Loading...
Art3_Highland_FY15_BikePed_Connector_ScopeRqst_RedlandsPPRmap1 MOBILIZATION LS 35,000.00$ 1 1 35,000.00$ 2 CONSTRUCTION SURVEY AND MONUMENTATION RESTORATION LS 20,000.00$ 1 1 20,000.00$ 3 TRAFFIC CONTROL AND CONSTRUCTION PHASING LS 20,000.00$ 1 1 20,000.00$ 4 STORMWATER BEST MANAGEMENT PRACTICES/ SWPPP LS 5,000.00$ 1 1 5,000.00$ 5 CLEARING AND GRUBBING LS 15,000.00$ 1 1 15,000.00$ 6 SITE GRADING (CUT)CY 70.00$ 57 60 4,200.00$ 7 REMOVE EXISTING SHRUBS, TREES, AND ROOTS. DIAMETER LESS THAN 36".EA 500.00$ 1 1 500.00$ 8 CONSTRUCT 8" AC DIKE PER CITY OF REDLANDS STD. PLAN 149-0.LF 15.00$ 470 494 7,410.00$ 9 CONSTRUCT 4" AC TRAIL TN 100.00$ 620 651 65,100.00$ 10 CONSTRUCT 6" CMB CY 75.00$ 445 467 35,025.00$ 11 CONSTRUCT 4" PCC TRAIL OVER 90% COMPACTED NAIVE.SF 8.00$ 11,780 12,369 98,952.00$ 12 CONSTRUCT 4" PCC SIDEWALK OVER 90% COMPACTED SUBGRADE PER CITY OF REDLANDS STD. PLAN 701-0.SF 8.00$ 310 326 2,608.00$ 13 CONSTRUCT PCC CURB RAMP PER SPPWC STD. PLAN 115-5 INCLUDING CURB AND GUTTER, AC SLOT PATCH, RETANING CURB, AND SIDEWALK. CASE AND TYPE AS EA 4,500.00$ 3 3 13,500.00$ 14 WATER VALVE/WATER METERS BOXES TO BE ADJUSTED AS SHOWN ON PLANS.EA 250.00$ 1 1 250.00$ 15 CONSTRUCT GATE PER SPPWC STD. PLAN 602-3, LENGTH AS SHOWN ON PLANS.LF 50.00$ 65 68 3,400.00$ 16 CONSTRUCT REMOVABLE BOLLARDS PER PLAN AND DETAIL SHEET 22 EA 500.00$ 6 6 3,000.00$ 17 CONSTRUCT 4" AC PAVEMENT TN 100.00$ 45 47 4,700.00$ 18 CONSTRUCT 6" CMB CY 75.00$ 35 37 2,775.00$ 19 RESTORE IRRIGATION IN KIND.LS 5,000.00$ 2 2 10,000.00$ 20 RESTORE LANDSCAPE IN KIND.LS 5,000.00$ 2 2 10,000.00$ 21 CONSTRUCT CONCRETE MOW CURB.LF 45.00$ 2,293 2,408 108,360.00$ 22 ADJUST MANHOLE FRAME AND COVER TO GRADE EA 600.00$ 2 2 1,200.00$ 23 SIGNING AND STRIPING LS 128,750.00$ 1 1 128,750.00$ 24 SLURRY SEAL ELT 350.00$ 20 21 7,350.00$ Subtotal 602,080.00$ 25% Contingency 150,520.00$ Const. Cost 752,600.00$ City of Redlands ATP Cycle 2 Regional Connector Project (Phase 1) 95% Engineer Estimate Actual Quantity Estimate Quantity Cost ITEM No ITEM DESCRIPTION UNIT UNIT PRICE Copyright nearmap 2015 ATP Cycle 2Phase 1 OneStop.mxd This map was produced by the City of Redlands,Geographic Information System. The City of Redlands assumes no warranty or legal responsibility for the information contained on this map. The data used to generate this map is dynamicin nature, therefore the information shown may or may not be the most current. September 15, 2022 . LOCATION MAP Proposed ProjectSegment Legend City Limits PIONEER AVE DOMESTIC AVE ORANGE ST ORANGE ST PIONEER AVE CITRUS VALLEY HIGH SCHOOL TEXAS ST