Art3__FY21_Transit_City of Victorville Seneca Rd E. of Rodeo Dr_App - 8/1/2025 TDA Article 3 Grant Application: Transit Stop Access Improvements
Project Title City of Victorville Seneca Rd E.of Rodeo Dr
Contact Name Dana Fleming
Agency Victor Valley Transit Authority
Contact Phone 7609953479
Contact Email dfleming@vvta.org
Project Need& Project Description
Purpose Upgrade one ADA ramps leading to the existing bus stop, installing a 10'x 10'bus
pad, 150 linear feet of 6-foot-wide sidewalk along with 150 linear feet of 8"planter
curb.The ADA ramps, planter curb,and sidewalk and bus pad are to be installed on
the Northeast comer of Seneca Rd @ Rodeo Dr All work is done to ADA standards.
Attach Photos, Project 1 City of Victorville Seneca RD E of Rodeo
Documents,and a 2.04M6
Dr.pdf
Letter from Local
Transit Agency
Location Seneca Rd @ Rodeo Dr
Priority Number: (If 1
agency submits Note that up to 10 stops can be combined into one submittal.
multiple projects)
Daily Buses 29
Daily Boarding& 2
Alighting
Agency Owns ROW Yes
No
ROW Easement Yes
Required No
Cost Effectiveness
Project Cost(K): 25,695.00
Matching Funds(K): 5,139.00
TDA Project Funds 20,556.00
Requested(K):
Matching Source: VVTA/LTF
Previous Awards & Status
Project Evaluation
Criteria Overall Quality of Application: 15 pts
Project Need and Purpose: 30 pts
Cost Effectiveness: 20 pts
Timeliness of Prior Project Completion: 15 pts
Matching Funds: 20 pts
have read the (1)the total award amount will be rescinded if the agency fails to submit a Claim Form
guidelines and and Authorizing Resolution within SIX months of award notification,and
understand:*
have read the (2)two one-year extensions may only be granted without SBCTA Board approval IF:
guidelines and (a)progress has been made on the project,and(b)an extension request including an
understand:* appropriate justification for the delay and a revised project completion date is provided
THREE MONTHS BEFORE the project sunset date.
Priority# 1
Project Title: SENECA RD E/O
RODEO DR ON THE NORTH SIDE
Biennial Article 3 20% Fund
Call for Projects Application Form
I . Priority # 1
2.Project Title: SENECA RD E/O RODEO DR ON THE NORTH SIDE
3.Project Description (attach photos and more thorough description as appropriate):
Upgrade one ADA ramps leading to the existing bus stop, installing a 10' x 10' bus
pad, 150 linear feet of 6-foot wide sidewalk along with 150 linear feet of
8"planter curb. The ADA ramps, planter curb, and sidewalk and bus pad are to be
installed on the North East comer of Seneca Rd@ Rodeo Dr All work is done to
ADA standards.
4.Location:
X
X
Seneca Rd @ Rodeo Dr
Existing Bus Stop
Existing ROW
New Bus Stop
Easement Required
5.Project Cost Estimate:
6.Non-TDA Article 3 Project Matching Funds:
Source of Matching Funds: LTF Funds
7.Requested Article 3 TDA Call for Project Funds:
8.Location Characteristics:
$ 25695.00
$5139.00
$ 20556.00
56 Bus Routes Serving Location
29 Number of Daily Buses Serving Location
2 Daily Boardings and Alightings
Anticipated ADA Cost Savings
9.Relationship to 2011 Non-Motorized Transportation Plan projects, if any:
I0. Listing of Activity Generators and Attractors Served:
BRDI303a2-ss
Non Applicable