 $ 11,000.00 Grand Total $11,000.00 Prepared By: Patty Baker for Ross Wittman Authorized By: Finance Approval: Page 1 of 1 4 825 East fiird Street San Bwnwdrko,CA S74%-08351 PLOW 909.387 8104 Fm NS.387.8130 SAN BEERTN�ATR�DTIROO Department of Public Works COUNTY1 1 • En%iroetesefnl&Comtruetlon• Flood Conlrol Go"Nnecondm PETEMCWQRAS •Optrallons•Solid►►-asteManactornt nuvcw •Surveyor•Transpartatloa PERMITSIOPERATIONS SUPPORT DIVISION INVOICE PERINITTEE: Clty of Redlands 35 Cajon 5treeL Suite 15A Redlands,CA 92373 ZONE N� 3 E,ERMIT NO: P-32016055 ll�l E_NO: 3-501I2.04 QPW_W01€; AP32016055 ITEM f& ACCOUNT CODE DESCRIPTION CHARGES 703 RFL 093 8350 Plan CheckslRoview Fee S 11.000.00 TOTAL $11.000.00 "Payment In full Is requested" PLEASE INCLUDE PERMIT NUMBER ON THE CHECK 'Tease include Invoke Stub with Payment~ "Please Intfude Permit Number on Check" INVOICE STUB FOR PERMITSIOPERATIONS SUPPORT DIVISION PERMITTEE: ACCOUNT C0011 MIN No. DESCRIPTION CHATIG�S City of Redlands 35 Con Street,Suke 15A Redlands.CA 92373 RFL 093 8350 703 Plan Checks/Review Fee $ 11,000.00 PERMITNO: P-32016055 FILE NO: 3-501/2.04 DPW WO S., AP32016M (Wake Checks Payable to: AMOUNT San Be nardEno County Flood Control District DUE Department of Public Works $11,000.00 P-32016M Altn:Adminislralive Services 825 E.Third Street,Room 201 San Bemardino,CA 92415-0835 ENTER MtflUNT PAID: Ora ,abssom�TraN=P.hssa,EEl Project review Fees for P-32016055 as of 06/09/2017 Permittee:City of Redlands Division Expenditure FC Permits $7,892.84 Planning $2,008.00 EM4 $476.50 Engineering/ROW $4,564.50 f O Total Review fees as o6/09/2017- 14,94164 Amount Total Collected- 55.450AO Total Amount Due- SKOLS4 Ross Wittman From: Mish, Marty[mmish@dpw.sbcounty.gov] Sent: Friday,July 07,2017 3:19 PM To: Ross Wittman Subject: Orange Blossom Trail Phase 3, Permit No.: P-32016055, Fees by Division Attachments: P-32016055_ExplanationofFees.xisx Ross, Here is our current breakdown of fees assessed by the District's various divisions involved in the review of P-32016055. Marty Mists Frood Control PermR Coordinator vepartmard of public works Pem nsfoperatwu support Dlwslen Phone:909-387-8005 Fax;909-387-8043 825 East Third Street Room 108 San Bernardino,CA 924154=5 SA.`6ERNARM0 COUNTY Ourfob is to create a county in which those who reside and invest can prosper and achieve well-being. wwmmm1sh0k*)w.sbcounty,aov County of San Bemembno Conhdentlably Notice.This communication coMains c ortfidential information sent sotely for the use of the intended m apient tf you are not the intended redpieat of this communication,you are not authonzed to use it in any manner,except to immediately destroy it and notify the sender From: Ross Wittman mailto:rwi n o I .or Sent:Wednesday,June 28, 2017 3:19 PM To:Ali, Mohammad; Mish, Marty Cc:Joseph Long; Patty Baker Subject. City of Redlands-Orange Blossom Trail Phase 3: File 3-501/2.04 Permit No.: P-32016055 Mohammad, I am in receipt of your letter dated June 26,2017 regarding the District's review of the Orange Blossom Trail Phase 3 project.City staff will be making the requested changes and providing you with updated plans shortly. In regard to Flood Control's assertion the initial$5,450 for permit fee review being exhausted and request for an additional$9,000 for review,can you provide me with a breakdown of Flood Control's expenditures for their review of the project.I will need this to process payment at the City. Thank you, R055 WITTMAN SENIOR PROJECT MANAGER CITY OF REDLANDS twittman ci frediands.or till:909.798.7S24 x1 825 East Third Street,San Bamanlino,CA 92415-0835 I Phone:909.387.7910 Fax 909.387.7f �.; Department of Public Works SAN BERNARDINO • Flood Central Kevin Blakeslee,P.t (-'O�l�TT"�j • Operations l3iractr COUNTY�J 1 1 + gelid Waste Nianagement _. • surveyor • Transportation .tune 29,2017 Permittee: City of Redlands File: 3-501/2.04 35 Cajon Street, Suite 15A Permit No: P-32016055 Redlands, CA 92373 Attention: Ross Wittman Senior Project Manager Permit Activity: Construct,operate,and maintain Prase III of the City's Orange Blossom trail,which will consist of flinch AC pavement for multi-use, as well as a single DG segment for pedestrian use immediately west of Tennessee Street, and which will also include a rest area with concrete benches, a table, waste receptacles and landscape boulders. Also included is decorative concrete paving,a 6-inch concrete curb, a 24-inch HDPE side drain connection,and PVC fencing to be maintained by the City. Facility: Mission Channel Locations: 1) Between Bryn Mawr Avenue and California Street,and 2) between Alabama Street and Tennessee Street City/Community: City of Redlands This letter supersedes the District's letter dated June 26, 2017. The figures listed on Page 3 of this letter have been revised. The District has reviewed your latest submittal and offers the following comments: 1. East of Bryn Mawr Avenue, there is an existing CMP drain into Mission Channel that the City is proposing to remove a portion of and install an HDPE inlet and drain pipe connection. All side drains within District right-of-way must be RCP with a minimum 24-inch diameter and 1350 D-Load. 2. Swale drainage disposition is unclear between Kansas Street and Tennessee Street. A RCP side drain may be necessary within this reach. 3. Extend the setback to the gate and bollards shown on Entry Detail #5 on Sheet 12 of 17 an additional 15 to 20 feet. 4. Please indicate on the plans why the last approximately 300 feet of trail up to Tennessee Street is constructed of Decomposed Granite as opposed to asphalt concrete. City of Redlands June 29, 2017 Page 3 of 3 4. Please modify all SBCFCD RMl lines where noted: a. Sheet 5-California St. and Redlands Blvd. b. Sheet 7-Mission Channel at Kansas St. C. Sheet 9—Entry Detail#2 d. Sheet 10—Entry Detail#4 e. Sheet 11 —Entry Detail#2 f. Sheet 12—Entry Detail#4 g. Sheet 13—Entry Detail#4 A resubmittal consisting of four sets of revised plans incorporating the above comments will be required along with a PDF copy of your entire submittal. Failure to submit a cover letter could result in the submittal being returned without District review. In addition to the above, a recent audit of the District's records indicates that your initial review fee deposit in the amount of $5,450 has been exhausted, and additional costs have been incurred by the District during its review of this request. The District's current review costs associated with this request total approximately$14,950, resulting in excess review costs in the amount of$9,500. In order to cover the District's expenses necessary during its ongoing review of this project, you are requested to submit the excess balance along with an additional review fee deposit of $1,500, for a total amount due of $11,000 ($9,500 + $1,500). Please make your check payable to the San Bernardino County Flood Control District, and reference the above noted permit and file numbers. Also, please fill in the requested payment information on the attached invoice and return it along with the check to the address shown on the invoice. At the completion of all permit activities, an additional accounting of the District's costs will be conducted, and if the fees submitted are in excess of the fees required, the District will prepare a refund of the excess fees submitted. Please be advised additional review fees may also be required if the additional review deposit is expended during the District's ongoing administration of this permit. If you have any questions regarding the above, please contact the undersigned at(909) 387-7995. Sincerely, MOHAMMAD ALI, P.E. Permit Engineer MA:MM:nl Attachments -RedlondcComLtr.06292017 CTTV w unIon Unk,N.AL�n lo IM3skEiew 9D-41E0 -w pwL CA417w t= Check No. 169712 c A s. s t� o it x t w POBm300-Refeods,CA92373 ACCOUNTS PAYABLE CHECK Check ate 08/25/16 FIVE Thousand FOUR Hundred FIFTY Dollars and ZERO PAY IHIS AMOUNT Cents **** $ 5,450.00 PAY TO'I'IiE VOID IF NOT CASHED VATHIN SIX MONTHS ORDER OF. SAN BERNARDINO COUNTY FLOOD CONTROL ' DEPARTMENT OF PUBLIC WORKS ~ � 825 E THIRD STREET ROOM 201 5AN BERNARDINO, CA 92415 1 THIS CHECK CONTAINS SEE FOR DETAILS INVOICE DATE INVOICE NO. PO NO. AMOUNT PAID DESCRIPTION 08/09/16 P32016055 5,450.00 FILE 3501/2 . 04 CITY OF REDLANDS VENDOR ACCT N0. CNECK DATE CHECK TOTAL VENDOR NO. CHECK NO. 08/25/16 5,450 .00 V04001160 169712 CITY OF REDLANDS DISBURSEMENT VOUCHER TO: FINANCE DEPARTMENT DATE: 819/2016 C61 W� FROM: Municipal Utilities 8„Ennineering PAY TO:2222 ref San Bernardino Flood Control District _ INVOICE DATE: 814aG16 Department of Public Works RECEIVED Attu:Administrative Services AUG 0 9 2016 825 East Third Street evymoi0 San Bernardino,CA 92415-0835 1� f-7 FINANCE DEPARTMENT IN PAYMENT FOR: Construct,operate,maintain,OBT Ph III along❑istricrs Mission Channel between Mountain View Avenue and California Street b) . a AMOUNT NO. INVOICE NO. AMOUNT 240400-5392/47o19 0 File Permit No_P-32016055 $ 5,450.00 L P E U AUU 7 s 2016 GRAND TOTAL $ 5,450.00 PREPARED BY: Patty Baker APPRO BY AUTHORIZED BY: i '- "'b'--•' 625 fast Third Street.5a n Bernardino CA 9241"035 t Phone 909 387.8104 Fax 909 387.8130 i SAN BEERN�A7R�D7-I�NO Department of Public Works COUNTY1 V 1 Y • ErWraamental&Conslrucilon . Flood Control Garry Newcombe PUBLIC WORKS o OperalIons • Solid Waste Management Director •Surveyor • Transportation PERMITSIOPERATIONS SUPPORT DIVISION INVOICE PER ITTEE: City of Redlands 35 Cajon Street,Suile 15A Redlands.CA 92373 Q- 3 EgRMIT NO: P-32016055 FILE NO: 3-501/2.04 DPW WO#: AP32016055 ITEM NO. ACCOUNT CODE DESCRIPTION CHARGES 703 RFL 093 8350 Plan Checks/Review Fee $ 5.450.00 TOTAL $5,450.00 "Payment in full is requested" PLEASE INCLUDE PERMIT NUMBER ON THE CHECK "Please include Invoice Stub with Paymenl" "Please Include Permit Number on Check" INVOICE STUB FOR PERM ITSIOPERATIONS SUPPORT DIVISION PERMITTEE: ACCOUNT CODE ITEM NO. DESCRIPTION CHARGES City of Redlands 35 Cajon Street,Suile 15A Redlands,CA 92373 RFL 093 8350 703 Plan Checks/Review Fee S 5,450.00 PERMIT NO: P-32016055 FILE NO: 3.50112.04 DPW WO#: AP32016055 Make Checks Payable to: AMOUNT San Bernardino County Flood Control District DUE Department of Public Works $5,450.00 P-32016055 Attn: Administrative Services 825 E.Third Street,Room 201 San Bernardino,CA 9241 M835 ENTER AMOUNT PAID: 825 East Third Street,San Bemardino,CA 92415-08351 Phone:909,387.8104 Fax:909.387.8130 www.sscounty.go: SAN BERNARDINO Department of Public Works Gerry Ne Doe boe COUNTY • Environmental& Construction * Flood Control • Operations • Solid Waste Management • Surveyor * Transportation August 4, 2016 Pernuttee: City of Redlands File: 3-501/2.04 35 Cajon Street, Suite 15A Permit No: P-32016055 Redlands, CA 92373 Attention: Ross Wittman Senior Project Manager Permit Activity: Constnict, operate, and maintain Phase III of the City's Orange Blossom trail along the District's Mission Channel, which will consist of flinch AC pavement for the trail for multi-use, as well as DG segments for pedestrian use, and which will also include irrigation, landscaping, a rest area with benches, decorative concrete paving, a 24-inch HDPE side drain connection, and PVC fencing to be maintained by the City Facility: Mission Channel Location: Between Mountain View Avenue and California Street City/Community: City of Redlands The District is in receipt of your application along with plans submitted for the above noted activity and is reviewing your request; please allow three to four weeks from the date of this letter for this review. A review fee deposit in the amount of$5,450 will be required for this review; please make your check payable to San Bernardino County Flood Control District and reference the above noted permit and file numbers. Also, please fill in the requested payment information on the attached invoice and return it along with the check to the address shown on the invoice. Attached for your use is the District's Permit Fee Schedule No. FCD 16-01. Pease be advised that if the cost of the District review is less than the deposit amount, the District will issue a refund for the difference. However, if the cost of the review exceeds the deposit amount, the Permittee shall be responsible for the difference. If you have any questions regarding the above, please contact the undersigned at(909)387-7995. Sincerely, MOHAMMAD ALI, P.E. Permit Engineer MA:MM:lb Attachments o-GRedAcWr-oswzot 5.d oa