Art3_SanBernardino_FY11_BikePed_GstRialto_Comm_210301Hi Saba,
The invoice you last submitted for the TDA Article 3 award still did not meet the minimum match requirement, was missing photos of the completed project, and was inconsistent with the
amount shown on the City’s May 19, 2020 authorization to invoice SBCTA. It seems to me, that the first invoice <ftp://gis.sanbag.ca.gov/Expires210331_SanBernardinoTDA3/Art3_SanBernardino_FY11_BikePe
d_GstRialto_Inv_190519.pdf> San Bernardino submitted might be the best one to revise since it is most consistent with what was taken to City Council. You can find a copy of it, the
other invoices, a record of some of our communications, and a clean copy of the Claim Package on our FTP site using this link <ftp://gis.sanbag.ca.gov/Expires210331_SanBernardinoTDA3/>
.
There has been a recent modification to eligible match requirements that might help. The City Payroll Construction cost totaling $2,144.34 noted in the first invoice as part of the project
total cost would be considered eligible for local match IF the expense was for necessary staff time directly related to in-house completion of design, right-of-way acquisition, or construction
including inspection and/or construction management. Assuming that cost is eligible, this invoice would need the following additions/modifications:
1) Photos of the completion project
2) A signed Claim Form
3) Backup documentation showing $2,144.34 is an eligible expense
4) A signed Reimbursement Request
If the $2,144.34 is not an eligible expense, or if you are unable to provide backup documentation for the expense, the first invoice Reimbursement Request & Claim Form would need to
be modified to show a total project cost of $39,324.99, of which SBCTA would reimburse the City for $33,426.24 with a local match of $5,898.75.
Whichever the City decides to go with, the key is that the SBCTA will only reimburse 85% of the total eligible project costs and the invoice must adhere to the invoice requirements noted
in the Check List (see Claim Package).
Please let me know if you have any questions.
Regards,
Ginger Koblasz
Senior Planner
1170 West Third Street, 2nd Floor
San Bernardino, CA 92410
909.884.8276 | Office
From: Saba Engineer [mailto:Engineer_Sa@sbcity.org <mailto:Engineer_Sa@sbcity.org> ]
Sent: Wednesday, February 03, 2021 9:27 AM
To: Ginger Koblasz
Cc: Nancy Strickert; Alex Qishta; Azzam Jabsheh
Subject: RE: Expired TDA Article 3 Grant Awards
Greetings:
Ginger
Please see attached invoice regarding Bike Lane on ‘G’ Street FYI. Finance will be submitting invoice via email. Do you need original to be mailed out.
Also regarding other two grants, work has been done but I have be unsuccessful in locating the projects to prepare invoices. Please advise what to do.
S-1606-41
1
0060 Sierra Way @ 40th
S-1606-41
3
6811 4th @ Waterman
S-1606-41
2
7711 3rd Street @ Palm
S-1606-41
4
8447 2md @ Glovanola
This work has been completed but I could not locate the project files to prepare invoices.
Let me know if you have any questions.
Thank You
Saba Engineer, P.E.
Principal Civil Engineer
Public Works Department
201 North ‘E’ Street
Suite 200
San Bernardino, CA 92401
Office: (909) 384-5284
Fax: (909) 384-5190
From: Ginger Koblasz [mailto:gkoblasz@gosbcta.com <mailto:gkoblasz@gosbcta.com> ]
Sent: Wednesday, January 27, 2021 8:46 AM
To: Saba Engineer
Cc: Nancy Strickert
Subject: FW: Expired TDA Article 3 Grant Awards
Importance: High
Caution - This email originated from outside the City - Verify that the Email display name and Email address are consistent. - Use caution when opening attachments.
Saba,
The FY15 Four Transit Stops award for $42,539 that expired on 12/31/2018 was for stop improvements at the following locations:
S-1606-41
1
0060 Sierra Way @ 40th
S-1606-41
3
6811 4th @ Waterman
S-1606-41
2
7711 3rd Street @ Palm
S-1606-41
4
8447 2md @ Glovanola
What is the status of this award?
Thanks,
Ginger
_____________________________________________
From: Ginger Koblasz
Sent: Tuesday, January 19, 2021 3:33 PM
To: 'Saba Engineer'; Nancy Strickert
Cc: Alex Qishta
Subject: RE: Expired TDA Article 3 Grant Awards
Hi Saba,
That is not the award referenced in No. 2 below; the 2019 transit award project has not yet expire therefor I did not include it in my inquiry.
Unfortunately, my predecessor did not leave his records in the best of shape so much of what I've been working from are adopted SBCTA Board items (see last page of attached) and financial
records maintained by our Fund Administration group.
Nancy, does the Transit Department happen to have any records pertaining to Allocation S-1606-41?
Regards,
Ginger
<< File: Art3_All_FY15_Board_Awards_160406.pdf >>
-----Original Message-----
From: Saba Engineer [mailto:Engineer_Sa@sbcity.org <mailto:Engineer_Sa@sbcity.org> ]
Sent: Tuesday, January 19, 2021 12:43 PM
To: Ginger Koblasz
Cc: Nancy Strickert; Alex Qishta
Subject: FW: Expired TDA Article 3 Grant Awards
Ginger
Project No. 2 below, is it the same as awarded grant in the attached letter.
Thank You
Saba Engineer, P.E.
Principal Civil Engineer
Public Works Department
201 North ‘E’ Street
Suite 200
San Bernardino, CA 92401
Office: (909) 384-5284
Fax: (909) 384-5190
-----Original Message-----
From: Saba Engineer
Sent: Tuesday, January 19, 2021 10:56 AM
To: 'Ginger Koblasz'
Cc: Alex Qishta; Nancy Strickert
Subject: RE: Expired TDA Article 3 Grant Awards
Greetings:
Ginger
1. FY11 Bicycle Lane Extension along G St. and Rialto Ave ($51,000)
I am working on revising the claim form and will submit you on or before March 30, 2021
2. FY15 Four Transit Stops ($42,539): This award expired on 12/31/2018.
The project is completed. I will be submitting invoice on or before April 30, 2021
3. FY17 Lynwood @ Merito EB Transit Stop ($4,248): This award expired on Oct 4, 2019.
The project is completed. I will be submitting invoice on or before May 30, 2021
Let me know if you have any questions
Thank You
Saba Engineer, P.E.
Principal Civil Engineer
Public Works Department
201 North ‘E’ Street
Suite 200
San Bernardino, CA 92401
Office: (909) 384-5284
Fax: (909) 384-5190
-----Original Message-----
From: Ginger Koblasz [mailto:gkoblasz@gosbcta.com <mailto:gkoblasz@gosbcta.com> ]
Sent: Friday, January 15, 2021 3:40 PM
To: Saba Engineer
Cc: Alex Qishta; Nancy Strickert
Subject: RE: Expired TDA Article 3 Grant Awards
Caution - This email originated from outside the City - Verify that the Email display name and Email address are consistent. - Use caution when opening attachments.
Hi Saba,
Unfortunately, in order to provide an extension for these awards, we need an explanation for the delays, revised completion dates, and a commitment to complete the projects by the revised
dates.
Regards,
Ginger
-----Original Message-----
From: Saba Engineer [mailto:Engineer_Sa@sbcity.org <mailto:Engineer_Sa@sbcity.org> ]
Sent: Wednesday, January 13, 2021 1:10 PM
To: Ginger Koblasz
Cc: Alex Qishta; Nancy Strickert
Subject: RE: Expired TDA Article 3 Grant Awards
Greetings:
Can we get extensions on all three of these and I will provide information.
Thank You
Saba Engineer, P.E.
Principal Civil Engineer
Public Works Department
201 North ‘E’ Street
Suite 200
San Bernardino, CA 92401
Office: (909) 384-5284
Fax: (909) 384-5190
-----Original Message-----
From: Ginger Koblasz [mailto:gkoblasz@gosbcta.com <mailto:gkoblasz@gosbcta.com> ]
Sent: Wednesday, January 13, 2021 10:11 AM
To: Saba Engineer
Cc: Alex Qishta; Nancy Strickert
Subject: RE: Expired TDA Article 3 Grant Awards
Importance: High
Caution - This email originated from outside the City - Verify that the Email display name and Email address are consistent. - Use caution when opening attachments.
Hi Saba,
Have you been able to make any progress on addressing the projects below?
Thanks,
Ginger
-----Original Message-----
From: Saba Engineer [mailto:Engineer_Sa@sbcity.org <mailto:Engineer_Sa@sbcity.org> ]
Sent: Thursday, December 10, 2020 6:27 PM
To: Ginger Koblasz
Cc: Alex Qishta
Subject: Re: Expired TDA Article 3 Grant Awards
Greetings
Ginger
I will get back to you shortly to take care of this.
Thank you
Saba
On Dec 10, 2020 3:47 PM, Ginger Koblasz <gkoblasz@gosbcta.com <mailto:gkoblasz@gosbcta.com> > wrote:
Caution - This email originated from outside the City - Verify that the Email display name and Email address are consistent. - Use caution when opening attachments.
Dear Saba,
I am in the process of putting a Board item together requesting recessions and extensions for TDA Article 3 awards and need to make sure we have all of our outstanding award issues addressed
before doing so. I sent you and your team a couple of emails in early October regarding several of the City’s expired awards however, none have yet been addressed/resolved. If an extension
is needed for any of the following expired awards, please provide a written request via email with explanation for delay and revised completion date by December 31, 2020. I am only
able to grant award extensions up to two years past the original deadline. Anything beyond that will be included in my Board item. Or, if any of these awards need to be rescinded due
to project cancelations, kindly let me know that as well.
1. FY11 Bicycle Lane Extension along G St. and Rialto Ave ($51,000): We are still missing a completed and signed Claim Form with an adjusted Reimbursement Request Form that excludes
ineligible City staff match expenses. If this was submitted via hard copy through the mail, please send me a copy via email as our office is largely closed these days. Previously, SBCTA
staff approved extensions that exceed their two year authority. If we can’t get this one wrapped up by December 31st, we’ll have to take this one to Board.
2. FY15 Four Transit Stops ($42,539): This award expired on 12/31/2018.
3. FY17 Lynwood @ Merito EB Transit Stop ($4,248): This award expired on Oct 4, 2019.
Please let me know if you have any questions or need any additional information.
Regards,
Ginger Koblasz
Senior Planner
1170 West Third Street, 2nd Floor
San Bernardino, CA 92410
909.884.8276 | Office
[cid:image001.png@01D6CF05.1BF02F40]
From: Ginger Koblasz
Sent: Tuesday, October 06, 2020 1:53 PM
To: 'Engineer_Sa@sbcity.org'
Cc: Michele Fogerson; 'qishta_al@sbcity.org'; 'singery_sa@sbcity.org'
Subject: RE: TDA article III Grant Reimbursement
Hi Saba,
I apologize as it does not look we ever paid this one. We do appear to have some of the required documents on file including the Authorizing Resolution and Minute Action authorizing
project completion. However, it looks like we’re missing a signed Claim Form. It also looks like staff time has been included which is not considered a TDA Article 3 eligible match.
Can you please complete and submit a signed Claim Form and adjust the Reimbursement Request Form to exclude City staff expenses?
Please let me know if you have any questions or need anything else.
Regards,
Ginger
From: Ginger Koblasz
Sent: Tuesday, October 06, 2020 1:03 PM
To: Engineer_Sa@sbcity.org <mailto:Engineer_Sa@sbcity.org>
Cc: Ellen Pollema; Michele Fogerson; qishta_al@sbcity.org <mailto:qishta_al@sbcity.org> ; 'singery_sa@sbcity.org'
Subject: RE: TDA article III Grant Reimbursement
Hi Saba,
I’ll be looking into this for you. I’ll let you know what I find out shortly.
Regards,
Ginger
From: Ellen Pollema
Sent: Tuesday, October 06, 2020 12:58 PM
To: Ginger Koblasz
Subject: FW: TDA article III Grant Reimbursement
From: Saba Engineer [mailto:Engineer_Sa@sbcity.org <mailto:Engineer_Sa@sbcity.org> ]
Sent: Tuesday, October 6, 2020 12:54 PM
To: Ellen Pollema <epollema@gosbcta.com <mailto:epollema@gosbcta.com> >
Cc: Samuel Singery <Singery_Sa@sbcity.org <mailto:Singery_Sa@sbcity.org> >; Alex Qishta <Qishta_Al@sbcity.org <mailto:Qishta_Al@sbcity.org> >
Subject: TDA article III Grant Reimbursement
Greetings:
Ellen
Can you please help me out. We submitted attached invoice to SBCTA in February 2019. We have not received the reimbursement yet. Whom should I contact. Thank you for your assistance.
Thank You
Saba Engineer, P.E.
Principal Civil Engineer
Public Works Department
201 North ‘E’ Street
Suite 200
San Bernardino, CA 92401
Office: (909) 384-5284
Fax: (909) 384-5190
<< File: Art3_All_FY15_Board_Awards_160406.pdf >>
얄츼㪓চ輾�䏑⩷乘ꤿ뽰σᚎ∽邹忳呬⃗ɔ㩅瀗췈鳌㕉⇍纓篧뿖썯寮迪䓂ほ⋯킓ᕿꌣ챁⛖峀㳱帟瓀㝂㩘햊贾鱹㴞攃⒆噤츫ꙡ⪕㓯馱Έ亝攭�畬�⌳씵슏⓫㮣㾧匋ⷺ⋄吝몲錗垜媯鴈ቹ嶢߃䥧咖ㇺ훦쇨쏲㕩欫蟇ㇰ櫫頌쓎鷙ቀ禧ʷ歃吧�絊㓩꒱䓮琳邲ೊ亵疞ꭣ�뛇ᾓ靈튢먅堤餐ꌆᣗ籘骺䬂榓凲毭켡ᣂཹ∭웇䀓绖磖뽖Ⳅ欮�舿뎙츈쳑䳇롾隅⥑ۆ猷ˏᢎꥉ⭈㑭ᮣ艿ꓭꍐ镙낅낏홖ꑔ䮴쇶颿柲寥⑅፝鈬뿒༰
卥婈䑢獢ᮓ넷ϒø眉찥Β�沍炼饭ើꊟ㦥苒꽙ᚭ씳ힰ㬬欄夁劂手툁怡綋痜킬晋⾖蚉多㊟䳺鍒␞ꡙ蠊䞤汜㗒⋁쵛﵇꼺豸ȳ躀�᳢錌栕锰ﴄ㨊쪟殦乶쑽ꂟⅫ꽚ꑑ萔䜲퍂곓䠍ၙ燰혩Ĝ౧ں匦泹黿닀䩪浡䭾퀁䞖팓텗㉘ꖰ禈싒㙉싸懶Ⲻ摘랡첲苤쳥䕧連欍㐢⍘쓷䢈掀菢꧐云礗듎ғﱙ侣㸢沏梬ě䬢촉ぢ䥡偒澒ɡ雎ᓺ犓䉆䙿퍆�㻺甓튌嫤㰼Ἆ籭䬡ڗʋꃌ隢늱샧됼ﲆ凞琐횖㍤厣騵궄ꅛ됥瀿聈䱡Ỻꓴ頬電荰ꡋ
堹ᔌ䕍䔟ա슄뺽腕ፒ̊塚紜鸩事ᚴ༚蠌⋯٥丂䳣囟䌂靎謇䧲箣飃緺绷杲뫎ﴑ⤔槦⺬杽⤓ᪿ븎蛔텊鱏曙팭唴꣺稚ᬛ迷췹䴠ᚎ㙎夜쵵볢㺆쭏嵐冈瀗利짋懝蜫㢖ꎨ钙쌳즧㵹븛ⵀ鿾빳狓嵃狀腩˥裞뫒狁ג赲惝䂹롢溌岰묌腴捜堷逮뢍⸘ᮣᜬ⻃⁝�阍搋⸣쮆ۨ쒻ꪬ羹谑৴⠬앃汥칼똂냎駇㫉〈⥼�梭뾧질锗ථ爖걋䬃셕쭐ʸ䖪悤㌫퓾텾�캜䴭婨⦿�팋훯㿊컀䓛쭾桌辰擯�핦ⲗ茝Ṷ蓮Ὃꊐ娼䣚ٮ荬긕�喗Ṧ
⡛訉츨遫馿커갘歒䩼秢艉貒款팙튀뀃鋶郾းﲺ⦿➥ĝ�祏곭杬哎惗気쿣⣌看衇뉇໋㫰⦘ͦ嶝ᰒ꼶⏡砰괼ӷ굦녻컢霚髌쀑偶㒺걘獝寡ᳶМ젊뎂⸏붅躙牮䡚�輩模鲳챁䫮郏⓴紋꺠븜쿥⽃学笉㒊ྲྀℯꘈ峁䟳귕䩨�㹑䮘钶뻏蘶쳝鴍ỳ搘⧦쐊斁吤镽⥵ㇶ픉啒�위럊欇᳇閂ൻ�辰レ돗厮墳꼌펕搗❲朁筮镗曏펓Ļ欖왖䟤뉠宯鳏錎サ멍�꾸몏뢇Ḑᬎ埌佔못ኻ㝆驘ᕮ箪䪡�ꨚꉳ�鮜몋㗴챣悷粮֞篾ꈳ堙㐜閩橬樂�춃틯
첧姖懩਼悋죒㏊㈒眕㳆赂팣ࠒ唈⑬䘷룏媒⫫�䌟瀟촍�怒뭻鲾⥃㍘뇅쇷ꪏ喭䙵搜氦멮챝亖薂⊣㺭Ƕ艪ち繷㪢谅忁辁ᒛ鬈닇堈ꏩ螖桠Ӳ톗⋟唅픰篤쭓紘ꌦ칱詣䯨穭툎㖥⺋ᰵ䱲�㩑䋯ᒋ턀ؐᰗ露ꎅ䐶쌩䕔क़誵䲞蓚⥭룆荿堣䊤렺㛱髻媵롮ଔↅﴧ釓격댲ᓦ䬜싓븧�⍠ᇩὢ욳Á�椋胉茀Š승챃醗䦘䵐䆅服ۉ�쏨兮⒗ះ露㫒㌴僆廾ꭼ퓕䍰Ɪ懶㑿洁�ꪤ髝䦺룤犬�켶鎣⎓ਦ蜼�壵㭞䢹ڗ툋鏇㬃璀Śэﺙਉ⩪謂Ͷ뤐줭�贷ዽ㣰ᆴ
㙎ꮴ綰탣꿅⪐킵㠉䍞⩸쩢揼꠸ꐝ촚ꢃꐉꠠᮺ颛ꛬ㽩톆ퟠ診馚ꛉ祻惟珲湹䄣㟸䗺섺�啛ᨓ鹅슲嫖융�䜾꙼狒槊㢥㵦鿯탦Ք北㺤簧륢匞婣榤˨쯎㗉䜾�ᅠ劂碑첁鎆덗᜴팖撗ԣ촤�춦暂鹩퓖᭞䄇껙燈斅匧쐕ࠤ介禤崶残畨隮欇줙铈朆梋챍⭧潎즛닩Ж㢚髩ㅨ䁒嗏㒺员쌔㹡飺鯻䖈�萠礥걂놵﮼眦ⲝ䏦縭叓藧ꔬ予뵍ዓࣽ坧舶깎該㤒팯ᚈ揂ᮚ糸땸䣠藘ꃛ尙⟎ꍓ�ꙏ頥㝥緥ජ揩ᄨ贞뱬쬼貉⬼緻딵廊�餮鸜昤禦镊ꮐ谄냢
㜷叝�㺻ڦ䒛䌭魓舲ᨀퟯ튴㯯烃⻅ᘍ眫簩�鎀�卤킺ഖ綪≛븜貴⫩끢�쏫喅鮪鱷ﺹ㒯ᤋ난ର뛖哷ᇏ놤ᡷ⾊륗ⴒྦ頩ㅷ礪캏䴲촔瞂㯋湼꤀ғ떟蹳鈂Ꝇ䕖Ц�뉯왢*ᬂ铟쉟큇怄᬴頻沔鴘歰ꯓ绰ゎ䒛䖰暑뇴翴၈㝸캾㋑ഢ泷햙뾷紇矂棨꾳辦䁹㏹〵蹨Ꮼﰅ曬㛸ֽ㾃率钛敟뎗詷豾읎㶹틩텠㧂詵ꡎM᭘웾鼅䢠⫖Ⅷ썣谤�ᩳ䟛쨤ߐ胎鴾넠웘枡굜ᴢ붛櫣䘌툥撃穯ᆝ囈岕篓﵆㺝䃒뤕㗘Хܤ䓴釒玤中梪묦훭䲿島圞硲诐돪㨱冝흫〧
Ɽ㬈퐌㭜䬾껉截짫Ṽ錻퉭㡕匽觌鏌巉重ꑬᚏͦ㸻瓖⬈橭䍑ᇒ㢷仧ṏ鴆喦淎湣䕸㬍2䳬ꗒꋁ閲餲ஒ鎦澝嵤탃㣴鬣낝읹場씵媉톄⦃䬦⊢ᕪ톓턙哐暉㣑厭⑧䂤℠�㷩蓢䤄榞䍉㦔좱러匿䜌槦Ⱔ邖ꍕᄉꆓ뵔ļ₅븉ﳣᡬ⎣⪚┕ޱפ髮鵓樂骴ẘ杆伪薴ʝ韴ࢴ⳺餴ꦢȴ쉁灻賖摺脏ᝠ园処嬣氏텝牺ᗢ�Ʃ푃䂈됁캃澮믋综箜褣㏇靈謆ꟓ�씟穌꿘楢퐾襢섿⇞㺍첂텯ꊂ鯽韏ێ䴵ቌ擯댟ꊩ跾䳓仱鹥쫂ᓹ瑧叉⡈윝牣ᳳ㵗䚩鈻Ⳍᱍ쨘㐚
툛ꢅ痂ꃉ㡊ᬫ昭퓷ၸ掍呂饦ヲᩄᗨ寙䌦⚅杀坖㔣㵔蝎婙磙ᗧ倿룎ፆ〈൚ཾωⓉ譍द器館貣辩弩⇅㚎⠇˚㩬髞绍㭛惚㺑䴤Ⴗ뱉丵鷿忼覓≍魌ҫ㜝槀ꣽ根퓎须醓䲼ࢳ亀�쫿蝓✕佹ᳫ䟐骜ꕀ쀲꺜躠拟꼦䰽ﶧὟ闲줁⟩枯録䵯鲢⛘㼑鵊骋䑊☺毮⿓𥉉巀綵說e褯昷뭁梺ᢽ㙵틩彬﮾ʶ惝뜹뫵��⠡❯㮚֯